1、GM DAEWOO Auto & Technology EDS Engineering, GM DAEWOO Auto & Technology Standards PREPARING MULTI-DRAWINGS Do Not Use on New Programs. Being Replaced by Global Design Standards EDS-A-1020 ISSUED DATE: 1996. 04. 10 REVISED DATE: 2008. 05. 31 VERSION: 3 (Superceded) EDS-A-1020PREPARING MULTI-DRAWINGS
2、 PAGE: 1/1 ISSUED DATE: 1996. 04. 10 REVISED DATE: 2008. 05. 31 VERSION: 3 GM DAEWOO Auto & Technology Note: This standard may be applied only for current project drawings generated by CATIA. It is Superceded for all future projects and replaced by Global Design Standards. 1. PURPOSE This standard a
3、ims at standardizing ways of representing several drawings with the same drawing number. 2. SCOPE This standard applies to drawings made up of several sheets due to large size and complexity, such as package, skin, layout and chart drawings. A view (front view, plan view, side view) shall be represe
4、nted in a single sheet, but section, view, detail, etc. that are drawn in the corresponding view may be represented in other sheets. 3. PREPARATION OF DRAWINGS 3.1. In case of large drawings like layout drawings, view from the front is numbered sheet 1, and sheets are constructed in the order of vie
5、w from above and view from the left/right. 3.2. In case of chart drawings, the assembly drawing is numbered sheet 1, and chart drawings are given the ensuing numbers. 3.3. Generating title block 3.3.1. Position of letters and numbers Following the drawing no., the total sheet and present sheet no. are entered. 3.3.2. Size of letters A0 or larger 5 mm A1 or smaller 3.5 mm 4. RELATED STANDARD EDS-A-1006 Lettering