1、 ETSI TS 103 242-2 V1.1.1 (2014-12) Integrated broadband cable telecommunication networks (CABLE); Testing; Conformance test specifications for 464XLAT technology; Part 2:Test Suite Structure and Test Purposes (TSS Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standar
2、ds“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (http:/ipr.etsi.org). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not refere
3、nced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Foreword This Technical Specification (TS) has been produced by ETSI Technical Committee Integrated broadband cable telecommunication networks (CABLE). The present
4、document produced for the transition technologies accommodates an urgent need in the industry to define requirements that enable seamless transition of Cable Networks to IPv6. Considering the depletion of IPv4 addresses, transition to IPv6 is required in order to enable continued growth of the custo
5、mer base connected to Cable Networks and ensure service continuity for existing and new customers. High-quality connectivity to all kinds of IP-based services and networks is essential in todays business and private life. A plethora of transition technologies have been proposed in IETF, other standa
6、rdization organizations and by manufacturers of IP technology to allow coexistence of IPv4 and IPv6 hosts, access and core networks as well as services. Each of these technology options is specified, implemented and deployed in various forms and stages. The present document is based on the requireme
7、nts of ETSI TS 101 569-1 1. The present document is part 1 of a multi-part deliverable covering the conformance tests specification for 464XLAT technology. Part 1: “Protocol Implementation Conformance Statement (PICS) proforma“; Part 2: “Test Suite Structure and Test Purposes (TSS Part 3: “Abstract
8、Test Suite (ATS) and Protocol Implementation eXtra Information for Testing ( PIXIT )“. Modal verbs terminology In the present document “shall“, “shall not“, “should“, “should not“, “may“, “may not“, “need“, “need not“, “will“, “will not“, “can“ and “cannot“ are to be interpreted as described in clau
9、se 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of provisions). “must“ and “must not“ are NOT allowed in ETSI deliverables except when used in direct citation. ETSI ETSI TS 103 242-2 V1.1.1 (2014-12)51 Scope The present document provides the Test Suite Structure and Test Purposes
10、(TSS Cable Network Transition to IPv6 Part 1: IPv6 Transition Requirements“.2.2 Informative references The following referenced documents are not necessary for the application of the present document but they assist the user with regard to a particular subject area. i.1 ISO/IEC 9646-1 (1994): “Infor
11、mation technology - Open Systems Interconnection - Conformance testing methodology and framework - Part 1: General concepts“. i.2 ISO/IEC 9646-2 (1994): “Information technology - Open Systems Interconnection - Conformance testing methodology and framework - Part 2: Abstract Test Suite specification“
12、. i.3 ETSI ETS 300 406 (1995): “Methods for testing and Specification (MTS); Protocol and profile conformance testing specifications; Standardization methodology“. 3 Abbreviations For the purposes of the present document, the following abbreviations apply: ALG Application Layer Gateway ATS Abstract
13、Test Suite CLAT Customer-side XLAT CPE Customer Premises Equipment DF Dont Fragment flag (in IPv4 header) DHCP Dynamic Host Configuration Protocol FTP File Transfer Protocol GRT Global Routing Table GW GateWay ETSI ETSI TS 103 242-2 V1.1.1 (2014-12)6HTML HyperText Markup Language ICMP Internet Contr
14、ol Message Protocol IP Internet Protocol IPv4 IP version 4 IPv6 IP version 6 IUT Implementation Under Test LSN Large Scale NAT MSS (TCP) Maximum Segment Size MTS Methods for Testing and Specification MTU Maximum Transmission Unit NAT Network Address Translation / Network Address Translator NPU Netwo
15、rk Processing Unit PICS Protocol Implementation Conformance Statement PLAT Provider-side XLAT PPTP Point to Point Tunnelling Procotol RTSP Real Time Streaming Protocol SIP Session Initiation Protocol TC Test Case TCP Transmission Control Protocol TP Test Purpose VRF Virtual Routing and Forwarding 4
16、Test Suite Structure The identifier of the TP is built according to Table 1 as recommended in the MTS methodologies. Table 1: TP naming convention for 464XLAT TP/ = root 464XLAT Mapping of Address and Port Encapsulation Mode = group CLAT CLAT CPE PLAT PLAT Large Scale NAT = sub-group BF Basic Functi
17、on NP NAT Pools AW Address Withdrawal FRAG Fragmentation MSSC Maximum Segment Size Clamping SPR Static Port Reservation NT NAT Timers ALG Application Layer Gateways RT Routing Tables AA Anycast Addressing RED Redundancy = type of testing BV Valid Behaviour tests = sequential number 01 to 99 NOTE: A
18、sub-group may not apply for all groups. ETSI ETSI TS 103 242-2 V1.1.1 (2014-12)75 Test Purposes Proposes a TP proforma which is used in the present document. The fields of this proforma as used in the present document are explained in table 2. Table 2: TP proforma field description TP ID The TP ID i
19、s a unique identifier according to the TP naming conventions Test objective Short description of test purpose objective according to the requirements from the base standard. Reference The reference indicates the clauses of the reference standard specifications in which the conformance requirement is
20、 expressed. Initial conditions (optional) The initial conditions define in which initial state the IUT has to be to apply the actual TP. In the corresponding “Test Case“ (TC), when the execution of the initial condition does not succeed, it leads to the assignment of an Inconclusive verdict. Expecte
21、d behaviour (TP body) Definition of the events, which are parts of the TP objective, and the IUT are expected to perform in order to conform to the base specification. In the corresponding TC,“ Pass“ or “Fail“ verdicts can be assigned there. 5.1 TPs for CLAT CPE 5.1.1 Basic Function TP Id TP/464XLAT
22、/CLAT/BF/BV/01 Test objective Check that IUT sends a DHCPv6 Request to the DHCPv6 Server after initialization Reference 1: clause 6.6.9.3 Feature: DHCP Initial conditions with the IUT was properly provisioned the interfaces are connected Cable Network Handbook“, June 2010. ETSI ES 201 488 (all parts
23、) (V1.2.2): “Data-Over-Cable Service Interface Specifications Radio Frequency Interface Specification“. ETSI ES 202 488 (all parts) (V1.1.1): “Access and Terminals (AT); Second Generation Transmission Systems for Interactive Cable Television Services - IP Cable Modems“. ETSI ETSI TS 103 242-2 V1.1.1 (2014-12)20History Document history V1.1.1 December 2014 Publication
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1