1、AMSC N/A FSC 6135 INCH-POUND MIL-B-18/15D 22 November 2010 SUPERSEDING MIL-B-18/15C 21 Aug 1976 MILITARY SPECIFICATION SHEET BATTERY, DRY, BA-37 This specification is approved for use by all Departments and Agencies of the Department of Defense. The requirements for acquiring the product described h
2、erein shall consist of this specification sheet and MIL-B-18. FIGURE 1. Battery dimensions. INACTIVE FOR NEW DESIGN AFTER 7 MAY 1998 AND IS NO LONGER USED, EXCEPT FOR REPLACEMENT PURPOSES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-18/15D
3、2 Ltr Inches mm Min Max Min Max A .636 .676 16.15 17.17 B .283 .343 7.188 8.71 C 1.283 1.343 32.588 34.11 D .065 .185 1.651 4.70 E 5.185 7.065 131.699 179.45 F .901 .911 22.885 23.14 NOTES: 1. Dimensions are in inches. 2. Metric equivalents are given for general information only. 3. Unless otherwise
4、 specified, tolerances are .005 (0.13 mm) for three place decimals and .02 (0.5 mm) for two place decimals. 4. Marking to be in accordance with MIL-B-18. FIGURE 1. Battery dimensions - Continued. REQUIREMENTS: Dimensions, marking, and configuration: See figure 1. Nominal voltage: 1.5 volts. Number a
5、nd type of cells: 1 “J” cells. Terminals: Flat surface. Weight (maximum): 11 ounces. Capacity tests: When the battery is tested in accordance with the methods of examination and test of this specification, the minimum capacity-test requirements shall be as specified in Supplement 1. First article in
6、spection in accordance with MIL-B-18: Visual and mechanical (external and internal). Battery voltage. Waterproof-of-jacket test (when applicable). Electrolyte leakage. Vibration test. Capacity, D (without storage). Conformance inspection in accordance with MIL-B-18: Visual and mechanical (external).
7、 Battery voltage. Waterproof-of-jacket test (when applicable). Electrolyte leakage. Capacity, D and T. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-18/15D 3 Method of examination and test: Capacity tests: See requirements for capacity specif
8、ied herein. Storage: Test Period D 12 months T 90 days Discharge: The battery shall be discharged through 5 ohms continuously to a test-end voltage of 1.0 volt. Electrolyte leakage: The battery shall be discharged through 3 ohms for 24 hours. Closed circuit voltage: Use TS-183 ( )/U test per special
9、 marking or, with minimum permissible voltage as specified for TS-183 ( )/U, use a load resistance value of 5,983 ohms. Special marking on each unit package: TO TEST THIS BATTERY WITH TS-183 ( )/U: USE JACK NO. MINIMUM PERMISSIBLE VOLTAGE 3 1.4 Unless expressly authorized, this test information shal
10、l apply to Army and Air Force applications only. Part or Identifying Number (PIN): BA-37, see 1.2 of MIL-B-18. The margins of this specification are marked with vertical lines to indicate where changes from the previous issue were made. This was done as a convenience only and th Government assumes n
11、o liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous issue. Provided by IHSNot for ResaleNo reproduc
12、tion or networking permitted without license from IHS-,-,-MIL-B-18/15D 4 Custodians: Preparing activity: Army - CR DLA - CC Navy - SH Air Force - 99 (Project 6135-2010-049) DLA - CC Review activities: Navy - MC, YD NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at https:/assist.daps.dla.mil. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1