1、 ETSI TS 102 726-2 V2.1.1 (2011-06)Technical Specification Electromagnetic compatibilityand Radio spectrum Matters (ERM);Conformance testing for Mode 1 ofthe digital Private Mobile Radio (dPMR);Part 2: Test Suite Structure andTest Purposes (TSS Essential, or potentially Essential, IPRs notified to E
2、TSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (http:/ipr.etsi.org). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be given as to the exis
3、tence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Foreword This Technical Specification (TS) has been produced by ETSI Technical Committee Electromagnetic compatibility and Radio spect
4、rum Matters (ERM). The present document is part 2 of a multi-part deliverable. Full details of the entire series can be found in part 1 i.2. ETSI ETSI TS 102 726-2 V2.1.1 (2011-06)51 Scope The present document specifies the conformance Test Purposes (TPs) for the Peer-to-Peer Digital Private Mobile
5、Radio (dPMR) standard, TS 102 658 1. TPs are defined using the TPLan notation described in ES 202 553 i.1. Test purposes have been written based on the test specification framework described in TS 102 351 2 and based on the methodology defined in ISO/IEC 9646-2 3. 2 References References are either
6、specific (identified by date of publication and/or edition number or version number) or non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the reference document (including any amendments) applies. Referenced documents which are
7、not found to be publicly available in the expected location might be found at http:/docbox.etsi.org/Reference. NOTE: While any hyperlinks included in this clause were valid at the time of publication ETSI cannot guarantee their long term validity. 2.1 Normative references The following referenced do
8、cuments are necessary for the application of the present document. 1 ETSI TS 102 658 (V2.1.1): “Electromagnetic compatibility and Radio spectrum Matters (ERM); Digital Private Mobile Radio (dPMR) using FDMA with a channel spacing of 6,25 kHz“. 2 ETSI TS 102 351 (V2.1.1): “Methods for Testing and Spe
9、cification (MTS); Internet Protocol Testing (IPT); IPv6 Testing: Methodology and Framework“. 3 ISO/IEC 9646-2: “Information technology - Open Systems Interconnection - Conformance testing methodology and framework - Part 2: Abstract Test Suite specification“. 4 ETSI TS 102 795: “Electromagnetic comp
10、atibility and Radio spectrum Matters (ERM); digital Private Mobile Radio (dPMR); Part 3: Requirements catalogue“. 2.2 Informative references The following referenced documents are not necessary for the application of the present document but they assist the user with regard to a particular subject a
11、rea. i.1 ETSI ES 202 553: “Methods for testing and Specification (MTS); TPLan: A notation for expressing test Purposes“. i.2 ETSI TS 102 726-1: “Electromagnetic compatibility and Radio spectrum Matters (ERM); Conformance testing for Mode 1 of the digital Private Mobile Radio (dPMR); Part 1: Protocol
12、 Implementation Conformance Statement (PICS) proforma“. ETSI ETSI TS 102 726-2 V2.1.1 (2011-06)63 Abbreviations For the purposes of the present document, the following abbreviations apply: BS2 Mode 2 Repeater CF (Test) ConFigurationCSF Configured Services and Facilities dPMR digital Private Mobile R
13、adio ISF Initial Services and Facilities IUT Implementation Under Test M1 Mode 1 M2 Mode 2M3 Mode 3 MS Mobile Station OACSU Off Air Call Set-Up PTT Push To Talk RC Requirements Catalogue RQ ReQuirement TP Test Purpose TSS Test Suite Structure 4 Test Suite Structure (TSS) The Test Suite Structure is
14、based on the dPMR Requirements Catalogue (TS 102 795 4). It is defined by the groups within the following TPLan specification of test purposes. The numbering is not contiguous so that new TPs can be added at a later date without the need to completely renumber the TSS groups. The test purposes have
15、been divided into four groups: - Group 1: Common requirements. - Group 2: Services. - Group 3: Channel access. - Group 4: Addressing The sub-grouping of these three group follows the structure of the RC. Some of the sub-groups of the RC contained no testable requirement. Headings for those sub-group
16、s are in this test purpose document in the node group to give a full view on the relation between RQ and TSS&TP. 5.1 Framing 5.1.1 Addressing 5.1.1.1 All Call 5.1.1.2 Dialling Plan 5.1.1.3 Talking Party ID 5.1.2 Base Station framing 5.1.3 Channel Access 5.1.3.1 OACSU 5.1.3.2 PTT Call 5.1.4 END frame
17、 5.1.5 Message frame 5.1.5.1 Message Information field 5.1.6 Payload 5.1.6.1 Packet data 5.1.6.2 Short data 5.1.6.3 T1 data 5.1.6.4 T2 data 5.1.6.5 Voice 5.1.6.5.1 Voice and attached data 5.1.6.5.2 Late entry 5.1.6.5.3 Slow user data 5.1.7 Power save ETSI ETSI TS 102 726-2 V2.1.1 (2011-06)75.1.8 Sup
18、erframe 5.1.8.1 Traffic channel 5.1.8.2 Voice TCH 5 Test Purposes (TP) The test purposes have been written in the formal notation TPlan. Configurations that are referenced by test purposes are shown in annex A. TPLan user definitions are listed in annex B. 5.1 Framing TP id : TP_PMR_0401_01 summary
19、: Payload frame length with voice data RQ ref : RQ_001_0401 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0401_01 with IUT in standby ensure that when IUT is requested to start a Voice_Transmission then IUT sends Voice_Transmission containing 384 bit Payload_Frames - xx
20、xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0401_02 summary : Payload frame length with Type 1 data RQ ref : RQ_001_0401 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0401_02 with IUT in standby ensure that when IUT is requested to start a
21、 T1_Transmission then IUT sends T1_Transmission containing 384 bit Payload_Frames - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0401_03 summary : Payload frame length with Type 2 data RQ ref : RQ_001_0401 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC
22、 ref : TC_PMR_0401_03 with IUT in standby ensure that when IUT is requested to start a T2_Transmission then IUT sends T2_Transmission containing 384 bit Payload_Frames - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0401_04 summary : Message frame length RQ ref : RQ_00
23、1_0401 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0401_04 with IUT in standby ensure that when IUT is requested to start a Voice_Transmission then IUT sends Voice_Transmission starting with a 384 bit Message_Frame ETSI ETSI TS 102 726-2 V2.1.1 (2011-06)8- xxxxxxxxxxx
24、xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0402_01 summary : There are an integral number of superframes in a dPMR transmission RQ ref : RQ_001_0402 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0402_01 with IUT in standby ensure that when IUT is
25、requested to start a Voice_Transmission then IUT sends a Voice_Transmission containing an integral_number of Superframes - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0403_01 summary : There are four payload frames in a superframe in a voice transmission RQ ref : RQ_
26、001_0403 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0403_01 with IUT in standby ensure that when IUT is requested to start a Voice_Transmission then IUT sends a Voice_Transmission containing Superframes (each containing 4 Payload_Frames) - xxxxxxxxxxxxxxxxxxxxxxxxxxx
27、xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0403_02 summary : There are four payload frames in a superframe in a Type 1 data transmission RQ ref : RQ_001_0403 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0403_02 with IUT in standby ensure that when IUT is request
28、ed to start a T1_Transmission then IUT sends a T1_Transmission containing Superframes (each containing 4 Payload_Frames) - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0403_03 summary : There are four payload frames in a superframe in a Type 2 data transmission RQ ref
29、 : RQ_001_0403 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0403_03 with IUT in standby ensure that when IUT is requested to start a T2_Transmission then IUT sends a T2_Transmission containing Superframes (each containing 4 Payload_Frames) - xxxxxxxxxxxxxxxxxxxxxxxxxxx
30、xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx ETSI ETSI TS 102 726-2 V2.1.1 (2011-06)9TP id : TP_PMR_0404_01 summary : A voice transmission is composed of header frame, integral superframes, end frame RQ ref : RQ_001_0404 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0404_01 with
31、IUT in standby ensure that when IUT is requested to start a Voice_Transmission then IUT sends a Voice_Transmission containing a Message_Frame followed by an integral_number of Superframes followed by an End_Frame - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0404_02
32、summary : A Type 1 data transmission is composed of header frame, integral superframes, end frame RQ ref : RQ_001_0404 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0404_02 with IUT in standby ensure that when IUT is requested to start a T1_Transmission then IUT sends a
33、 T1_Transmission containing a Message_Frame followed by an integral_number of Superframes followed by an End_Frame - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0404_03 summary : A Type 2 data transmission is composed of header frame, integral superframes, end frame
34、RQ ref : RQ_001_0404 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0404_03 with IUT in standby ensure that when IUT is requested to start a T2_Transmission then IUT sends a T2_Transmission containing a Message_Frame followed by an integral_number of Superframes followed
35、 by an End_Frame - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0405_01 summary : Header and end frame in manual connection request RQ ref : RQ_001_0405 TP type : conformance Role : M1, M2 config : CF_dPMR_01 TC ref : TC_PMR_0405_01 with IUT in standby ensure that whe
36、n IUT is requested to send Connection_Request then IUT sends a Connection_Request - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx ETSI ETSI TS 102 726-2 V2.1.1 (2011-06)10TP id : TP_PMR_0405_02 summary : Header and end frame in automatic connection request RQ ref : RQ_001_0405 TP typ
37、e : conformance Role : M1, M2 config : CF_dPMR_01 TC ref : TC_PMR_0405_02 with IUT in standby and OACSU_enabled ensure that when IUT is requested to send a Voice_Transmission to an individual_address then IUT sends a Connection_Request - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
38、TP id : TP_PMR_0406_01 summary : Header frame is used to acknowledge connect request RQ ref : RQ_001_0406 TP type : conformance Role : M1, M2 config : CF_dPMR_01 TC ref : TC_PMR_0406_01 with IUT in standby ensure that when IUT receives a Connection_Request then IUT sends a Ack_Frame - xxxxxxxxxxxxxx
39、xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0406_02 summary : Acknowledge frame is used to acknowledge type 1 data transmission RQ ref : RQ_001_0406 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0406_02 with IUT receiving a T1_Transmission ensure that
40、 when IUT receives End_Frame indicating Ack_Request then IUT sends a Ack_Frame - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0406_03 summary : Acknowledge frame is used to acknowledge Type 2 data transmission RQ ref : RQ_001_0406 TP type : conformance Role : M1, M2,
41、M3 config : CF_dPMR_01 TC ref : TC_PMR_0406_03 with IUT is receiving T2_Transmission ensure that when IUT receives End_Frame indicating Ack_Request then IUT sends a Ack_Frame - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx ETSI ETSI TS 102 726-2 V2.1.1 (2011-06)11TP id : TP_PMR_0406_
42、04 summary : Acknowledge frame is used to acknowledge Type 3 data transmission RQ ref : RQ_001_0406 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0406_04 with IUT is receiving T3_Transmission ensure that when IUT receives End_Frame indicating Ack_Request then IUT sends
43、a Ack_Frame - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0407_01 summary : Header and end frame pairs in manual disconnection request RQ ref : RQ_001_0407 TP type : conformance Role : M1, M2 config : CF_dPMR_01 TC ref : TC_PMR_0407_01 with IUT in standby ensure that
44、 when IUT is requested to send Disconnection_Request then IUT sends a Disconnection_Request - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0407_02 summary : Header and end frame pairs in automatic disconnection request RQ ref : RQ_001_0407 TP type : conformance Role :
45、 M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0407_02 with IUT is sending T1_Transmission to TESTER ensure that when IUT completes T1_Transmission then IUT sends a Disconnection_Request - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0407_03 summary : Header and end
46、frame pairs in automatic disconnection request RQ ref : RQ_001_0407 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0407_03 with IUT is sending T2_Transmission to TESTER ensure that when IUT completes T2_Transmission then IUT sends a Disconnection_Request - xxxxxxxxxxxxxx
47、xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx ETSI ETSI TS 102 726-2 V2.1.1 (2011-06)12TP id : TP_PMR_0407_04 summary : Header and end frame pairs in automatic disconnection request RQ ref : RQ_001_0407 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0407_04 with IUT is
48、 sending T3_Transmission to TESTER ensure that when IUT completes T3_Transmission then IUT sends a Disconnection_Request - xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx TP id : TP_PMR_0408_01 summary : Header frame and End frame pair is used to respond to a status request RQ ref : RQ_001_0408 TP type : conformance Role : M1, M2, M3 config : CF_dPMR_01 TC ref : TC_PMR_0408_01 wi
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1