1、*USACE / NAVFAC / AFCESA / NASA UFGS-46 73 00.35 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 46 19 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 46 - WATER AND WASTEWATER EQUIPMENTSECTION
2、 46 73 00.35SLUDGE-DIGESTER GAS, HEATING, AND MIXING SYSTEM02/11PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 QUALIFICATIONS1.5 DELIVERY, STORAGE, AND HANDLING1.6 SPARE PARTSPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 Standard Products2.1.2 Nameplates2.1.3 Special Tools2.1.
3、4 Steel Shapes, Plates and Bars2.1.5 Digester Gas Pipe and Fittings2.1.5.1 Digester Gas Pipe Smaller Than 100 mm 4 Inch Diameter2.1.5.2 Digester Gas Pipe 100 mm 4 Inch Diameter and Larger2.1.6 Sludge Piping2.1.7 All Other Piping2.1.8 Valves2.1.8.1 Angle, Check and Globe Valves2.1.8.2 Gate Valves2.1.
4、8.3 Plug Valves2.1.8.4 Gas Valves2.1.9 Expansion Joints2.1.10 Pipe Hangers and Supports2.1.11 Electric Motors2.1.12 Motor Controls and Motor Control Centers2.2 DIGESTER GAS HANDLING SYSTEM2.2.1 Waste Gas Burner2.2.2 Flame Checks2.2.3 Flame Traps2.2.4 Sediment Traps2.2.5 Drip TrapsSECTION 46 73 00.35
5、 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.6 Gas Meters2.2.7 Pressure Indicating Gauges2.2.8 Pressure Relief Valves2.2.9 Pressure Controls2.2.10 Digester Gas Piping2.2.11 Digester Gas Storage2.2.11.1 Storage Tank2.2.11.2 Compressor2.2
6、.11.3 Pressure Relief Valve2.3 DIGESTER HEATING SYSTEM2.3.1 System Performance Requirements2.3.2 Heat Exchanger2.3.2.1 Sludge Tubes2.3.2.2 Pressure Relief Valve2.3.3 Burning Equipment2.3.4 Electric Control Panel2.3.5 Digester Temperature Control2.3.6 Sludge Circulating Pump2.3.7 Sludge Piping2.3.8 W
7、ater Circulation Pumps2.3.8.1 Heat Exchanger Water Circulation Pump2.3.8.2 Building Heat Water Circulation2.4 MECHANICAL SLUDGE MIXING SYSTEM2.4.1 Motor2.4.2 Speed Reducer2.4.2.1 V-Belt Speed Reducer2.4.2.2 Gear Reducer2.4.3 Shaft2.4.4 Bearing and Support Assembly2.4.5 Seals2.4.6 Impeller or Propell
8、er2.4.7 Controls2.5 COMPRESSED GAS SLUDGE MIXING SYSTEM2.5.1 Compressor2.5.2 Diffusers2.5.3 Piping System2.5.3.1 Piping2.5.3.2 Motor Operated Multiport Rotary Valve2.5.4 Supernatant Removal2.5.5 Controls2.5.5.1 Compressor Controls2.5.5.2 Automatic Programming2.5.6 Compressor HousingPART 3 EXECUTION3
9、.1 EXAMINATION3.2 WELDING3.3 PAINTING3.4 EQUIPMENT INSTALLATION3.5 FRAMED INSTRUCTIONS3.6 TESTING3.6.1 Gas Piping Test3.6.2 Piping System and Heat Exchanger Test3.6.3 Operational Test3.6.4 Boiler and Heat Exchanger Test3.7 MANUFACTURERS SERVICES3.8 FIELD TRAININGSECTION 46 73 00.35 Page 2Provided by
10、 IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- End of Section Table of Contents -SECTION 46 73 00.35 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-46 73 00.35 (Febr
11、uary 2011)-Preparing Activity: USACE SupersedingUFGS-44 46 19 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 46 73 00.35SLUDGE-DIGESTER GAS, HEATING, AND MIXING SYSTEM02/11*NOTE: This guide specification covers the requirements for
12、 sludge-digester gas, heating, and mixing system for sewage treatment plants.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific
13、 requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this gu
14、ide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed
15、 in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to upd
16、ate the issue dates.SECTION 46 73 00.35 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the
17、publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)ANSI Z21.15/CSA 9.1 (2009) Manually Operated Gas Valves for Appl
18、iances, Appliance Connector Valves and Hose End ValvesAMERICAN PETROLEUM INSTITUTE (API)API Spec 6D (2008; Errata 2008; Errata 2008; Errata 2009; Addendum 2009; Errata 2010) Specification for Pipeline ValvesAMERICAN WATER WORKS ASSOCIATION (AWWA)AWWA C110/A21.10 (2008) Ductile-Iron and Gray-Iron Fit
19、tings for WaterAWWA C115/A21.15 (2005) Flanged Ductile-Iron Pipe With Ductile-Iron or Gray-Iron Threaded FlangesASME INTERNATIONAL (ASME)ASME B16.1 (2010) Gray Iron Threaded Fittings; Classes 25, 125 and 250ASME B16.3 (2006) Malleable Iron Threaded Fittings, Classes 150 and 300ASME B16.5 (2009) Pipe
20、 Flanges and Flanged Fittings: NPS 1/2 Through NPS 24 Metric/Inch StandardASME B31.1 (2010) Power PipingASME BPVC SEC IV (2010) BPVC Section IV-Rules for Construction of Heating BoilersASME BPVC SEC IX (2010) BPVC Section IX-Welding and Brazing QualificationsASME BPVC SEC VIII D1 (2007; Addenda 2008
21、; Addenda 2009) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1ASTM INTERNATIONAL (ASTM)ASTM A307 (2010) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile StrengthSECTION 46 73 00.35 Page 5Provided by IHSNot for ResaleNo reproduction or networking pe
22、rmitted without license from IHS-,-,-ASTM A36/A36M (2008) Standard Specification for Carbon Structural SteelASTM A53/A53M (2010) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and SeamlessEXPANSION JOINT MANUFACTURERS ASSOCIATION (EJMA)EJMA Stds (2008) EJMA Standar
23、dsMANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS INDUSTRY (MSS)MSS SP-58 (2009) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and InstallationMSS SP-69 (2003) Pipe Hangers and Supports - Selection and Application (ANSI Approved American Natio
24、nal Standard)MSS SP-70 (2006) Gray Iron Gate Valves, Flanged and Threaded EndsMSS SP-78 (2005a) Cast Iron Plug Valves, Flanged and Threaded EndsMSS SP-80 (2008) Bronze Gate, Globe, Angle and Check ValvesNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA 250 (2008) Enclosures for Electrical Equ
25、ipment (1000 Volts Maximum)NEMA ICS 1 (2000; R 2005; R 2008) Standard for Industrial Control and Systems: General RequirementsNEMA ICS 2 (2000; R 2005; Errata 2008) Standard for Controllers, Contactors, and Overload Relays Rated 600 VNEMA ICS 3 (2005; R 2010) Medium-Voltage Controllers Rated 2001 to
26、 7200 V ACNEMA ICS 4 (2010) Terminal BlocksNEMA ICS 6 (1993; R 2006) EnclosuresNEMA MG 1 (2009) Motors and GeneratorsNEMA SG 6 (2000) Standard for Power Switching EquipmentSECTION 46 73 00.35 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NATI
27、ONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 58 (2011; TIA 11-1; Errata 11-1) Liquefied Petroleum Gas CodeNFPA 70 (2011) National Electrical CodeU.S. DEPARTMENT OF DEFENSE (DOD)UFC 3-310-04 (2007; Change 1) Seismic Design for BuildingsUNDERWRITERS LABORATORIES (UL)UL 508 (1999; Reprint Apr 2010) Indu
28、strial Control EquipmentUL 845 (2005; Reprint Aug 2006) Motor Control Centers1.2 SYSTEM DESCRIPTIONProvide a complete gas, heating, and mixing system for sludge digesters shown. The system shall consist of a digester gas handling system, digester heating system, auxiliary fuel system, sludge mixing
29、system and appurtenances as required for a complete and operating system. Coordinate the system with the digester cover specified in Section 46 73 10 FLOATING COVER FOR SLUDGE-DIGESTION TANKS.1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES
30、and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G
31、”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code
32、 of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organizatio
33、n in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.SECTION 46 73 00.35 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license
34、 from IHS-,-,-Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.infor
35、mation only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsEquipment Installation; G; G, _Drawings containing
36、 complete wiring and schematic diagrams and any other details required to demonstrate that the system has been coordinated and will properly function as a unit. Show on the Drawings proposed layout and anchorage of equipment and appurtenances, and equipment relationship to other parts of the work in
37、cluding clearances for maintenance and operation.SD-03 Product DataMaterials and EquipmentA complete list of equipment and material, including manufacturers descriptive data and technical literature, performance charts and curves, catalog cuts, and installation instructions.Spare PartsSpare parts da
38、ta for each different item of material and equipment specified.Framed InstructionsA copy of the instructions proposed to be framed and posted.SD-06 Test ReportsTestingPerformance test reports in booklet form showing all field tests performed to adjust each component and all field tests performed to
39、prove compliance with the specified performance criteria, upon completion and testing of the installed system. Indicate in each test report the final position of controls. Include in the boiler and heat exchanger test reports manometer readings at the main gas regulator, pilot gas regulator, burner
40、inlet, burner and the furnace; amperes drawn by all motors; voltage of main flame and pilot controller signal; and flue gas readings including percent oxygen, percent carbon dioxide, temperature, efficiency, and smoke test results.SD-10 Operation and Maintenance DataSECTION 46 73 00.35 Page 8Provide
41、d by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Operating and Maintenance Manuals; G; G, _Six _ copies of operation and six _ copies of maintenance manuals for the equipment furnished. One complete set, prior to performance testing and the remainder upon ac
42、ceptance. Operation manuals shall detail the step-by-step procedures required for system startup, operation, and shutdown. Operation manuals shall include the manufacturers name, model number, parts list, and brief description of all equipment and their basic operating features. Maintenance manuals
43、shall list routine maintenance procedures, possible breakdowns and repairs, and troubleshooting guides. Maintenance manuals shall include piping and equipment layout and simplified wiring and control diagrams of the system as installed. Manuals shall be approved prior to the field training course.1.
44、4 QUALIFICATIONSQualify procedures and welders in accordance with the code under which the welding is specified to be accomplished.1.5 DELIVERY, STORAGE, AND HANDLINGProtect all equipment, delivered and placed in storage, from the weather, excessive humidity and excessive temperature variation; and
45、dirt, dust, or other contaminants.1.6 SPARE PARTSSubmit spare parts data for each different item of material and equipment specified, after approval of the related submittals and not later than _ months prior to the date of beneficial occupancy. Include with the data a complete list of parts and supplies, with current unit prices and source of supply.PART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENTMaterials and equipment shall conform to the following respective publications and other specified requirements.2.1.1 Standard ProductsProvide materials and equipment which are the standard products of a