1、STD-AECMA PREN 2078-ENGL 2997 m LOL2322 OOL4275 55T AECMA STANDARD NORME AECMA AECMA NORM prEN 2078 Edition 2 November 1997 PUBLISHED BY THE EUROPEAN ASSOCIATION OF AEROSPACE INDUSTRIES (AECMA) Gulledelle 94 - 8-1 200 BRUXELLES - Tel. (32) 2 775 81 10 - Fax. (32) 2 775 81 11 ICs: 49.025.01 Will supe
2、rsede EN 2078 Edition May 1993 Descriptors: ENGLISH VERSION Aerospace series Metallic materials Manufacturing schedule, inspection schedule, inspection and test report Definition, general principles, preparation and approval Srie arospatiale Matriaux mtalliques Fiche de fabrication, fiche dessais, r
3、apport de contrle et dessais Dfinition, principes gnraux, prparation et approbation Luft- und Raumfahrt Metallische Werkstoffe Fertigungsplan, Prfanweisung, Abnahmeprfzeugnis Definition, allgemeine Grundstze, Aufstellung und Genehmigung This “Aerospace series“ Standard has been drawn up under the re
4、sponsibility of AECMA (The European Association of Aerospace Industries). It is published on yellow paper in three equivalent versions (English, French, German). It will be submitted as a draft European Standard to CEN (European Committee for Standardization) for formal vote. Edition approved for pu
5、blication 1997-1 1-28 The equivalent versions in French and German languages can be supplied by B.N.A.E. - Technopolis 54 - 199, rue Jean-Jacques Rousseau 921 38 ICSY - LES - MOULINEAUX CEDEX - FRANCE 6 aecrna 1997 STD*AECMA PREN 2078-ENGL 1997 m LO123LL 00LLi27b 49b m Page 3 prEN 2078: 1997 O Intro
6、duction This standard is part of the series of EN metallic material standards for aerospace applications. The general organization of this series is described in EN 4258. 1 Scope This standard defines the manufacturing schedule, the inspection schedule and the inspection and test report for EN aeros
7、pace metallic semi-finished products. It also specifies the general principles, the preparation and approval of these documents. It shall be used with the relevant semi-finished product definition documents (level 3) defined in EN 4258. 2 Normative references This European Standard incorporates by d
8、ated or undated reference provisions from other publications. These normative references are cited at the appropriate places in the text and the publications are listed hereafter. For dated references, subsequent amendments to or revisions of any of these publications apply to this European Standard
9、 only when incorporated in it by amendment or revision. For undated references, the latest edition of the publication referred to applies. EN 2000 Aerospace series - Quality assurance - EN aerospace products - Approval of the quality system of manufacturers EN 3042 Aerospace series - Quality assuran
10、ce - EN aerospace products - Qualification procedures EN 4258 Aerospace series - Metallic materials - General organization of standardization - Links between types of EN standards and their use 1) EN 4259 Aerospace series - Metallic materials - Definition of general terms 2) EN 10204 Metallic produc
11、ts - Types of inspection documents 3 Definitions For the purposes of this standard, the following definitions apply: 3.1 Design Authority See EN 4259. 1) Published as AECMA Prestandard at the date of publication of this standard 2) In preparation at the date of publication of this standard Previous
12、page is blank STD*AECMA PREN 2078-ENGL 1777 LO12311 0034277 322 D Page 4 prEN 2078: 1997 3.2 Manufacturing schedule Document specifying the actual procedures to be followed in the manufacture of an EN aerospace metallic material semi-finished product. NOTE: The manufacturing schedule is the response
13、 of the manufacturer to orders placed by any purchaser. 3.3 Inspection schedule Document specifying additional inspection and/or testing requirements to those of the applicable EN aerospace standard for that semi-finished product. 3.4 Inspection and test report Document giving the results of all ins
14、pection and testing carried out on the semi-finished product in accordance with the applicable EN aerospace semi-finished product standard and any additional requirements specified on the drawing, order or inspection schedule. 4 Manufacturing schedule 4.1 General principles The preparation of a manu
15、facturing schedule is a mandatory requirement for semi-finished products qualification in accordance with EN 3042. Its preparation is under the responsibility of the manufacturer who has its property. On written request, the purchaser is entitled to collaborate to the drafting. It is used as the ref
16、erence document for semi-finished product qualification, under the conditions of accessibility and commercial secrecy defined in EN 3042. 4.2 Preparation The manufacturing schedule shall describe the manufacturing stages (including inspection and testing procedures) for the semi-finished product to
17、be manufactured, from the acquisition of raw materials through to the storage/delivery of the manufactured semi-finished product. 4.3 Approval 4.3.1 Initiai approval The manufacturing schedule shall be approved by the manufacturer in accordance with the internal procedures defined in his quality ass
18、urance system, as required by EN 2000. Where the manufacturing schedule has been defined in collaboration with the purchaser and/or has been verified by means of pre-production parts, it shall, additionally, be approved by the Design Authority of the purchaser. NOTE: In special cases, the manufactur
19、ing schedule can be frozen on purchasers written instructions. STD-AECMA PREN 2078-ENGL 1777 LOL23Ll 0034278 2b7 Page 5 prEN 2078: 1997 4.3.2 Monitoring of subsequent changes Changes which may significantly affect the quality of the semi-finished product shall be submitted for the written approval o
20、f the purchaser. After this approval, the manufacturer shall inform the Qualification Authority of the agreed changes. The Qualification Authority may record these changes (as an addition to the semi-finished product qualification file) or call for supplementary tests or for a new qualification. Whe
21、re the manufacturing schedule is frozen, any change shall be submitted for the purchasers written approval prior to implementation. 5 Inspection schedule 5.1 General principles The inspection schedule is used in the case of semi-finished products the requirements of which cannot be completely define
22、d by EN aerospace standards, typically forgings and castings. Its preparation is under the responsibility of the purchaser; it is implemented by the manufacturer, but remains the purchasers property. 5.2 Preparation The inspection schedule shall specify additional requirements for inspection and tes
23、ting not defined in the standards appearing on the order. It shall be linked to the drawing references of the semi-finished product. 5.3 Approval The inspection schedule shall be approved in accordance with the internal procedures defined in the purchasers quality assurance system, as required by EN
24、 2000. 6 Inspection and test report 6.1 General principles An inspection and test report shall be provided with each semi-finished product delivery. Its preparation is under the responsibility of the manufacturer, to support the inspection docum nt (see EN 10204) required on the order. 6.2 Preparati
25、on The inspection and test report shall give the results of the release inspection and/or testing in accordance with the relevant standards and, where relevant, purchasers additional instructions as stated in the order, drawing and inspection schedule. 6.3 Approval The inspection and test report shall be approved in accordance with internal procedures defined in the manufacturers quality assurance system as required by EN 2000.