1、Designation: D4071 84 (Reapproved 2011)Standard Practice forUse of Portland Cement Concrete Bridge Deck Water BarrierMembrane Systems1This standard is issued under the fixed designation D4071; the number immediately following the designation indicates the year oforiginal adoption or, in the case of
2、revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers liquid applied, preformed, orbuilt-up water barrier membrane systems and th
3、eir application;overlaid with bituminous concrete wearing courses, for use inthe protection of bridge decks from deleterious effects ofdeicing salts. Material use and specifications should be adaptedto conform to job and user requirements for new constructionor existing structures. This practice is
4、written as a guide for theuse of bridge deck water barrier systems only.1.2 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine t
5、he applica-bility of regulatory limitations prior to use. Specific precau-tionary statements are given in Section 10.2. Referenced Documents2.1 ASTM Standards:23D3743 Terminology Relating to Bridge Deck and Substruc-ture Protection42.2 Other Documents:NCHRP Synthesis Report 57 Durability of Concrete
6、 BridgeDecks53. Terminology3.1 For definitions of terms used in this practice, refer toTerminology D3743.4. Significance and Use4.1 This practice provides a guide for factors to be consid-ered prior to waterproofing bridge decks with water barriermembrane systems. It will provide guidance for specif
7、icationof materials, application of membrane systems, and placementof bituminous wearing courses. It may be used as a guide fornew construction or for rehabilitation of existing structures.5. Bridge Design and Specification Consideration5.1 Proper use of water barrier membranes with bituminousconcre
8、te wearing courses requires consideration of certainelements during the design stage of new or existing bridges tobe treated and covered with a bituminous concrete wearingcourse.5.2 New bridge deck designs must include provision fordead loads including future systems.5.3 The deck surface finish shou
9、ld be specified to allowproper use of the intended membrane system. Manufacturersrecommendations for surface finish should be reviewed forguidance on finishing freshly placed concrete or for repair ofexisting deck surfaces.5.4 Surface drains should be designed to allow positivedrainage to minimize t
10、he penetration of water through thebituminous wearing course.5.5 Joint systems should be designed to provide adequatetermination points for the membrane. Membranes should notbe placed over expansion joints. Dams or expansion assembliesshould be provided to the height of the bituminous wearingcourse.
11、5.6 Curbs or parapets, or both, should be designed forfunctional terminations. Manufacturers of membrane systemsshould be consulted for recommended termination details. Ifrough surfaces (such as granite curbs) are specified, a treatmentshould be specified to provide the surface smoothness requiredfo
12、r the proper use of the membrane. Treatment of rough curbsmay be achieved with a leveling surface treatment with epoxymortar or other suitable materials.5.7 Decks should include weepholes to provide drainage forwater which penetrates through the bituminous wearing courseto the membrane level.1This p
13、ractice is under the jurisdiction of ASTM Committee D04 on Road andPaving Materials and is the direct responsibility of Subcommittee D04.32 onBridges and Structures.Current edition approved Dec. 1, 2011. Published December 2011. DOI:10.1520/D4071-84R11.2For referenced ASTM standards, visit the ASTM
14、website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Withdrawn.4Withdrawn. The last approved version of this historical standard is referencedon www.astm.org.5A
15、vailable from the National Cooperative Highway Reseacrh Program(NCHRP), Keck Center of the National Academies Transportation Research Board,500 Fifth Street, NW Washington, DC 20001.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.5.8
16、 For bridges with significant grades (usually over 4 %) orthose which are subject to traffic acceleration, deceleration, orradial stresses (such as on ramps), the use of membranesystems may cause overlay movement. Membrane manufac-turers should be consulted for limitations on membrane use.5.9 Servic
17、e life and maintenance requirements should beconsidered when designing the water barrier and wearingsurface.5.10 Specified materials should be chemically and physi-cally compatible with specific emphasis on proper adhesion ofthe membrane and the bituminous wearing course.6. Bridge Construction6.1 A
18、preconstruction conference should be held to assurethat the contractor is aware of all construction requirementswhich affect the membrane system.6.2 Inspectors should ensure that surface finish of theconcrete deck is acceptable for the use of the intendedmembrane system, usually an even float finish
19、.6.3 Concrete decks or other components should be curedand dried for the required minimum time before installation ofthe membrane. Limitations on curing methods or curingmaterials should be observed. In most cases, the use ofmembrane curing compounds containing wax or oil should beprohibited.6.4 Car
20、e should be exercised to avoid the use of materialswhich are chemically or physically incompatible with themembrane system to be used.7. Membrane Application7.1 Apreconstruction conference should be held to schedulemembrane application and placement of the bituminous wear-ing course.7.2 Prior to app
21、lication, the bridge deck should be in-spected, deficiencies noted, and repairs made.7.3 Cleaning should be done prior to application of any ofthe membrane system components. Grease and oil should beremoved.7.4 Membranes and bituminous concrete overlays should beapplied only during dry weather and w
22、ithin the acceptabletemperature range.7.5 Manufacturers specifications or technical representa-tives should be consulted to ensure that proper methodsrecommended by the manufacturer are used.7.6 Termination details should be thoroughly inspected toensure that they are watertight.7.7 The membrane sho
23、uld be placed in such a manner thatoverlaps in preformed or built-up systems will not trap water orinterfere with placement of the bituminous wearing course.7.8 Placement and subsequent treatment such as rollingshould be inspected to assure that bubbles or blisters resultingfrom deck moisture outgas
24、sing are minimized. Large bubblesor blisters should be punctured or repaired, or both, asspecified.Abituminous mix with sand or fine aggregate may beused as an underlayment for membranes to minimize bubblingor blistering.7.9 Membrane terminations at drains, joints, and curbsshould be properly sealed
25、 to prevent water entry at thesecritical areas.7.10 The completed membrane system application shouldbe inspected and repairs made in accordance with specifica-tions.7.11 Membrane systems should be protected in accordancewith specifications.7.12 Traffic should not be allowed on the unprotectedmembran
26、e system except as required for placement of thebituminous wearing course.8. Bituminous Wearing Course8.1 The bituminous wearing course should be designed toprovide a completely bonded system and to provide therequired service life. Chemical and physical compatibility ofall components including tack
27、 coats, (if required) should bedetermined.8.2 The bituminous wearing course thickness, aggregatesize and gradation, asphalt type and quantity, should bedetermined by the service life requirements. It should conformto minimum thickness requirements recommended by themembrane manufacturer.8.3 Placemen
28、t of the bituminous wearing course should becompleted within the time period specified. Generally, mem-branes should be exposed for the shortest possible time. Someliquid applied systems may require a minimum time for curingof the membrane.8.4 Weather limitations, dry surfaces, and ambient tempera-t
29、ure requirements should be observed.8.5 The bituminous wearing course should be placed at atemperature range specified for the membrane system beingused.8.6 The type of bituminous placing equipment should bechosen in accordance with specifications or membrane manu-facturers recommendations, or both,
30、 to prevent physical dam-age to the membrane.8.7 The bituminous wearing course should be placed in adirection to avoid damage to the membrane.8.8 Special requirements concerning compaction equipmentor methods should be observed.9. Rehabilitation of Existing Structures9.1 In addition to the considera
31、tions contained in Sections 5through 8, the use of membrane systems and bituminouswearing courses on existing bridge decks require additionalconsiderations.9.1.1 Experience has shown that placement of a membranesystem on an actively corroding, chloride-contaminated bridgedeck will not stop corrosion
32、. Its effect on the rate of corrosionis not yet known. NCHRP Synthesis Report 57 should beconsulted for additional guidance on this matter.9.1.2 The structural capability of the bridge must be deter-mined for the added dead load of the membrane system andbituminous wearing course.9.1.3 Requirements
33、for surface and membrane level drain-age should be considered. Existing drains should be raised andmembrane level weepholes should be provided if drainage willbe impeded at the membrane level.9.1.4 Expansion joints should be replaced or raised to allowfor the elevation change of the bituminous weari
34、ng course.D4071 84 (2011)29.1.5 Curbs or parapets should be examined to assure thatsatisfactory membrane system terminations can be made.9.1.6 Deck and curb surfaces must be repaired to provide asound substrate and a proper surface for the use of membranesystems. Repair materials specified should be
35、 chemicallycompatible with the membrane. Adequate curing time shouldbe allowed for repair materials before application of themembrane system.9.1.7 Cleaning should be clearly specified, particularly withregard to removal of grease or oil from existing deck surfaces.9.1.8 Traffic control methods shoul
36、d be considered. If workis required under traffic conditions, membrane and bituminouswearing course placement must be scheduled to allow foroverlapping membrane when traffic is rerouted from one laneto another.10. Safety10.1 Procedures for safe handling of all components ofmembrane systems should be
37、 determined and observed. Manu-facturers recommendations should be followed.10.2 Questions regarding toxicity should be considered andproper safeguards should be employed.10.3 Traffic control should be sufficient to prevent trafficaccidents or unusual safety hazards to working personnel.11. Keywords
38、11.1 bridge deck; membrane; protective systems; waterbarrier; waterproofingASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentionedin this standard. Users of this standard are expressly advised that determination of the validity
39、 of any such patent rights, and the riskof infringement of such rights, are entirely their own responsibility.This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments
40、 are invited either for revision of this standard or for additional standardsand should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of theresponsible technical committee, which you may attend. If you feel that your comments have not
41、received a fair hearing you shouldmake your views known to the ASTM Committee on Standards, at the address shown below.This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copie
42、s) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(www.astm.org). Permission rights to photocopy the standard may also be secured from the ASTM website (www.astm.org/COPYRIGHT/).D4071 84 (2011)3
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1