1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationBS EN 295-6:2013Vitrified clay pipes systems for drain and sewersPart 6: Requirements for components of manholes and inspection chambersBS EN 295-6:2013 BRITISH STANDARDNational
2、forewordThis British Standard is the UK implementation of EN 295-6:2013. It supersedes BS EN 295-6:1996 and, together with BS EN 295-1:2013, BS EN 295-2:2013, BS EN 295-4:2013, BS EN 295-5:2013, and BS EN 295-7:2013, it supersedes BS EN 295-10:2005, which is withdrawn.The UK participation in its pre
3、paration was entrusted to Technical Committee B/505, Wastewater engineering.A list of organizations represented on this committee can be obtained on request to its secretary.This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct
4、 application. The British Standards Institution 2013. Published by BSI Standards Limited 2013.ISBN 978 0 580 70651 6 ICS 23.040.50; 91.140.80; 93.030Compliance with a British Standard cannot confer immunityfrom legal obligations.This British Standard was published under the authority of the Standard
5、s Policy and Strategy Committee on 28 February 2013.Amendments issued since publicationDate Text affectedBS EN 295-6:2013EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 295-6 February 2013 ICS 93.030 Supersedes EN 295-10:2005, EN 295-6:1995English Version Vitrified clay pipes systems for drain
6、and sewers - Part 6: Requirements for components of manholes and inspection chambers Systmes de tuyaux en grs vitrifi pour les collecteurs dassainissement et les branchements - Partie 6: Exigences applicables aux composants de regards et de botes dinspection ou de branchement Steinzeugrohrsysteme fr
7、 Abwasserleitungen und -kanle -Teil 6: Anforderungen an Bauteile fr Einsteig- und Inspektionsschchte This European Standard was approved by CEN on 1 December 2012. CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standa
8、rd the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CEN member. This European Standard exists in three official versions (English,
9、 French, German). A version in any other language made by translation under the responsibility of a CEN member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CEN members are the national standards bodies of Austria, Belgium, Bulg
10、aria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Tu
11、rkey and United Kingdom. EUROPEAN COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUNG Management Centre: Avenue Marnix 17, B-1000 Brussels 2013 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. EN
12、 295-6:2013: EBS EN 295-6:2013EN 295-6:2013 (E) 2 Contents Page Foreword . 4 1 Scope 52 Normative references . 5 3 Terms and definitions 5 4 Requirements for components for manholes and inspection chambers 6 4.1 Materials, manufacture, water absorption and appearance . 6 4.1.1 Vitrified clay 6 4.1.2
13、 Rubber sealing material . 6 4.1.3 Polyurethane sealing materials . 6 4.1.4 Polypropylene couplings . 6 4.1.5 Materials of other components 6 4.2 Internal diameter 6 4.2.1 Chamber rings and raising pieces 6 4.2.2 Pipeline connections . 6 4.3 Height . 6 4.4 Angle of curvature and radius of channel be
14、nds 7 4.5 Branch angles of channel junctions 7 4.6 Crushing strength (FN) 7 4.7 Bending tensile strength 7 4.8 Bond strength of adhesive used for fixing fired clay parts together . 7 4.9 Fatigue strength under cyclic load 7 4.10 Chemical resistance . 7 4.11 Water tightness of assembled components .
15、7 4.12 Joint systems . 8 5 Common requirements for manholes and inspection chambers . 8 5.1 Reaction to fire . 8 5.2 Durability 8 5.3 Dangerous substances 8 6 Designation 9 7 Marking . 9 7.1 Manhole and inspection chamber components 9 7.2 Joints 10 8 Evaluation of conformity 10 8.1 General . 10 8.2
16、Initial type testing . 10 8.3 Factory production control (FPC) 10 Annex A (informative) Examples of manholes and inspection chambers 11 A.1 Manhole 11 A.2 Inspection chamber . 11 Annex B (informative) Manhole stability 13 Annex ZA (informative) Clauses of this European Standard addressing the provis
17、ions of the EU Construction Products Directive . 14 ZA.1 Scope and relevant characteristics . 14 ZA.2.1 Systems of attestation of conformity 16 ZA.2.2 EC declaration of conformity . 17 ZA.3 CE marking . 17 BS EN 295-6:2013EN 295-6:2013 (E) 3 ZA.3.1 General . 17 ZA.3.2 CE marking on the product 18 ZA
18、.3.3 CE marking in the accompanying documents 18 Bibliography 21 BS EN 295-6:2013EN 295-6:2013 (E) 4 Foreword This document (EN 295-6:2013) has been prepared by Technical Committee CEN/TC 165 “Wastewater engineering”, the secretariat of which is held by DIN. This European Standard shall be given the
19、 status of a national standard, either by publication of an identical text or by endorsement, at the latest by August 2013, and conflicting national standards shall be withdrawn at the latest by August 2013. Attention is drawn to the possibility that some of the elements of this document may be the
20、subject of patent rights. CEN and/or CENELEC shall not be held responsible for identifying any or all such patent rights. This document supersedes EN 295-6:1995 and together with EN 295-1:2013, EN 295-2:2013, EN 295-4:2013, EN 295-5:2013 and EN 295-7:2013 it supersedes EN 295-10:2005. This document
21、has been prepared under a mandate given to CEN by the European Commission and the European Free Trade Association, and supports essential requirements of EU Directive(s). For relationship with EU Directive(s), see informative Annex ZA, which is an integral part of this document. The main changes wit
22、h respect to the previous edition are listed below: reaction to fire added; Annex ZA added; editorially revised. The standard series EN 295 “Vitrified clay pipe systems for drains and sewers“ consists of the following parts: Part 1: Requirements for pipes, fittings and joints Part 2: Evaluation of c
23、onformity and sampling Part 3: Test methods Part 4: Requirements for adaptors, connectors and flexible couplings Part 5: Requirements for perforated pipes and fittings Part 6: Requirements for components of manholes and inspection chambers (the present document) Part 7: Requirements for pipes and jo
24、ints for pipe jacking According to the CEN/CENELEC Internal Regulations, the national standards organisations of the following countries are bound to implement this European Standard: Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of
25、Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. BS EN 295-6:2013EN 295-6:2013 (E) 5 1 Scope This European Standar
26、d applies for components for vitrified clay manholes and inspection chambers for buried drain and sewer systems for the conveyance of wastewater (including domestic wastewater, surface water and rainwater) under gravity and periodic hydraulic surcharge or under continuous low head of pressure. It sp
27、ecifies different strength classes and heights of sections. It also specifies the requirements for components used for joints, systems of joint dimensions and the materials rubber, polyurethane and polypropylene used for joints. NOTE 1 The specifiers/purchasers can select the components for vitrifie
28、d clay manholes and inspection chambers according to their requirements. This standard does not apply to manhole tops and cover slabs. NOTE 2 Corresponding provisions for the evaluation of conformity (ITT and FPC) and sampling and those for the test methods are further specified in EN 295-2 and EN 2
29、95-3, respectively. 2 Normative references The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document
30、(including any amendments) applies. EN 295-1:2013, Vitrified clay pipe systems for drains and sewers Part 1: Requirements for pipes, fittings and joints EN 295-2:2013, Vitrified clay pipes systems for drain and sewers Part 6: Requirements for components of manholes and inspection chambers EN 295-3:2
31、012, Vitrified clay pipe systems for drains and sewers Part 3: Test methods EN 681-1, Elastomeric seals Materials requirements for pipe joint seals used in water and drainage applications Part 1: Vulcanized rubber EN 681-4, Elastomeric seals Materials requirements for pipe joint seals used in water
32、and drainage applications Part 4: Cast polyurethane sealing elements 3 Terms and definitions For the purposes of this document, the terms and definitions given in EN 295-1:2013, and the following apply. 3.1 manhole chamber with a removable cover constructed on a drain or sewer to permit entry by per
33、sonnel SOURCE: EN 752:2008, 3.41 Note 1 to entry: An example of a vitrified clay manhole is given in Figure A.1. BS EN 295-6:2013EN 295-6:2013 (E) 6 3.2 inspection chamber chamber with a removable cover constructed on a drain or sewer that permits the introduction of cleaning and inspection equipmen
34、t from surface level, but does not provide access for personnel SOURCE: EN 752:2008, 3.34 Note 1 to entry: Examples of vitrified clay inspection chambers are given in Figure A.2. 4 Requirements for components for manholes and inspection chambers 4.1 Materials, manufacture, water absorption and appea
35、rance 4.1.1 Vitrified clay For material, manufacture, water absorption and appearance, all vitrified clay elements of manholes and inspection chambers shall be in accordance with EN 295-1:2013, 5.1. 4.1.2 Rubber sealing material Rubber sealing materials shall comply with EN 681-1. 4.1.3 Polyurethane
36、 sealing materials Polyurethane sealing elements shall be in accordance with EN 681-4. 4.1.4 Polypropylene couplings Polypropylene couplings shall be in accordance with EN 295-1:2013, 6.1.3. 4.1.5 Materials of other components Components of other materials which are used with vitrified clay manholes
37、 and inspection chambers shall comply with the relevant European Standard, European Technical Approval or the manufacturers declared specification, as applicable, which shall also include requirements for long term behaviour. 4.2 Internal diameter 4.2.1 Chamber rings and raising pieces The internal
38、diameter of chamber rings and raising pieces shall be in accordance with EN 295-1:2013, 5.2. 4.2.2 Pipeline connections The internal diameter of pipeline connections from or to manholes shall be in accordance with EN 295-1:2013, 5.2. 4.3 Height The nominal height of chamber rings and raising pieces
39、shall be as specified by the manufacturer. The preferred heights are 250, 500, 750, 1 000 and 2 000 mm. The limits of tolerance on this height, measured to the nearest whole mm, shall be from 1 % to +4 %, or 10 mm, whichever is the larger. BS EN 295-6:2013EN 295-6:2013 (E) 7 4.4 Angle of curvature a
40、nd radius of channel bends The tolerance on the angle of curvature and radius of channel bends incorporated into manhole bases shall be in accordance with EN 295-1:2013, 5.7. 4.5 Branch angles of channel junctions The tolerance at the branch angles of channel junctions incorporated into manhole base
41、s shall be in accordance with EN 295-1:2013, 5.8. 4.6 Crushing strength (FN) The crushing strength (FN) of chamber rings and raising pieces shall be in accordance with EN 295-1:2013, 5.9. NOTE 1 Where components have been manufactured according to EN 295-1:2013, they do not need to be retested. NOTE
42、 2 For structural performance see Annex B. 4.7 Bending tensile strength If it is required to determine the crushing strength where whole chamber rings and raising pieces are not available, for example after failure in use, a bending tensile strength test, in accordance with EN 295-3:2012, Clause 8,
43、can be carried out on broken chamber rings and raising pieces. The crushing strength shall be calculated from the mean bending tensile strength of at least ten test pieces. 4.8 Bond strength of adhesive used for fixing fired clay parts together The bond strength of the adhesive used for fixing fired
44、 clay parts together shall be in accordance with EN 295-1:2013, 5.12. 4.9 Fatigue strength under cyclic load Where the resistance to fatigue under cyclic loads is required, it shall be demonstrated by testing in accordance with EN 295-3:2012, Clause 11, when test pieces shall not fail. NOTE For cham
45、ber rings or raising pieces, vitrified clay pipes in accordance with EN 295-1 are typically used. 4.10 Chemical resistance When tested in accordance with EN 295-3:2012, Clause 13, the loss of material from the test piece shall be declared. NOTE 1 Under normal conditions of use, vitrified clay pipes
46、are considered to be resistant to chemical attack and expected to show typical values of loss of material between 0,1 % and 0,25 %. NOTE 2 For chamber rings or raising pieces vitrified clay pipes in accordance with EN 295-1 are typically used. 4.11 Water tightness of assembled components When subjec
47、ted to the test conditions specified in EN 295-3:2012, Clause 26, assembled components manholes and inspection chambers joined by the means specified in 4.12 shall show no visible leakage of water from the body or joints after a time period of 1510+min and the water needed to maintain the level shal
48、l not be greater than 0,04 l/m2of internal surface area. The pressure shall be (50 2) kPa for manholes and BS EN 295-6:2013EN 295-6:2013 (E) 8 inspection chambers up to 5 m in depth. Where required for deeper manholes, the test pressure shall be equivalent to depth and the appropriate sections shall
49、 be marked accordingly. 4.12 Joint systems Chamber rings and raising pieces can be joined by means of dimensional jointing systems in accordance with EN 295-1:2013, 6.4 or by adaptors as specified in EN 295-4:2013. 5 Common requirements for manholes and inspection chambers 5.1 Reaction to fire Where the use of vitrified clay manholes or inspection chambers is subject to national regulatory requirements on reaction to fire, their reaction to fire performance shall be declared. Vitrified clay manholes or inspection chamb
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1