1、*USACE / NAVFAC / AFCESA / NASA UFGS-10 22 43 (May 2011)-Preparing Activity: USACE Superseding without revisionUFGS-10 22 26.43 (August 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION TABLE OF CONTENTSDIVISION 10 - SPECIALTIESSECTION 10 22
2、 43SLIDING PARTITIONS05/11PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 Manual Operation1.2.2 Electric Operation1.2.3 Performance Requirements1.2.3.1 Fire Endurance1.2.3.2 Laboratory Acoustical Requirements1.3 SUBMITTALS1.4 SUSTAINABLE DESIGN CERTIFICATION1.5 DELIVERY, STORAGE, AND HANDLIN
3、G1.6 WARRANTYPART 2 PRODUCTS2.1 MATERIALS2.2 SLIDING PARTITIONS2.2.1 Panels2.2.2 Finish Covering2.2.3 Track2.2.4 Suspension System2.2.5 Tackboard2.2.6 Markerboards2.3 ACCESSORIES2.3.1 Doors2.3.2 Ceiling Guards2.3.3 Metal Soffit2.4 SEALS AND SWEEPSTRIPS2.5 ELECTRICAL OPERATORS2.6 COLORPART 3 EXECUTIO
4、N3.1 INSTALLATION3.1.1 Preparation WorkSECTION 10 22 43 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1.2 Electrical Operators3.1.3 Adjustment3.2 FIELD TESTS3.2.1 Operational Test3.2.2 Visual Test3.2.3 Acoustical Test3.3 CLEANING- End of Se
5、ction Table of Contents -SECTION 10 22 43 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-10 22 43 (May 2011)-Preparing Activity: USACE Superseding without revisionUFGS-10 22 26.43 (August 2010)UNIFIED FACIL
6、ITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION 10 22 43SLIDING PARTITIONS05/11*NOTE: This guide specification covers the requirements for sliding partitions.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing
7、this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not r
8、equired in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Designer should require materials, products, and innovative const
9、ruction methods and techniques which are environmentally sensitive, take advantage of recycling and conserve natural resources.Associated work found in other sections includes:Steel supporting members or hanger rods, Section 05 50 13 MISCELLANEOUS METAL FABRICATIONS.Wood blocking, rough bucks, and h
10、eaders, Section 06 10 00 ROUGH CARPENTRY.Wood trim, wood or hardboard ceiling guard, or soffits, Section 06 20 00 FINISH CARPENTRY.SECTION 10 22 43 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Lock cylinders, Section 08 71 00 DOOR HARDWARE.O
11、perator field connections to power sources and inner connection to control switches, Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.The following information should be shown on the drawings:1. Location, size, and pocket area of sliding panel partitions.2. Direction of operation, header conditions ind
12、icating height, track anchorage, track channel, and jamb conditions.3. Partition supporting structure. The structural support for the partition is not part of this section; it must be indicated and specified separately.4. A schedule of sliding partitions by type (manually or electrically operated),
13、sizes, and stack space and identified by mark number or letter5. For electrically operated partitions, show power source and desired switch location.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in
14、 the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Re
15、ference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this speci
16、fication to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM A653/A653M (2010) Standard Specification for Steel SECTION 10 22 43 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without licen
17、se from IHS-,-,-Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip ProcessASTM B221 (2008) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and TubesASTM B221M (2007) Standard Specification for Aluminum and Aluminum-Allo
18、y Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)ASTM C423 (2009a) Sound Absorption and Sound Absorption Coefficients by the Reverberation Room MethodASTM D 751 (2006) Coated FabricsASTM E 336 (2010) Measurement of Airborne Sound Insulation in BuildingsASTM E 413 (2010) Rating Sound Insulati
19、onASTM E 557 (2000; R 2006e1) Installation of Operable PartitionsASTM E 84 (2011a) Standard Test Method for Surface Burning Characteristics of Building MaterialsASTM E 90 (2009) Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and ElementsCHE
20、MICAL FABRICS TIA 11-1; Errata 2011) National Electrical CodeSECTION 10 22 43 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-SCIENTIFIC CERTIFICATION SYSTEMS (SCS)SCS Scientific Certification Systems (SCS)Indoor AdvantageUNDERWRITERS LABORATOR
21、IES (UL)UL 10B (2008; Reprint Apr 2009) Fire Tests of Door Assemblies1.2 SYSTEM DESCRIPTION*NOTE: The designer will edit this specification for manual or electric operation of sliding panel partitions as required for the project.*a. Supply and install manual and electric operation, acoustical slidin
22、g partitions, factory finished, supported from overhead track without with floor guides, as shown on the drawings including all hardware, seals, track and rollers as needed to close the specified opening.b. No less than 30 calendar days prior to the scheduled commencement of installation submit the
23、following to the Contracting Officer:Manufacturers QualificationsManufacturers Sample WarrantyStatement of Code ComplianceStatement of Standards ConformityVerification of Field MeasurementsExisting Electrical DataFabrication DrawingsInstallation Instructionsc. Submit drawings to demonstrate that the
24、 system has been coordinated and will properly function as a unit. Show layout of the work; track and jamb fastening methods; seal and installation details; and equipment relationship to other parts of the work including clearances for maintenance and operation.d. Submit three _ Color samples of spe
25、cified surfaces and finishes to match those specified. Finish and color requirements are not limited to manufacturers standard selections in order to meet these requirements. Also submit Certificate attesting that partitions have specified acoustical and flame retardant properties, as determined by
26、test.e. Submit Data Package 1 for sliding partitions, and Data Package 5 for electrical operators in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA.1.2.1 Manual OperationFor the manual operation provide a force no greater than 89 _ N 20 _ lbf to start movement at the rate of 1.02 m/
27、s 3.33 ft/s (200 ft/min). Use a removable handle to extend and retract the bottom operable seals; vertical movement of seals shall be 50 _ mm 2 _ SECTION 10 22 43 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-inches. Closure to the lead wall
28、shall be by use of a flexible bulb; accomplish final closing by means of a lever exerting pressure against the wall.1.2.2 Electric OperationDesign the pressure-sensitive leading edge so that a force of 17.8 _ N 4 _ lbf will stop the forward motion; system shall stop the partition movement if people
29、or objects are in the path of the partition when it is being extended or in the pocket area, when the panels are being folded. Provide a weight-sensitive floor mat in the storage pocket to prevent partition movement with as little as 2.3 kg 5 lbs of weight applied. Wall mount the electric control.1.
30、2.3 Performance Requirements1.2.3.1 Fire Endurance*NOTE: Select flame spread and smoke developed criteria to suit project.*For partitions more than 5.6 square meters 60 square feet in area, provide covering and lining with flame spread rating of 25 or less, fuel contribution rating of 15 or less, sm
31、oke generation of 50 or less in accordance with NFPA 101 when tested in accordance with ASTM E 84. 1 hour fire rating, UL 10B, or NFPA 252. Submit flame and smoke development testsreports. Door and partition finishes shall have a Class A rating when tested in accordance with ASTM E 84.1.2.3.2 Labora
32、tory Acoustical Requirements*NOTE: Specify sound transmission class as determined by project requirements. The requested rating should be between 35 and 54 STC. 39 and 40 STC are widely available. If more is required, another type of moveable partition should be used. Specify a panel weight of no le
33、ss than 14 kg per square meter (3 psf) for STC of 35, 24 kg per square meter (5 psf) for STC of 45.*Provide partitions tested in accordance with ASTM E 90, by a laboratory accredited by the U.S. Bureau of Standards, that have attained a sound transmission class (STC) of not less than 39 40 _ in a fu
34、lly extended position, with a Noise Reduction Coefficient (NRC) of 0.25-0.30 for napped, tufted or looped fabric 0.65-0.75 for perforated steel in accordance with ASTM C423 _. Partition tested shall be of the same construction, materials, and model number as the partition to be provided and be fully
35、 operable. Test specimen shall be not less than 12 square meters in area 4200 by 2700 mm 126 square feet in area 14 by 9 feet, with a panel weight minimum of 26 kg/square meter 5.5 psf for STC up to 40, 36 kg/square meter 7.5 psf for STC up to 45, and 41 kg/square meter 8.5 psf for STC up to 50, 48
36、kg/square meter 10.0 psf for STC up to 53. Panel thickness (100 mm 4 inch nominal) and composition designed to provide the required STC rating in accordance with ASTM E 90 and ASTM E 413.SECTION 10 22 43 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
37、IHS-,-,-1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a su
38、bmittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently
39、important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Managemen
40、t System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA pro
41、jects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information
42、only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-01 Preconstruction SubmittalsManufacturers Qualifications; G; G, _Manufacturers Sampl
43、e WarrantyStatement of Code Compliance; G; G, _Statement of Standards Conformity; G; G, _Verification of Field Measurements; G; G, _ Existing Electrical DataSD-02 Shop DrawingsInstallation; G; G, _Wiring Diagrams; G; G, _Layouts; G; G, _Fabrication Drawings; G; G, _SECTION 10 22 43 Page 8Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-SD-03 Product DataSliding Partitions; G; G, _Installation Instructions; G; G, _CertificationSD-04 SamplesSliding Partitio
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1