1、BSI Standards PublicationIndustrial communication networks ProfilesPart 5-2: Installation of fieldbuses Installation profiles for CPF 2BS EN 61784-5-2:2013Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking pe
2、rmitted without license from IHS-,-,-National forewordThis British Standard is the UK implementation of EN 61784-5-2:2013. It is identical to IEC 61784-5-2:2013. It supersedes BS EN 61784-5-2:2012 which is withdrawn.The UK participation in its preparation was entrusted to TechnicalCommittee AMT/7, I
3、ndustrial communications: process measurement and control, including fieldbus.A list of organizations represented on this committee can be obtained onrequest to its secretary.This publication does not purport to include all the necessary provisions ofa contract. Users are responsible for its correct
4、 application. The British Standards Institution 2014.Published by BSI Standards Limited 2014ISBN 978 0 580 84194 1ICS 25.040.40; 35.100.05Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of theStandards Policy and
5、 Strategy Committee on 31 January 2014.Amendments/corrigenda issued since publicationDate Text affectedBRITISH STANDARDBS EN 61784-5-2:2013Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without
6、license from IHS-,-,-EUROPEAN STANDARD EN 61784-5-2 NORME EUROPENNE EUROPISCHE NORM December 2013 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung CEN-CENELEC Management Centre: Avenue Mar
7、nix 17, B - 1000 Brussels 2013 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 61784-5-2:2013 E ICS 25.040.40; 35.100.40 Supersedes EN 61784-5-2:2012 English version Industrial communication networks - Profiles - Part 5-2: Install
8、ation of fieldbuses - Installation profiles for CPF 2 (IEC 61784-5-2:2013) Rseaux de communication industriels - Profils - Partie 5-2: Installation des bus de terrain - Profils dinstallation pour CPF 2 (CEI 61784-5-2:2013) Industrielle Kommunikationsnetze - Profile - Teil 5-2: Feldbusinstallation -
9、Installationsprofile fr die Kommunikationsprofilfamilie 2 (IEC 61784-5-2:2013) This European Standard was approved by CENELEC on 2013-10-14. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a
10、national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CENELEC member. This European Standard exists in three official versions (English, French, German
11、). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium,
12、Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Swi
13、tzerland, Turkey and the United Kingdom. BS EN 61784-5-2:2013Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-EN 61784-5-2:2013 - 2 - Foreword The text of document 65C
14、/738/FDIS, future edition 3 of IEC 61784-5-2, prepared by SC 65C “Industrial networks“ of IEC/TC 65 “Industrial-process measurement, control and automation“ was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN 61784-5-2:2013. The following dates are fixed: latest date by whic
15、h the document has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2014-07-14 latest date by which the national standards conflicting with the document have to be withdrawn (dow) 2016-10-14 This document supersedes EN 61784-5-2:2012. EN 61
16、784-5-2:2013 includes the following significant technical changes with respect to EN 61784-5-2:2012: updates pertaining to current installation practices; addition of new technology that has become recently available; errors have been corrected; improved alignment with EN 61918. This standard is to
17、be used in conjunction with EN 61918:2013. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held responsible for identifying any or all such patent rights. Endorsement notice The text of the Internat
18、ional Standard IEC 61784-5-2:2013 was approved by CENELEC as a European Standard without any modification. In the official version, for Bibliography, the following notes have to be added for the standards indicated: IEC 61158 Series NOTE Harmonized as EN 61158 Series (not modified). IEC/TR 61158-1 N
19、OTE Harmonized as CLC/TR 61158-1. IEC 62026-3 NOTE Harmonized as EN 62026-3. BS EN 61784-5-2:2013Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,- 3 - EN 61784-5-2:201
20、3 Annex ZA (normative) Normative references to international publications with their corresponding European publications The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited a
21、pplies. For undated references, the latest edition of the referenced document (including any amendments) applies. NOTE When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD applies. Annex ZA of EN 61918:2013 applies, except as follows: Pu
22、blication Year Title EN/HD Year Addition to Annex ZA of EN 61918:2013: IEC 61918 2013 Industrial communication networks - Installation of communication networks in industrial premises EN 61918 2013 BS EN 61784-5-2:2013Copyright British Standards Institution Provided by IHS under license with BSI - U
23、ncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,- 2 61784-5-2 IEC:2013 CONTENTS INTRODUCTION . 11 1 Scope . 12 2 Normative references . 12 3 Terms, definitions and abbreviated terms . 12 4 CPF 2: Overview of installation profiles 12 5 Installation p
24、rofile conventions . 13 6 Conformance to installation profiles 14 Annex A (normative) CP 2/1 (ControlNet) specific installation profile 15 A.1 Installation profile scope . 15 A.2 Normative references . 15 A.3 Installation profile terms, definitions, and abbreviated terms . 15 A.3.1 Terms and definit
25、ions 15 A.3.2 Abbreviated terms . 15 A.3.3 Conventions for installation profiles . 15 A.4 Installation planning . 16 A.4.1 General . 16 A.4.2 Planning requirements . 17 A.4.3 Network capabilities 18 A.4.4 Selection and use of cabling components 24 A.4.5 Cabling planning documentation 41 A.4.6 Verifi
26、cation of planning specification . 41 A.5 Installation implementation . 41 A.5.1 General requirements 41 A.5.2 Cable installation . 41 A.5.3 Connector installation 43 A.5.4 Terminator installation . 53 A.5.5 Device installation . 53 A.5.6 Coding and labelling 55 A.5.7 Earthing and bonding of equipme
27、nt and devices and shield cabling . 56 A.5.8 As-implemented cabling documentation . 57 A.6 Installation verification and installation acceptance test 57 A.6.1 General . 57 A.6.2 Installation verification . 57 A.6.3 Installation acceptance test . 60 A.7 Installation administration . 62 A.8 Installati
28、on maintenance and installation troubleshooting . 62 A.8.1 General . 62 A.8.2 Maintenance 62 A.8.3 Troubleshooting 62 A.8.4 Specific requirements for maintenance and troubleshooting 67 Annex B (normative) CP 2/2 (EtherNet/IP) specific installation profile . 68 B.1 Installation profile scope . 68 B.2
29、 Normative references . 68 BS EN 61784-5-2:2013Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-61784-5-2 IEC:2013 3 B.3 Installation profile terms, definitions, and a
30、bbreviated terms . 68 B.3.1 Terms and definitions 68 B.3.2 Abbreviated terms . 68 B.3.3 Conventions for installation profiles . 68 B.4 Installation planning . 69 B.4.1 General . 69 B.4.2 Planning requirements . 70 B.4.3 Network capabilities 70 B.4.4 Selection and use of cabling components 74 B.4.5 C
31、abling planning documentation 86 B.4.6 Verification of cabling planning specification . 87 B.5 Installation implementation . 87 B.5.1 General requirements 87 B.5.2 Cable installation . 87 B.5.3 Connector installation 88 B.5.4 Terminator installation . 89 B.5.5 Device installation . 89 B.5.6 Coding a
32、nd labelling 89 B.5.7 Earthing and bonding of equipment and devices and shield cabling . 89 B.5.8 As-implemented cabling documentation . 91 B.6 Installation verification and installation acceptance test 91 B.6.1 General . 91 B.6.2 Installation verification . 91 B.6.3 Installation acceptance test . 9
33、3 B.7 Installation administration . 94 B.8 Installation maintenance and installation troubleshooting . 94 Annex C (normative) CP 2/3 (DeviceNet) specific installation profile . 95 C.1 Installation profile scope . 95 C.2 Normative references . 95 C.3 Installation profile terms, definitions, and abbre
34、viated terms . 95 C.3.1 Terms and definitions 95 C.3.2 Abbreviated terms . 95 C.3.3 Conventions for installation profiles . 95 C.4 Installation planning . 96 C.4.1 General . 96 C.4.2 Planning requirements . 97 C.4.3 Network capabilities 98 C.4.4 Selection and use of cabling components 112 C.4.5 Cabl
35、ing planning documentation 121 C.4.6 Verification of cabling planning specification . 121 C.5 Installation implementation . 121 C.5.1 General requirements 121 C.5.2 Cable installation . 121 C.5.3 Connector installation 124 C.5.4 Terminator installation . 136 C.5.5 Device installation . 138 C.5.6 Cod
36、ing and labelling 141 BS EN 61784-5-2:2013Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,- 4 61784-5-2 IEC:2013 C.5.7 Earthing and bonding of equipment and devices an
37、d shield cabling . 141 C.5.8 As-implemented cabling documentation . 142 C.6 Installation verification and installation acceptance test 142 C.6.1 General . 142 C.6.2 Installation verification . 142 C.6.3 Installation acceptance test . 145 C.7 Installation administration . 146 C.8 Installation mainten
38、ance and installation troubleshooting . 146 C.8.1 General . 146 C.8.2 Maintenance 146 C.8.3 Troubleshooting 146 C.8.4 Specific requirements for maintenance and troubleshooting 146 Annex D (informative) Additional information . 150 D.1 Network validation check sheet for CP 2/3 (DeviceNet) 150 Bibliog
39、raphy 154 Figure 1 Standards relationships 11 Figure A.1 Interconnection of CPF 2 networks . 16 Figure A.2 Overview of CPF 2/1 networks 17 Figure A.3 Drop cable requirements . 19 Figure A.4 Placement of BNC/TNC plugs . 19 Figure A.5 Placement of terminators 20 Figure A.6 Extending a network using re
40、peaters 20 Figure A.7 Extending a network using active star topology . 21 Figure A.8 Links . 21 Figure A.9 Extending the network beyond 99 nodes . 22 Figure A.10 Maximum allowable taps per segment . 30 Figure A.11 Example of repeaters in star configuration 31 Figure A.12 Repeaters in parallel . 32 F
41、igure A.13 Repeaters in combination series and parallel 33 Figure A.14 Ring repeater 33 Figure A.15 Installing bulkheads 34 Figure A.16 Coaxial BNC and TNC terminators 35 Figure A.17 Terminator placement in a segment 35 Figure A.18 Redundant network icons 37 Figure A.19 Redundant coax media . 38 Fig
42、ure A.20 Redundant fibre media 38 Figure A.21 Repeaters in series versus length difference for coax media . 39 Figure A.22 Repeaters in series versus length difference for fibre media . 39 Figure A.23 Example of redundant coax network with repeaters . 40 Figure A.24 Example of improper redundant nod
43、e connection 40 Figure A.25 Example tool kit for installing BNC connectors 44 Figure A.26 Calibration of coaxial stripper 45 Figure A.27 Coax PVC strip length detail (informative) . 45 BS EN 61784-5-2:2013Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled C
44、opy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-61784-5-2 IEC:2013 5 Figure A.28 Memory cartridge and blade 46 Figure A.29 Cable position . 47 Figure A.30 Locking the cable 47 Figure A.31 Stripping the cable 47 Figure A.32 Install the crimp ferrule . 48 Figure
45、A.33 Cable preparation for PVC type cables (informative) . 48 Figure A.34 Cable preparation for FEP type cables (informative) . 49 Figure A.35 Strip guides 49 Figure A.36 Using the flare tool 50 Figure A.37 Expanding the shields . 50 Figure A.38 Install the centre pin . 50 Figure A.39 Crimping the c
46、entre pin . 51 Figure A.40 Installing the connector body 51 Figure A.41 Installing the ferrule 51 Figure A.42 Crimp tool . 52 Figure A.43 Sealed IP65/67 cable 53 Figure A.44 Terminator placement . 53 Figure A.45 Mounting the taps . 54 Figure A.46 Mounting the tap assembly using the universal mountin
47、g bracket . 55 Figure A.47 Mounting the tap using tie wraps or screws . 55 Figure A.48 Redundant network icons 56 Figure A.49 Network test tool . 58 Figure A.50 Shorting the cable to test for continuity . 59 Figure A.51 Testing fibre segments 61 Figure A.52 Multi-fibre backbone cable housing . 63 Fi
48、gure A.53 Repeater adapter module 63 Figure A.54 Short and medium distance fibre module LEDs . 65 Figure A.55 Long and extra long repeater module LEDs 66 Figure B.1 Interconnection of CPF 2 networks . 69 Figure B.2 Redundant linear bus 71 Figure B.3 Peer to peer connections 71 Figure B.4 Mated connections 74 Figure B.5 The 8-way modular sealed jack passive taps (non-sealed and sealed) with fixed 1 m drop cable BNC/TNC connector on the end of the drop cable, which shall not