1、 S e p t e m b e r 2 0 1 6 E n g l i s h p r i c e g r o u p 6 N o p a r t o f t h i s t r a n s l a t i o n m a y b e r e p r o d u c e d w i t h o u t p r i o r p e r m i s s i o n o f D I N D e u t s c h e s I n s t i t u t f r N o r m u n g e . V . , B e r l i n . B e u t h V e r l a g G m b H ,
2、 1 0 7 7 2 B e r l i n , G e r m a n y ,h a s t h e e x c l u s i v e r i g h t o f s a l e f o r G e r m a n S t a n d a r d s ( D I N - N o r m e n ) .I C S 9 1 . 0 1 0 . 2 0 ; 9 1 . 2 0 0!%tD“2568133www.din.deD I N 1 8 4 5 9G e r m a n c o n s t r u c t i o n c o n t r a c t p r o c e d u r e s (
3、 V O B ) P a r t C : G e n e r a l t e c h n i c a l s p e c i f i c a t i o n s i n c o n s t r u c t i o n c o n t r a c t s ( A T V ) D e m o l i t i o n a n d d i s m a n t l i n g w o r k s ,E n g l i s h t r a n s l a t i o n o f D I N 1 8 4 5 9 : 2 0 1 6 - 0 9V O B V e r g a b e - u n d V e r
4、 t r a g s o r d n u n g f r B a u l e i s t u n g e n T e i l C : A l l g e m e i n e T e c h n i s c h e V e r t r a g s b e d i n g u n g e n f r B a u l e i s t u n g e n ( A T V ) A b b r u c h - u n d R c k b a u a r b e i t e n ,E n g l i s c h e b e r s e t z u n g v o n D I N 1 8 4 5 9 : 2
5、0 1 6 - 0 9C a h i e r d e s c h a r g e s a l l e m a n d p o u r d e s t r a v a u x d e b t i m e n t ( V O B ) P a r t i e C : C l a u s e s t e c h n i q u e s g n r a l e s p o u r l e x c u t i o n d e s t r a v a u x d e b t i m e n t ( A T V ) T r a v a u x d e d m o l i t i o n e t d c o n
6、 s t r u c t i o n ,T r a d u c t i o n a n g l a i s e d e D I N 1 8 4 5 9 : 2 0 1 6 - 0 9SupersedesD I N 1 8 4 5 9 : 2 0 1 5 - 0 8www.beuth.deD o c u m e n t c o m p r i s e s 1 4 p a g e sDT r a n s l a t i o n b y D I N - S p r a c h e n d i e n s t .I n c a s e o f d o u b t , t h e G e r m a n
7、 - l a n g u a g e o r i g i n a l s h a l l b e c o n s i d e r e d a u t h o r i t a t i v e .10.16 DIN 18459:2016-09 2 A comma is used as the decimal marker. Foreword This document has been prepared by the Deutscher Vergabe- und Vertragsausschuss fr Bauleistungen (DVA) (German Committee for Const
8、ruction Contract Procedures). Amendments This document differs from DIN 18459:2015-08 as follows: a) the document has been editorially revised; b) the references to VOB/A have been updated; c) the normative references have been updated as of 2016-04. Previous editions DIN 18459: 2006-10, 2010-04, 20
9、12-09, 2015-08 Normative references The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (includ
10、ing any amendments) applies. DIN 1054, Subsoil Verification of the safety of earthworks and foundations Supplementary rules to DIN EN 1997-1 DIN 4123, Excavations, foundations and underpinnings in the area of existing buildings DIN 4150 (all parts), Vibrations in buildings DIN 18007, Demolition work
11、s Concepts, procedures, fields of application DIN 18202:2013-04, Tolerances in building construction Buildings DIN 18299, German construction contract procedures (VOB) Part C: General technical specifications in construction contracts (ATV) General rules applying to all types of construction work DI
12、N 18300, German construction contract procedures (VOB) Part C: General technical specifications in construction contracts (ATV) Earthworks DIN 18320, German construction contract procedures (VOB) Part C: General technical specifications in construction contracts (ATV) Landscape work DIN 18920, Veget
13、ation technology in landscaping Protection of trees, plantations and vegetation areas during construction work DIN EN 1991-1-1, Eurocode 1: Actions on structures Part 1-1: General actions Densities, self-weight, imposed loads for buildings DIN 18459:2016-09 3 DIN EN 1991-1-1/NA, National Annex Natio
14、nally determined parameters Eurocode 1: Actions on structures Part 1-1: General actions Densities, self-weight, imposed loads for buildings DIN EN 1997-1, Eurocode 7: Geotechnical design Part 1: General rules DIN EN 1997-1/NA, National Annex Nationally determined parameters Eurocode 7: Geotechnical
15、design Part 1: General rules AVV Verordnung ber das Europisches Abfallverzeichnis (Ordinance pertaining to the European Waste Catalogue), implementing the Gesetz zur Frderung der Kreislaufwirtschaft und Sicherung der umweltvertrglichen Beseitigung von Abfllen (KrW-/AbfG) (German Closed Waste Recycli
16、ng and Management Act)*)*)Author: German Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB), Stresemannstr. 128-130, 10117 Berlin, www.bmub.de. Obtainable from: Beuth Verlag GmbH, 10772 Berlin, www.beuth.de. DIN 18459:2016-09 4 Contents Page 0 Details requi
17、red for drafting the specification of works . 4 1 Scope 7 2 Materials and components . 7 3 Execution of work 8 4 Associated tasks and special tasks 11 5 Settlement of accounts 13 0 Details required for drafting the specification of works The following information supplements the general information
18、specified in DIN 18299, clause 0. Without this information, a specification of works as required in 7 ff., 7 EU ff. or 7 VS ff.of VOB/A (DIN 1960) cannot be properly drawn up. This information does not form part of the contract. The specification of works shall, in particular, include the following
19、information as and when applicable. 0.1 Site information 0.1.1 Type, year of construction, past uses of all structures and technical installations to be demolished or dismantled and their type(s) of contamination. 0.1.2 Structural systems and types of construction of all structures and technical ins
20、tallations to be demolished or dismantled. 0.1.3 Depths and types of foundation of, and loads from, neighbouring structures. DIN 18459:2016-09 5 0.1.4 Stability of remaining and neighbouring structures, components and sites, and their use. 0.1.5 Type, constructional details, dimensions and location
21、of any scaffolding installed by other contractors, and schedule for the installation or removal of such scaffolding. 0.1.6 Ongoing operations that need to be maintained while the work is being executed. 0.2 Details of execution of work 0.2.1 Limits of demolition or dismantling zone. 0.2.2 Permissibl
22、e deviations on size and form of edges left following demolition/dismantling work. 0.2.3 Type, design, location, number, materials and dimensions of all structures and technical installations to be demolished or dismantled. 0.2.4 Form of excavations needed for demolishing structures and technical in
23、stallations underground. 0.2.5 Measures to be taken to preserve evidence, scope of such measures and time when they are to be taken. 0.2.6 Any experts opinion available and extent to which they are to be observed in the execution of the work (e.g. pollutant register, noise and vibration findings). 0
24、.2.7 Type, design, number, location and dimensions of edgings and connections to/junctions with other building elements. 0.2.8 Type, location, number, dimensions and masses of components and materials to be salvaged or set aside. 0.2.9 Type, location, number and dimensions of any recesses (e.g. open
25、ings) to be made. 0.2.10 Type, design, number, location and dimensions of installations and fitments. 0.2.11 Nature and extent of any fire protection and anti-pollution measures (e.g. noise and dust control). Any restriction on the use of water. 0.2.12 Protection of building and system components, f
26、urniture, and the like, and protection of neighbouring ground and structures. 0.2.13 Type and extent of work to maintain ongoing operations. 0.2.14 Any demolition or dismantling of structures and technical installations carried out prior to or subsequent to the main work. 0.2.15 Any restrictions on
27、cutting beyond the permitted limits in sawing work at corners. 0.2.16 Any restrictions on the demolition or dismantling techniques used. DIN 18459:2016-09 6 0.3 Details not included in the specifications of this standard 0.3.1 If specifications are to be made that are not included in the specificati
28、ons of this standard, they shall be described separately and clearly in the specification of works. 0.3.2 Such specifications may be of particular relevance in: subclause 3.1.3, if the client is to specify the demolition or dismantling technique, the work schedule and the type and deployment of equi
29、pment, subclause 3.4.1, if the haulage and loading of demolition materials is not to be one of the tasks specified, subclause 3.4.2, if the choice of hauling routes is not to be left to the contractor, subclause 3.5, if deviations other than those specified are permitted, subclause 3.5.3, if sawing
30、is not permitted beyond the exact length specified. 0.4 Details of associated tasks and special tasks No details are required supplementary to those given in DIN 18299, subclause 0.4. 0.5 Accounting of works In the specification of works, accounting of works shall be based on the following: 0.5.2 Vo
31、lume (m3), accounted for separately according to type of construction and dimensions: foundations, slabs, floors, walls, supports, columns, beams, joists, trusses, rafters and the like, abutments, ramps, stairs, fluids. 0.5.2 Area (m2), accounted for separately according to type of construction and
32、dimensions: building components walls, floors, slabs, foundations, floor, wall and ceiling coverings, plaster, tiles, screed, insulating materials, linings, facings, roofing materials, partitions, cut surfaces cut surfaces produced by sawing, thermal cutting, according to cut surface, high pressure
33、cutting, water jetting, according to cut surface, milling and grinding. 0.5.3 Area (cm2), accounted for separately according to type of construction and dimensions, for individual cut surfaces and cross sections of steel cuttings. DIN 18459:2016-09 7 0.5.4 Length (m), accounted for separately accord
34、ing to type of construction and dimensions: railings, balustrades, parapets, pipes, surrounds, bores, recesses, chases, full cuts. 0.5.5 Number of items, accounted for separately according to type of construction and dimensions: windows, doors, penetrations in walls and floors, vessels, tanks, radia
35、tors, heating installations and the like, luminaires, fluorescent tubes, condensers. 0.5.6 Mass (kg, t), accounted for separately according to material. 1 Scope 1.1 This standard deals with the partial or complete demolition or dismantling of structures and technical installations. It also applies t
36、o the handling (hauling, storage and loading) of demolished or dismantled building components and equipment and to all demolition materials and components recovered. 1.2 This standard does not cover: earthwork (see DIN 18300), clearing of vegetation (see DIN 18320). 1.3 DIN 18299, clauses 1 to 5 sha
37、ll also apply. In cases where the specifications of DIN 18299 contradict the present standard, DIN 18459 shall take precedence. 2 Materials and components The specifications of DIN 18299, clause 2 shall be supplemented as follows: 2.1 Demolition debris, salvaged materials and components obtained fro
38、m demolition or dismantling work do not pass into the ownership of the contractor. 2.2 All demolition materials are to be designated and classified according to the Abfallverzeichnis-Verordnung (AVV)1)zum Kreislaufwirtschaftsgesetz (KrWG). 1) Author: German Federal Ministry for the Environment, Natu
39、re Conservation, Building and Nuclear Safety (BMUB), Stresemannstr. 128-130, 10117 Berlin, www.bmub.de. Obtainable from: Beuth Verlag GmbH, 10772 Berlin, www.beuth.de. DIN 18459:2016-09 8 3 Execution of work The specifications of DIN 18299, clause 3 shall be supplemented as follows: 3.1 General 3.1.
40、1 For the execution of work in particular the following specifications apply: DIN 1054 DIN 4123 DIN 4150 (all parts) DIN 18007 DIN 18920 DIN EN 1997-1 DIN EN 1997-1/NA 3.1.2 Reservations according to VOB/B (DIN 1961), 4, clause 3 could involve in particular the following: any discrepancies between t
41、he conditions on site and the specifications, the condition of the ground if this is of inadequate strength. 3.1.3 The choice of technique used and scheduling of the work, and the type and deployment of the equipment shall be left to the contractor. Prior to commencing work, the contractor shall inf
42、orm the client in writing of the technique to be used and the planned procedures. 3.1.4 Endangered structures shall be made safe in accordance with DIN 4123. The instructions of the owners or other authorized persons shall be followed when taking measures for the protection of structures, pipes, cab
43、les, ducts, drains and sewers in the site area. The necessary work counts as special tasks (see subclause 4.2.1). 3.1.5 Where the location of pipes, cables, drains and sewers, ducts, bench marks, obstacles and other structures is unknown before work starts, this shall be established. The work involv
44、ed in locating such shall count as a special task (see subclause 4.2.1). 3.1.6 Should unexpected obstacles be encountered, such as undeclared pipes, ducts, cables, drains and sewers, survey marks and other installations, the client shall be notified immediately. Special measures shall be taken in ag
45、reement with the client. If work is necessary as a result, this shall count as a special task (see subclause 4.2.1). 3.1.7 Endangered trees or other vegetation shall be made safe in accordance with DIN 18920. The work involved counts as a special task (see subclause 4.2.1). DIN 18459:2016-09 9 3.2 P
46、reparation of construction site 3.2.1 Boundary stones and survey marks may be removed only with the clients consent. The clients datums established for the site shall be guaranteed by other points before they are removed. 3.2.2 No more growth than agreed shall be removed without the clients consent.
47、 3.3 Procedure 3.3.1 The work shall be executed using the technique selected as in subclause 3.1.3. Precautionary measures shall be taken to prevent unplanned collapse. Stability shall be ensured at all work stages up to the time at which controlled demolition or dismantling takes place. 3.3.2 Shoul
48、d hazards occur during the course of work (e.g. incursion of water, ground heave, uplift or damage to structures), the contractor shall notify the client without delay. If there is imminent danger, the contractor shall immediately take the measures necessary to prevent damage. Further action shall be agreed between client and contractor. Unless the contractor is at fault, the necessary work counts as a special task (see subclause 4.2.1). 3.3.3 If during the execution of work the contractor encounters conditions other than those declared in