1、BSI Standards PublicationIndustrial communication networks ProfilesPart 5-13: Installation of fieldbuses Installation profiles for CPF 13BS EN 61784-5-13:2013Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking
2、 permitted without license from IHS-,-,-National forewordThis British Standard is the UK implementation of EN 61784-5-13:2013. It isidentical to IEC 61784-5-13:2013.The UK participation in its preparation was entrusted to Technical Com-mittee AMT/7, Industrial communications: process measurement and
3、control, including fieldbus.A list of organizations represented on this committee can be obtained onrequest to its secretary.This publication does not purport to include all the necessary provisions ofa contract. Users are responsible for its correct application. The British Standards Institution 20
4、14.Published by BSI Standards Limited 2014ISBN 978 0 580 84199 6ICS 25.040.40; 35.100.40Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of theStandards Policy and Strategy Committee on 31 January 2014.Amendments/
5、corrigenda issued since publicationDate Text affectedBRITISH STANDARDBS EN 61784-5-13:2013Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-EUROPEAN STANDARD EN 61784-5
6、-13 NORME EUROPENNE EUROPISCHE NORM December 2013 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung CEN-CENELEC Management Centre: Avenue Marnix 17, B - 1000 Brussels 2013 CENELEC - All rig
7、hts of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 61784-5-13:2013 E ICS 25.040.40; 35.100.40 English version Industrial communication networks - Profiles - Part 5-13: Installation of fieldbuses - Installation profiles for CPF 13 (IEC 61784-5-13:2013
8、) Rseaux de communication industriels - Profils - Partie 5-13: Installation des bus de terrain - Profils dinstallation pour CPF 13 (CEI 61784-5-13:2013) Industrielle Kommunikationsnetze - Profile - Teil 5-13: Feldbusinstallation - Installationsprofile fr die Kommunikationsprofilfamilie 13 (IEC 61784
9、-5-13:2013) This European Standard was approved by CENELEC on 2013-10-22. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibl
10、iographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the re
11、sponsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Fi
12、nland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. BS EN 61784-5-13:2013Copyr
13、ight British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-EN 61784-5-13:2013 - 2 - Foreword The text of document 65C/738/FDIS, future edition 1 of IEC 61784-5-13, prepared by SC 65C
14、 “Industrial networks“ of IEC/TC 65 “Industrial-process measurement, control and automation“ was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN 61784-5-13:2013. The following dates are fixed: latest date by which the document has to be implemented at national level by publi
15、cation of an identical national standard or by endorsement (dop) 2014-07-22 latest date by which the national standards conflicting with the document have to be withdrawn (dow) 2016-10-22 This standard is to be used in conjunction with EN 61918:2013. Attention is drawn to the possibility that some o
16、f the elements of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held responsible for identifying any or all such patent rights. Endorsement notice The text of the International Standard IEC 61784-5-13:2013 was approved by CENELEC as a European Standard without an
17、y modification. BS EN 61784-5-13:2013Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,- 3 - EN 61784-5-13:2013 Annex ZA (normative) Normative references to internationa
18、l publications with their corresponding European publications The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the r
19、eferenced document (including any amendments) applies. NOTE When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD applies. Annex ZA of EN 61918:2013 applies, except as follows: Publication Year Title EN/HD Year Addition to Annex ZA of EN
20、61918:2013: IEC 61918 2013 Industrial communication networks - Installation of communication networks in industrial premises EN 61918 2013 BS EN 61784-5-13:2013Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networki
21、ng permitted without license from IHS-,-,- 2 61784-5-13 IEC:2013 CONTENTS INTRODUCTION . 6 1 Scope . 7 2 Normative references . 7 3 Terms, definitions and abbreviated terms . 7 4 CPF 13: Overview of installation profiles 7 5 Installation profile conventions . 7 6 Conformance to installation profiles
22、 8 Annex A (normative) CP 13/1 (Ethernet POWERLINK) specific installation profile 9 A.1 Installation profile scope . 9 A.2 Normative references . 9 A.3 Installation profile terms, definitions, and abbreviated terms . 9 A.3.1 Terms and definitions 9 A.3.2 Abbreviated terms . 9 A.3.3 Conventions for i
23、nstallation profiles . 9 A.4 Installation planning . 9 A.4.1 General . 9 A.4.2 Planning requirements . 9 A.4.2.1 Safety . 9 A.4.2.2 Security 9 A.4.2.3 Environmental considerations and EMC 9 A.4.2.4 Specific requirements for generic cabling in accordance with ISO/IEC 24702 10 A.4.3 Network capabiliti
24、es 10 A.4.3.1 Network topology 10 A.4.3.2 Network characteristics . 10 A.4.4 Selection and use of cabling components 12 A.4.4.1 Cable selection . 12 A.4.4.2 Connecting hardware selection . 14 A.4.4.3 Connections within a channel/permanent link 15 A.4.4.4 Terminators 15 A.4.4.5 Device location and co
25、nnection . 15 A.4.4.6 Coding and labelling . 15 A.4.4.7 Earthing and bonding of equipment and devices and shielded cabling 16 A.4.4.8 Storage and transportation of cables . 16 A.4.4.9 Routing of cables 16 A.4.4.10 Separation of circuit 16 A.4.4.11 Mechanical protection of cabling components . 16 A.4
26、.4.12 Installation in special areas . 16 A.4.5 Cabling planning documentation 16 A.4.6 Verification of cabling planning specification . 16 A.5 Installation implementation . 16 A.5.1 General requirements 16 A.5.2 Cable installation . 16 BS EN 61784-5-13:2013Copyright British Standards Institution Pro
27、vided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-61784-5-13 IEC:2013 3 A.5.3 Connector installation 16 A.5.4 Terminator installation . 16 A.5.5 Device installation . 17 A.5.5.1 Common description . 17 A.5.5.2 S
28、pecific requirements for CPs . 17 A.5.6 Coding and labelling 17 A.5.6.1 Common description . 17 A.5.6.2 Specific requirements for CPs . 17 A.5.7 Earthing and bonding of equipment and devices and shield cabling . 17 A.5.8 As-implemented cabling documentation . 17 A.6 Installation verification and ins
29、tallation acceptance test 17 A.6.1 General . 17 A.6.2 Installation verification . 17 A.6.2.1 General . 17 A.6.2.2 Verification according to cabling planning documentation 17 A.6.2.3 Verification of earthing and bonding 17 A.6.2.4 Verification of shield earthing 17 A.6.2.5 Verification of cabling sys
30、tem 17 A.6.2.6 Cable selection verification . 17 A.6.2.7 Connector verification . 17 A.6.2.8 Connection verification 18 A.6.2.9 Terminators verification . 18 A.6.2.10 Coding and labelling verification . 18 A.6.2.11 Verification report . 18 A.6.3 Installation acceptance test . 18 A.6.3.1 General . 18
31、 A.6.3.2 Acceptance test of Ethernet-based cabling . 18 A.6.3.3 Acceptance test of nonEthernet-based cabling 18 A.6.3.4 Specific requirements for wireless installation . 18 A.6.3.5 Acceptance test report 18 A.7 Installation administration . 19 A.8 Installation maintenance and installation troublesho
32、oting . 19 Figure 1 Standards relationships 6 Table A.1 Network characteristics for balanced cabling based on Ethernet 11 Table A.2 Network characteristics for optical fibre cabling 11 Table A.3 Information relevant to copper cable: fixed cables 12 Table A.4 Information relevant to copper cable: cor
33、ds 13 Table A.5 Information relevant to optical fibre cables . 13 Table A.6 Connectors for balanced cabling CPs based on Ethernet . 14 Table A.7 Optical fibre connecting hardware 14 Table A.8 Relationship between FOC and fibre types (CP 13/1) . 15 BS EN 61784-5-13:2013Copyright British Standards Ins
34、titution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,- 6 61784-5-13 IEC:2013 INTRODUCTION This International Standard is one of a series produced to facilitate the use of communication networks in indust
35、rial control systems. IEC 61918:2013 provides the common requirements for the installation of communication networks in industrial control systems. This installation profile standard provides the installation profiles of the communication profiles (CP) of a specific communication profile family (CPF
36、) by stating which requirements of IEC 61918 fully apply and, where necessary, by supplementing, modifying, or replacing the other requirements (see Figure 1). For general background on fieldbuses, their profiles, and relationship between the installation profiles specified in this standard, see IEC
37、 61158-1. Each CP installation profile is specified in a separate annex of this standard. Each annex is structured exactly as the reference standard IEC 61918 for the benefit of the persons representing the roles in the fieldbus installation process as defined in IEC 61918 (planner, installer, verif
38、ication personnel, validation personnel, maintenance personnel, administration personnel). By reading the installation profile in conjunction with IEC 61918, these persons immediately know which requirements are common for the installation of all CPs and which are modified or replaced. The conventio
39、ns used to draft this standard are defined in Clause 5. The provision of the installation profiles in one standard for each CPF (for example IEC 61784-5-13 for CPF 13), allows readers to work with standards of a convenient size. INDUSTRIAL PREMISESISO/IEC 24702OFFICE PREMISES ISO/IEC 11801ISO/IEC147
40、63-2IEC 61918(Common requirements)IEC 61158 seriesandIEC 61784-1, -2GENERIC CABLINGBETWEENAUTOMATIONISLANDSAPPLICATION-SPECIFICCABLINGWITHINAUTOMATIONISLANDSBETWEENAUTOMATIONISLANDSDESIGNPLANNING AND INSTALLATIONInstallation ProfilesIEC 61784-5 series(Selection +Add/Repl/Mod)Common structureData cen
41、tre AnnexHomeAnnexOfficesAnnexIndustrialAnnexISO/IEC 15018ISO/IEC 24764HOMES DATA CENTRESFigure 1 Standards relationships BS EN 61784-5-13:2013Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted with
42、out license from IHS-,-,-61784-5-13 IEC:2013 7 INDUSTRIAL COMMUNICATION NETWORKS PROFILES Part 5-13: Installation of fieldbuses Installation profiles for CPF 13 1 Scope This part of IEC 61784-5 specifies the installation profiles for CPF 13 (Ethernet POWERLINK1). The installation profiles are specif
43、ied in the annex. This annex is read in conjunction with IEC 61918:2013. 2 Normative references The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated refer
44、ences, the latest edition of the referenced document (including any amendments) applies. IEC 61918:2013, Industrial communication networks Installation of communication networks in industrial premises The normative references of IEC 61918:2013, Clause 2, apply. For profile specific normative referen
45、ces, see Clause A.2. 3 Terms, definitions and abbreviated terms For the purpose of this document, the terms, definitions and abbreviated terms given in IEC 61918:2013, Clause 3, apply. For profile specific terms, definitions and abbreviated terms see Clause A.3. 4 CPF 13: Overview of installation pr
46、ofiles CPF 13 consists of one Communication Profile as specified in IEC 61784-2. The installation requirements for CP 13/1 (Ethernet POWERLINK) are specified in Annex A. 5 Installation profile conventions The numbering of the clauses and subclauses in the annexes of this standard corresponds to the
47、numbering of IEC 61918 main clauses and subclauses. The annex clauses and subclauses of this standard supplement, modify, or replace the respective clauses and subclauses in IEC 61918. _ 1Ethernet POWERLINK is a trade name of Bernecker Type B1 IEC 60793-2-10; Type A1a IEC 60793-2-10; Type A1b IEC 60
48、793-2-40; Type A4a IEC 60793-2-40; Type A3c Attenuation per km (650 nm) 160 dB/km 10 dB/km Attenuation per km (820 nm) Attenuation per km (1 310 nm) 0,5 dB/km 1,5 dB/km 1,5 dB/km Number of optical fibres 2 2 2 2 2 Jacket colour requirements Jacket material Resistance to harsh environment (e.g. UV, oil resist, LS0H) Application dependent BS EN 61784-5-13:2013Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1