1、 ENGINEERING MATERIAL SPECIFICATION Material Name Specification Number Date Action Revisions 2015 12 09 N Status No replacements D. Murtonen, NA 2003 04 14 Revised Para 3.0 inserted; Para 3.1, 3.2, 3.3, 3.10, 3.11, 4 deleted 2001 04 30 Activated N. J. Komatsu Page 1 of 2 Copyright 2015, Ford Global
2、Technologies, Inc. FABRIC, MARTUR TWILL PATTERN, DOBBY WOVEN, WSS-M1H853-A UNLAMINATED NOT TO BE USED FOR NEW DESIGN 1. SCOPE The material defined by this specification is a dobby woven polyester face fabric. 2. APPLICATION This specification was released originally for material used as an interior
3、trim fabric for heavy duty applications. 3. REQUIREMENTS In addition to the requirements listed herein, the fabric shall meet all requirements of WSS-M8P18-A1/A2/A3/A4 as applicable for commercial vehicle application. Material specification requirements are to be used for initial qualification of ma
4、terials. 3.0 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements For Production Materials (WSS-M99P1111-A). 3.4 FABRIC CONSTRUCTION 3.4.1 Fabric Count, +/- 5 % tolerance (ASTM D 3775) Warp 140 ends/10 cm Weft 105 pic
5、ks/10 cm 3.4.2 Fabric Weight, range (FLTM BN 106-01) 345 - 385 g/m2 3.5 COMPOSITION (ASTM D 629) Fabric 100 % polyester ENGINEERING MATERIAL SPECIFICATION WSS-M1H853-A Page 2 of 2 Copyright 2015, Ford Global Technologies, Inc. 3.6 YARN CONSTRUCTION (ASTM D 1244) Warp 1330 dtex f288 (Polyester, semi-
6、dull, air texturized, round section) Weft 1330 dtex f288 (Polyester, semi-dull, air texturized, round section) 3.7 METHOD OF DYEING Yarn dyed or as approved by Materials Engineering. 3.8 FINISHING OPERATION As approved by Materials Engineering 3.9 FLAMMABILITY (ISO 3795/SAE J369) Burn Rate, max 100
7、mm/minute Note: Not required on face fabric when used as a fully bonded composite. 5. GENERAL INFORMATION The information given below is provided for clarification and assistance in meeting the requirements of this specification. 5.1 Purchase departments will ensure that both materials defined in this specification and shipped to any one assembly plant will be produced by one supplier only.
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1