1、BRITISH STANDARD BS EN 45510-2-7:2002 Guide for procurement of power station equipment Part 2-7: Electrical equipment Switchgear and controlgear The European Standard EN 45510-2-7:2002 has the status of a British Standard ICS 27.100; 29.160.30 BS EN 45510-2-7:2002 This British Standard, having been
2、prepared under the direction of the Engineering Sector Policy and Strategy Committee, was published under the authority of the Standards Policy and Strategy Committee on 26 September 2002 BSI 26 September 2002 ISBN 0 580 40472 2 National foreword This British Standard is the official English languag
3、e version of EN 45510-2-7:2002. The UK participation in its preparation was entrusted to Technical Committee E/-/20, Power engineering steering committee, which has the responsibility to: A list of organizations represented on this committee can be obtained on request to its secretary. Cross-referen
4、ces The British Standards which implement international or European publications referred to in this document may be found in the BSI Catalogue under the section entitled “International Standards Correspondence Index”, or by using the “Search” facility of the BSI Electronic Catalogue or of British S
5、tandards Online. This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application. Compliance with a British Standard does not of itself confer immunity from legal obligations. aid enquirers to understand the text; present to
6、the responsible international/European committee any enquiries on the interpretation, or proposals for change, and keep the UK interests informed; monitor related international and European developments and promulgate them in the UK. Summary of pages This document comprises a front cover, an inside
7、front cover, the EN title page, pages 2 to 30, an inside back cover and a back cover. The BSI copyright date displayed in this document indicates when the document was last issued. Amendments issued since publication Amd. No. Date CommentsEUROPEAN STANDARD EN 45510-2-7 NORME EUROPENNE EUROPISCHE NOR
8、M August 2002CEN Management Centre: CENELEC Central Secretariat: rue de Stassart, 36 B-1050 Brussels rue de Stassart, 35 B-1050 Brussels 2002 CEN/CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CEN national members and for CENELEC members. Ref. No. EN 45510-2
9、-7:2002 E ICS 27.100; 29.160.30 English version Guide for procurement of power station equipment Part 2-7: Electrical equipment Switchgear and controlgear Guide pour lacquisition dquipements destins aux centrales de production dlectricit Partie 2-7: Equipements lectriques Appareillage Leitfaden fr d
10、ie Beschaffung von Ausrstungen fr Kraftwerke Teil 2-7: Elektrische Ausrstung - Schaltanlagen This European Standard was approved by CEN and CENELEC on 2001-03-06. CEN and CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this Euro
11、pean Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CENEELEC Central Secretariat or to any CEN or CENELEC member. This European Standard exists in three offici
12、al versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN or CENELEC member into its own language and notified to the CENELEC Central Secretariat has the same status as the official versions. CEN members are the national standards bo
13、dies of Austria, Belgium, Czech Republic, Denmark, Finland, France, Germany, Greece, Iceland, Ireland, Italy, Luxembourg, Malta, Netherlands, Norway, Portugal, Spain, Sweden, Switzerland and United Kingdom. CENELEC members are the national electrotechnical committees of Austria, Belgium, Czech Repub
14、lic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, Malta, Netherlands, Norway, Portugal, Slovakia, Spain, Sweden, Switzerland and United Kingdom.EN 45510-2-7:2002 - 2 - Contents Foreword 4 1 Scope 6 2 Normative references. 6 3 Definitions . 8 3.1 Organisati
15、onal terms 8 3.2 Technical terms. 9 3.3 General terms . 9 4 Brief overall project description. 10 4.1 Role and organisation of purchaser 10 4.2 Site location 10 4.3 Equipment task . 10 4.4 Equipment to be purchased 11 4.5 Control and instrumentation. 11 4.6 Electrical supplies and other services 11
16、4.7 Other interfaces 11 4.8 Project programme . 11 4.9 Equipment identification systems 11 5 Extent of supply 12 6 Terminal points . 13 7 Operational requirements 13 7.1 Operating environment 13 7.2 Manning levels. 13 7.3 Normal operation 13 7.4 Operating hours 14 7.5 Start-up and shut-down . 14 7.6
17、 Abnormal conditions 14 7.7 Further operational requirements 14 8 Life expectancy . 15 8.1 Design life 15 8.2 Components requiring periodic maintenance 15 9 Performance requirements 15 9.1 Duty. 15 9.2 Performance 15 9.3 Equipment margins 16 9.4 Availability 16 9.5 Levels of component redundancy 16
18、9.6 Further performance requirements 16 10 Design and fabrication. 16 10.1 Specific equipment features . 16 10.2 Design justification. 20 10.3 Material selection 20 10.4 Safety 20 10.5 Interchangeability . 21 10.6 Fabrication methods 21- 3 - EN 45510-2-7:2002 11 Maintenance requirements 21 11.1 Plan
19、ned maintenance. 21 11.2 Personnel safety . 21 11.3 Requirements for access. 21 11.4 Lifting requirements . 21 11.5 Special tools 21 11.6 Test equipment . 22 11.7 Spare parts strategy. 22 11.8 Special precautions 22 12 Technical documentation requirements . 22 12.1 Tender documentation. 22 12.2 Cont
20、ract documentation 22 13 Applicable legislation, regulations, standards and further requirements 23 13.1 Legislation and regulations. 23 13.2 Standards. 23 13.3 Further requirements . 23 14 Evaluation criteria. 23 14.1 General . 23 14.2 Technical criteria 23 15 Quality measures 24 15.1 General . 24
21、15.2 Approvals procedure 24 15.3 Inspection requirements 24 15.4 Non-conformity . 25 16 Site factors. 25 16.1 Access 25 16.2 Facilities . 25 16.3 Site specific requirements. 25 17 Verification of specified performance . 26 17.1 General . 26 17.2 Works tests 26 17.3 Tests during installation and comm
22、issioning 26 17.4 Technical conditions for trial run . 27 17.5 Functional and performance tests . 27 Annex A (informative) Bibliography. 28EN 45510-2-7:2002 - 4 - Foreword This standard takes the form of a recommendation and is therefore entitled a “Guide”. This Guide for procurement has been prepar
23、ed by the CEN/CENELEC Joint Task Force Power Engineering (JTFPE) of which the secretariat is held by the British Standards Institution. The text of the draft was submitted to the formal vote and was approved by CEN and CENELEC as EN 45510-2-7 on 2001-03-06. The following dates were fixed: - latest d
24、ate by which the EN has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2003-03-01 - latest date by which the national standards conflicting with the EN have to be withdrawn (dow) 2004-04-01 This Guide for procurement has been prepared und
25、er mandates given to CEN and CENELEC by the European Commission and the European Free Trade Association. This Guide for procurement is a part of a series of Guides mandated to cover the procurement of power station plant and equipment in conformity with European Procurement Directives. The Guides ar
26、e: EN 45510: Guide for procurement of power station equipment Part 1: Common clauses Part 2-1: Electrical equipment - Power transformers Part 2-2: Electrical equipment - Uninterruptible power supplies Part 2-3: Electrical equipment - Stationary batteries and chargers Part 2-4: Electrical equipment -
27、 High power static convertors Part 2-5: Electrical equipment - Motors Part 2-6: Electrical equipment - Generators Part 2-7: Electrical equipment - Switchgear and controlgear Part 2-8: Electrical equipment - Power cables Part 2-9: Electrical equipment - Cabling systems Part 3-1: Boilers - Water tube
28、boilers Part 3-2: Boilers - Shell boilers Part 3-3: Boilers - Boilers with fluidized bed firing Part 4-1: Boiler auxiliaries - Equipment for reduction of dust emissions Part 4-2: Boiler auxiliaries - Gas-air, steam-air and gas-gas heaters Part 4-3: Boiler auxiliaries - Draught plant Part 4-4: Boiler
29、 auxiliaries - Fuel preparation equipment Part 4-5: Boiler auxiliaries - Coal handling and bulk storage plant Part 4-6: Boiler auxiliaries - Flue gas desulphurization ( De-SO x ) plant Part 4-7: Boiler auxiliaries - Ash handling plant Part 4-8: Boiler auxiliaries - Dust handling plant Part 4-9: Boil
30、er auxiliaries - Sootblowers Part 4-10: Boiler auxiliaries - Flue gas denitrification (De-NO x ) plant Part 5-1: Turbines - Steam turbines Part 5-2: Turbines - Gas turbines Part 5-3: Turbines - Wind turbines Part 5-4: Turbines - Hydraulic turbines, storage pumps and pump-turbines- 5 - EN 45510-2-7:2
31、002 Part 6-1: Turbine auxiliaries - Deaerators Part 6-2: Turbine auxiliaries - Feedwater heaters Part 6-3: Turbine auxiliaries - Condenser plant Part 6-4: Turbine auxiliaries - Pumps Part 6-5: Turbine auxiliaries - Dry cooling systems Part 6-6: Turbine auxiliaries - Wet and wet/dry cooling towers Pa
32、rt 6-7: Turbine auxiliaries - Moisture separator reheaters Part 6-8: Turbine auxiliaries - Cranes Part 6-9: Turbine auxiliaries - Cooling water systems Part 7-1: Pipework and valves - High pressure piping systems Part 7-2: Pipework and valves - Boiler and high pressure piping valves Part 8-1: Contro
33、l and instrumentation EN 45510-1 contains those clauses common to all the above Guides giving the provisions of a non equipment specific nature for use in the procurement of power station plant. EN 45510 is the responsibility of JTFPE. The so called “common clauses”, as appropriate, also appear in i
34、talics in the documents specific to particular equipment. Where paragraphs of “common clauses” are omitted, each paragraph omitted is indicated by the symbol *. In this Guide, words in bold type indicate that they have the meaning given in the definitions, clause 3. In this Guide, words and sentence
35、s not in italics are specific to this Guide and refer to the particular equipment covered.EN 45510-2-7:2002 - 6 - 1 Scope This standard gives guidance on writing the technical specification for the procurement of switchgear and controlgear for use in electricity generating stations (power stations).
36、 This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers switchgear and controlgear within installations p
37、rimarily concerned with the generation of electrical power and, where appropriate, their interconnection with the transmission and/or distribution system. It also includes main connections (busbars) associated with generator circuits and the ancillary plant forming part of switchboards and/or switch
38、ing circuits. The equipment covered by this Guide is defined by its function rather than design type. Therefore, the guidance to the specification is stated in performance terms rather than being specified by a detailed description of the equipment to be supplied. This Guide indicates to potential p
39、urchasers how their specification should be prepared so that: - the equipment type and capacity interfaces correctly with other elements of the systems; - predicted performance is achieved; - ancillary equipment is properly sized; - reliability, availability and safety requirements are achieved; - p
40、roper consideration is given to the evaluation process and the quality measures to be applied. This Guide does not determine the type of specification (e.g. detailed, performance, functional) or the extent of supply for any given contract which is normally decided on the basis of the purchasers proj
41、ect strategy. It does not cover: - any commercial, contractual or legal issues which are normally in separate parts of an enquiry; - any allocation of responsibilities which are determined by the contract. This Guide does not prescribe the arrangement of the documents in the enquiry. NOTE As a compr
42、ehensive European environmental policy is still under preparation, this Guide does not address the environmental implications of the equipment. 2 Normative references This Guide for Procurement incorporates by dated or undated reference, provisions from other publications. These normative references
43、 are cited in the appropriate places in the text and the publications are listed hereafter. For dated references, subsequent amendments to or revisions of any of these publications apply to this Guide only when incorporated in it by amendment or revision. For undated references, the latest edition o
44、f the publication referred to applies. European Standards EN ISO 9001 Quality systems - Model for quality assurance in design, development, production, installation and servicing EN ISO 9002 Quality systems - Model for quality assurance in production, installation and servicing EN 60044-1 Instrument
45、 transformers - Current transformers (IEC 60044-1, mod.) EN 60071 series Insulation co-ordination (IEC 60071 series) EN 60129 Alternating current disconnectors and earthing switches (IEC 60129) EN 60265-1 High-voltage switches for rated voltages above 1 kV and less than 52 kV (IEC 60265-1) EN 60265-
46、2 High-voltage switches - Part 2: High-voltage switches for rated voltages of 52 kV and above (IEC 60265-2)- 7 - EN 45510-2-7:2002 EN 60282-1 High-voltage fuses - Part 1: Current-limiting fuses (IEC 60282-1) EN 60298 AC metal-enclosed switchgear and controlgear for rated voltages above 1 kV and up t
47、o and including 52 kV (IEC 60298) EN 60420 High-voltage alternating current switch-fuse combinations (IEC 60420) EN 60439-1 Low-voltage switchgear and controlgear assemblies - Part 1: Type-tested and partially type-tested assemblies (IEC 60439-1) EN 60439-3 Low-voltage switchgear and controlgear ass
48、emblies - Part 3: Particular requirements for low-voltage switchgear and controlgear assemblies intended to be installed in places where unskilled persons have access for their use - Distribution boards (IEC 60439-3, mod.) EN 60439-4 Low-voltage switchgear and controlgear assemblies - Part 4: Partic
49、ular requirements for assemblies for construction sites (ACS) (IEC 60439-4) EN 60470 High-voltage alternating current contactors and contactor-based motor starters (IEC 60470) EN 60517 Gas-insulated metal-enclosed switchgear for rated voltages of 72,5 kV and above (IEC 60517) EN 60622 Sealed-nickel-cadmium prismatic-rechargeable single cells (IEC 60622) EN 60623 Vented nickel-cadmium prismatic rechargeable single cells (IEC 60623) EN 60644 Specification for high-voltage fuse-li
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1