1、BSI Standards PublicationDocument kinds for Electrical and Instrumentation Projects in the Process IndustryBS EN 62708:2015National forewordThis British Standard is the UK implementation of EN 62708:2015. It is identical to IEC 62708:2015.The UK participation in its preparation was entrusted to Tech
2、nicalCommittee GEL/65, Measurement and control.A list of organizations represented on this committee can be obtained onrequest to its secretary.This publication does not purport to include all the necessary provisions ofa contract. Users are responsible for its correct application. The British Stand
3、ards Institution 2015.Published by BSI Standards Limited 2015ISBN 978 0 580 79789 7ICS 01.110; 25.040.40 Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of theStandards Policy and Strategy Committee on 31 May 201
4、5.Amendments/corrigenda issued since publicationDate Text affectedBRITISH STANDARDBS EN 62708:2015EUROPEAN STANDARDNORME EUROPENNEEUROPISCHE NORMEN 62708 April 2015 ICS 01.110; 25.040.40 English Version Document kinds for Electrical and Instrumentation Projects in the Process Industry (IEC 62708:201
5、5) Types de documents pour les projets relatifs aux systmes lectriques et aux instruments de fonctionnement danslindustrie de transformation (IEC 62708:2015) Dokumente fr die Elektro- und Leittechnik-Planung inProjekten der verfahrenstechnischen Industrie(IEC 62708:2015) This European Standard was a
6、pproved by CENELEC on 2015-04-01. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such n
7、ational standards may be obtained on application to the CEN-CENELEC Management Centre or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into it
8、s own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions.CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedo
9、nia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland,Turkey and the United Kingdom. European Committee for Electrotechnical Standardization Comit Europe
10、n de Normalisation ElectrotechniqueEuropisches Komitee fr Elektrotechnische Normung CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels 2015 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members. Ref. No. EN 62708:2015 E EN 62708:2015 - 2
11、 - Foreword The text of document 65/580/FDIS, future edition 1 of IEC 62708, prepared by IEC TC 65 “Industrial-process measurement, control and automation“ was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN 62708:2015. The following dates are fixed: latest date by which the
12、 document has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2016-01-01 latest date by which the national standards conflicting with the document have to be withdrawn (dow) 2018-04-01 Attention is drawn to the possibility that some of the
13、 elements of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held responsible for identifying any or all such patent rights. Endorsement notice The text of the International Standard IEC 62708:2015 was approved by CENELEC as a European Standard without any modifica
14、tion. In the official version, for Bibliography, the following notes have to be added for the standards indicated: ISO 7200 NOTE Harmonized as EN ISO 7200. IEC 81346-1 NOTE Harmonized as EN 81346-1. BS EN 62708:2015- 3 - EN 62708:2015 Annex ZA (normative) Normative references to international public
15、ations with their corresponding European publications The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the reference
16、d document (including any amendments) applies. NOTE 1 When an International Publication has been modified by common modifications, indicated by (mod), the relevant EN/HD applies. NOTE 2 Up-to-date information on the latest versions of the European Standards listed in this annex is available here: ww
17、w.cenelec.eu. Publication Year Title EN/HD Year IEC 60079-10-1 - Explosive atmospheres - Part 10-1: Classification of areas - Explosive gas atmospheres EN 60079-10-1 - IEC 60079-11 - Electrical apparatus for explosive gas atmospheres - Part 11: Intrinsic safety “i“ - - IEC 60617 - Standard data elem
18、ent types with associated classification scheme for electric components - Part 4: IEC reference collection fo standard data element types and component classes - - IEC 61082-1 - Preparation of documents used in electrotechnology - Part 1: Rules EN 61082-1 - IEC 61131-3 - Programmable controllers - P
19、art 3: Programming languages EN 61131-3 - IEC 61355 series Classification and designation of documents for plants, systems and equipment EN 61355 series IEC 61355-1 2008 Classification and designation of documents for plants, systems and equipment - Part 1: Rules and classification tables EN 61355-1
20、 2008 IEC 61511 series Functional safety - Safety instrumented systems for the process industry sector - Part 2: Guidelines for the application of IEC 61511-1 EN 61511 series IEC 61987-10 - Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Pa
21、rt 10: Lists of properties (LOPs) for industrial-process measurement and control for electronic data exchange - Fundamentals EN 61987-10 - - - +AC - IEC 62337 - Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones EN 62337 - IEC 62
22、381 - Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT) EN 62381 - BS EN 62708:2015EN 62708:2015 - 4 - IEC 62424 - Representation of process control engineering - Requests in P any IEC National Committee interested
23、in the subject dealt with may participate in this preparatory work. International, governmental and non-governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely with the International Organization for Standardization (ISO) in accordance with con
24、ditions determined by agreement between the two organizations. 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international consensus of opinion on the relevant subjects since each technical committee has representation from all interested IEC Na
25、tional Committees. 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC Publications is accurate, IEC cannot be held responsible for the
26、way in which they are used or for any misinterpretation by any end user. 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications transparently to the maximum extent possible in their national and regional publications. Any divergence between any I
27、EC Publication and the corresponding national or regional publication shall be clearly indicated in the latter. 5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity assessment services and, in some areas, access to IEC marks of conformity.
28、 IEC is not responsible for any services carried out by independent certification bodies. 6) All users should ensure that they have the latest edition of this publication. 7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and members of
29、its technical committees and IEC National Committees for any personal injury, property damage or other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any o
30、ther IEC Publications. 8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is indispensable for the correct application of this publication. 9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be t
31、he subject of patent rights. IEC shall not be held responsible for identifying any or all such patent rights. International Standard IEC 62708 has been prepared by IEC technical committee 65: Industrial-process measurement, control and automation. The text of this standard is based on the following
32、documents: FDIS Report on voting 65/580/FDIS 65/583/RVD Full information on the voting for the approval of this standard can be found in the report on voting indicated in the above table. This publication has been drafted in accordance with the ISO/IEC Directives, Part 2. BS EN 62708:2015IEC 62708:2
33、015 IEC 2015 5 The committee has decided that the contents of this publication will remain unchanged until the stability date indicated on the IEC web site under “http:/webstore.iec.ch“ in the data related to the specific publication. At this date, the publication will be reconfirmed, withdrawn, rep
34、laced by a revised edition, or amended. IMPORTANT The colour inside logo on the cover page of this publication indicates that it contains colours which are considered to be useful for the correct understanding of its contents. Users should therefore print this document using a colour printer. BS EN
35、62708:2015 6 IEC 62708:2015 IEC 2015 INTRODUCTION The engineering in the process industry is driven by international cooperation. Due to economic reasons, special know-how, special licence, authorization or simply capacity utilisation the work is split between partners. They will arrange their coope
36、ration for each individual project differently. This requires well defined split of work and responsibilities. Documents are the basis for these definitions since they are the result of any engineering work. If there is only the name of a document without further description of form and content, it
37、will be likely that each partner develops their own view of the result of their efforts. Therefore, for each project the definition of deliverable documents is a major issue. The name of a document is often used for similar but in detail different documents. This standard will take the most commonly
38、 used name from synonymous names as the document kind name, intending to make other alternatives obsolete. The first aim of this standard is to avoid misunderstandings and erroneous elaboration of documents in order to reduce additional corrective works and expenses for clarification between partner
39、s. The second aim is to provide the convenience of document handling by using the IEC 61355 database. This standard will provide document kind names, document kind classification codes specified by IEC 61355, and some templates. To cover these aims, we specify individual document kind names, but do
40、not specify which documents are mandatory or optional. BS EN 62708:2015IEC 62708:2015 IEC 2015 7 DOCUMENT KINDS FOR ELECTRICAL AND INSTRUMENTATION PROJECTS IN THE PROCESS INDUSTRY 1 Scope This International Standard defines specific documents and their basic content required for electrical and instr
41、umentation projects in the process industry. This standard specifies the document kind name and the mandatory content of the document kind. Documents used in the phases of a project from the concept phase to the mechanical completion are covered (see IEC 62337). Documents for project management and
42、quality assurance are included. Documents for commercial project administration are excluded. Examples of documents are provided for easy reference, understanding and usage. 2 Normative references The following documents, in whole or in part, are normatively referenced in this document and are indis
43、pensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. IEC 60617, Graphical symbols for diagrams IEC 60079-10-1, Explosive atmospheres Part 10-1: Classification of a
44、reas Explosive gas atmospheres IEC 60079-11, Explosive atmospheres Part 11: Equipment protection by intrinsic safety “i“ IEC 61082-1, Preparation of documents used in electrotechnology Part 1: Rules IEC 61131-3, Programmable controllers Part 3: Programming languages IEC 61355 (all parts), Classifica
45、tion and designation of documents for plants, systems and equipment IEC 61355-1:2008, Classification and designation of documents for plants, systems and equipment Part 1: Rules and classification tables IEC 61511 (all parts), Functional safety Safety instrumented systems for the process industry se
46、ctor IEC 61987-10, Industrial-process measurement and control Data structures and elements in process equipment catalogues Part 10: Lists of properties (LOPs) for industrial-process measurement and control for electronic data exchange Fundamentals BS EN 62708:2015 8 IEC 62708:2015 IEC 2015 IEC 62337
47、, Commissioning of electrical, instrumentation and control systems in the process industry Specific phases and milestones IEC 62381, Automation systems in the process industry Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) IEC 62424, Representation of proc
48、ess control engineering Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools IEC 82079-1, Preparation of instructions for use Structuring, content and presentation Part 1: General principles and detailed requirements ISO 10006, Quality management systems Guidelines for qua
49、lity management in projects ISO 10628, Flow diagrams for process plants General rules 3 Terms, definitions, abbreviated terms and acronyms 3.1 Terms and definitions For the purposes of this document, the following terms and definitions apply. 3.1.1 activity smallest identified item of work in a project SOURCE: ISO 10006: 2003, 3.1 3.1.2 document fixed and structured amount of information intended for human perception that can be managed and interchanged as a unit betwe
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1