1、Beneficial comments, recommendations, additions, deletions, clarifications, etc. and any data that may improve this document should be sent to: Commander, Naval Sea Systems Command, ATTN: SEA 05Q, 1333 Isaac Hull Avenue, SE, Stop 5160, Washington Navy Yard DC 20376-5160 or emailed to commandstandard
2、snavsea.navy.mil, with the subject line “Document Comment”. Since contact information can change, you may want to verify the currency of this address information using the ASSIST Online database at http:/assist.daps.dla.mil. FSC 4940 INCH-POUND A-A-59780 27 September 2005 COMMERCIAL ITEM DESCRIPTION
3、 PLURAL COMPONENT SPRAY EQUIPMENT FOR PAINT APPLICATION The General Services Administration has authorized the use of this commercial item description, for all federal agencies. 1. SCOPE. This Commercial Item Description (CID) covers plural component paint application equipment. Additional items and
4、 or services required under a specific purchasing contract are not identified in this CID. Plural component equipment provides a means of combining the “A” and “B” components of a two-component coating, mixing them at a specified ratio and spraying them through a hand-held spray gun. The unit is typ
5、ically pneumatically driven. 2. CLASSIFICATION. 2.1 Type 1. Changing the ratio requires that the metering pump displacement pistons and cylinders (lowers) be physically removed and exchanged with a different set of lowers having a different volumetric displacement. The accuracy shall be 3%. 2.2 Type
6、 2. Changing the ratio on pumps using pivoting lever arm assemblies requires that the pivot points of the metering pump displacement pistons be fixed to a new location along the lever arm by means of a pin or bolt that passes through a discrete location on the lever arm. The accuracy shall be 3%. 2.
7、3 Type 3. Mix ratio electronically selectable in fixed increments to the desired ratio setting. A key shall be required to change the mix ratio. The mix ratio shall be clearly displayed on the proportioner. The accuracy shall be 3%. 3. SALIENT CHARACTERISTICS. As a minimum, the plural component unit
8、 or “system” shall consist of the following attributes as listed below and discussed in the following paragraphs. a. Variation of component ratio b. Metering pump c. Static mixer d. Remote mixing station (or block) e. Heaters for each component f. 5- to 20-gallon (18.9- to 75.7-liter) feed hoppers o
9、r optional 55-gallon (208.2-liter) feed station for each paint component g. Solvent flush system h. Metering ratio check station i. Automatic loss of product shut down for each component Source: http:/assist.daps.dla.mil - Downloaded: 2005-09-30T07:40ZCheck the source to verify that this is the curr
10、ent version before use.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-A-A-59780 2 j. Emergency shutoff k. Overpressure safety shutoff l. Cycle counter m. Air control valve reset (for pneumatic systems) 3.1 Variation of component ratio. The ratio of
11、the A and B components s hall be set to discrete ratios vice being continuously variable. 3.2 Metering pump . The metering pump shall meter the two components of the coating system at established ratio and deliver it at the required working pressure for spraying. 3.3 Static mixer. The static mixer s
12、hall mix the metered coating material for proper curing or hardening reaction. The static mixer shall be easily removable for cleaning or shall be a disposable type. 3.4 Remote mixing station. The remote mixing station includes control and flushing valves with a static mixer. The remote mixing stati
13、on shall be capable of handling heated but unmixed material over a large transport distance from the metering pump. The remote mixing station must be capable of the following modes: a. Re circulation of unmixed components and material return to supply bins. b. Mixing (through static mixer), supplyin
14、g multiple spray gun lines c. Isolation of individual (mixed) gun lines. d. Solvent flushing of individual (mixed) gun lines without impacting operation of spray gun lines still in use. 3.5 Heaters. Heating of material and maintenance of heated conditions shall be accomplished through the use of dir
15、ect in -line heaters. Heaters shall have variable thermostatic controls. Supply lines may be heated and or insulated. Heaters shall be capable of delivering material at a minimum of 120 F (48.9 C) to gun feed lines while unit is operating at maximum rated capacity. In addition, the unit shall be cap
16、able of maintaining a minimum material temperature of 77 F (25 C) at the spray gun when unit is operating at full capacity at 40 F (4.4 C) outside temperature. Heater power requirements shall be dual 220/440 volts at 60 cycles. Heaters shall be capable of safe operation at the maximum system pressur
17、e. 3.6 Standard feed system. The standard feed system shall consist of adequate, typically 5- to 20-gallon (18.9- to 75.7-liter), A and B hoppers mounted to the unit and configured for easy detachment for removal and replacement. The hoppers shall be configured with provisions for mechanical agitati
18、on equipment when needed. The hopper feed pumps (to main metering pump) shall be capable of supplying material without cavitation while the unit is operating at maximum capacity. 3.7 Optional 55-gallon (208.2-liter) feed stations. The 55-gallon (208.2-liter) feed stations shall consist of the equipm
19、ent utilized in managing the component feed to the metering pump, including agitation equipment. The drum handling system must be powered to allow operators to manipulate the system without excessive physical labor (for example, pneumatic rams may be used to raise and lower the equipment into the 55
20、-gallon (208.2-liter) drums). If the plural component equipment is mounted in a container, the drum handling and feed system must be fully functional within the container, whether the system is hard mounted within the container, on wheels, or on a skid. The assembly must include two stations, one fo
21、r each of the unmixed paint components in 55-gallon (208.2-liter) drums. The feed system (to main metering pump) shall be capable of supplying material without cavitation while the unit is operating at maximum capacity. 3.8 Solvent flush system. The solvent flush system shall be capable of flushing
22、the entire plural feed system, to include remote mixing station and individual component feed lines as well as main metering system, without the need for physical line or hose changeovers. The solvent flush system shall be capable of providing pressures between 3000 and 5000 psi (20.7 and 34.5 MPa)
23、depending on hose lengths, number of guns, and material viscosity. Minimum volume of solvent flush system is 1.0 gpm (3.8 lpm). Source: http:/assist.daps.dla.mil - Downloaded: 2005-09-30T07:40ZCheck the source to verify that this is the current version before use.Provided by IHSNot for ResaleNo repr
24、oduction or networking permitted without license from IHS-,-,-A-A-59780 3 3.9 Metering ratio check station. The metering ratio check station shall allow for the verification of proper mixing ratio of the coating system. The ratio check station shall be capable of providing individualized volumes of
25、the unmixed components at the static line or operational pressure. The ratio check station shall have a means to simultaneously control the flow of both unmixed components (e.g., by pneumatically actuated valves or mechanically interlocked valves). The equipment manufacturer shall provide operation
26、documentation that outlines the procedures for ratio verification. 3.10 Automatic shutdown. The unit shall be equipped with a ratio metering system that is calibrated to a minimum of 3%. The ratio metering system shall be adjustable and contain an automatic safety cutout feature for both the “A” and
27、 “B” components. 3.11 Emergency shutoff. The unit shall contain a conspicuously mounted emergency or panic shutoff switch, which is activated by pushing with the palm of the hand. The switch shall be reset using a reset key. 3.12 Overpressure safety shutoff. The unit shall be equipped with an overpr
28、essure cutoff of either a blow plug (e.g., safety or rupture disc) or spring-loaded regulator (e.g., safety or relief valve). This system shall also be tied into the emergency shutoff switch. This shall prevent the machine from being reactivated without inspection. 3.13 Cycle counter. The unit shall
29、 be equipped with a cycle counter to record the total number of operational cycles. The counter shall not have a reset feature. If a reset feature is desired, a separate counter shall be required. 3.14 Air control valve reset. For pneumatically driven units, a means shall be provided to mechanically
30、 or pneumatically reset (shift) the metering pump air motor control valve (usually a spool valve). 3.15 Pressure. Units shall be capable of handling high viscosity, solvent free coatings with pot lives as short as 5 minutes at a pressure of not less than 5,000 psi (34.5 MPa) measured at the outlet o
31、f the metering pump. Units shall be able to meet these requirements while operating at an ambient temperature of 40 F (4.4 C) and providing material at the gun at a minimum temperature of 77 F (25 C). All units shall be capable of operating a minimum of two spray guns. 3.16 Piping. All piping, hoses
32、, fittings, valves, and other pressure containing components shall be rated for service at or above the maximum design pressure of the system in which they are used. In other words, components exposed to pressure from the feed pumps shall be rated for service at or above the maximum design pressure
33、of the feed pumps, and components exposed to pressure from the metering pumps shall be rated for service at or above the maximum design pressure of the metering pumps. Parts that are vented at all times (cannot be sealed to form a pressurized volume) do not have to meet this requirement. 3.17 Volume
34、. Units shall be capable of delivering an adequate paint volume to achieve a suitable spray pattern without the use of solvents or other added viscosity reducing materials, under the following conditions: 3.17.1 The maximum number of spray guns that can be attached to the unit operating simultaneous
35、ly at full capacity. 3.17.2 At an ambient temperature of 40 F (4.4 C), material at the spray guns shall be at a minimum temperature of 77 F (25 C). 3.17.3 The following configurations are to ensure that the equipment provided meets a minimum operating capability, however, with respect to current saf
36、ety and engineering ratings, the manufacturer shall determine the diameter and other specifications of the hoses from the pump to the remote mixing station. 3.17.3.1 With material mixed at a remote mixing station: Unmixed material supply lines ( inch 12.7 mm) for base component, ? inch (9.5 mm) for
37、hardener component) of 100 feet (30.5 m) running from the metering pump to the remote mixing station and ? -inch (9.5 mm) 100-foot (30.5 m) lines (plus standard whip lines) running from the remote mixing station to each spray gun. 3.17.3.2 If equipped for mixing material at the pump (i.e., without t
38、he remote mixing station): ? -inch (9.5 mm) lines of 175 feet (53.3 m) (plus standard whip lines) running from metering pump to each spray gun. Source: http:/assist.daps.dla.mil - Downloaded: 2005-09-30T07:40ZCheck the source to verify that this is the current version before use.Provided by IHSNot f
39、or ResaleNo reproduction or networking permitted without license from IHS-,-,-A-A-59780 4 3.18 Whip lines. Whip lines to the guns shall be of the standard configuration to allow minimal fatigue of painters when spraying in confined spaces. 3.19 Maintenance. Units shall be capable of delivering a min
40、imum of 1500 gallons (5.7 kL) of mixed material before any significant maintenance is required. This requirement excludes maintenance considered to be minor, such as adjustment of packing or addition of oil to throat seal cups, etc. 3.20 Physical layout. Although the physical layout of units varies
41、between manufacturers, the following design considerations shall be followed. The unit, to include the drum handling apparatus, if ordered, shall be skid mounted or containerized. Skid mounted equipment can contain provisions for wheels for ease of movement where desired. Units can consist of either
42、 one or multi-piece systems where the optional drum feed system is either attached or detached from the main metering pump assembly. The detachable drum feed system shall be self-supporting with respect to its pumps, regulation, and agitators. Each piece of a unit shall have a lifting frame capable
43、of supporting the entire load of the piece when fully loaded with material. The lifting frame of each piece shall be certified to comply with the requirements of NAVSEA 0989-LP-030-7000 - Lifting Standard. The entire system shall be explosion-proof. For containerized units, all equipment within the
44、physical boundaries of the container shall be explosion-proof, including equipment auxiliary to the pumping equipment, such as lights, heaters, and ventilation fans. All skids and containerized units shall be fabricated with provisions that allow movement by forklifts, such as forklift pockets. 4. R
45、EGULATORY REQUIREMENTS. The offeror/contractor is encouraged to use recovered materials to the maximum extent practicable, in accordance with paragraph 23.403 of the Federal Acquisition Regulation (FAR). 5. PRODUCT CONFORMANCE PROVISIONS. 5.1 Product conformance. The products provided shall meet the
46、 salient characteristics of this Commercial Item Description, conform to the producers own drawings, specifications, standards, and quality assurance practices, and be the same product offered for sale in the commercial marketplace. The government reserves the right to require proof of such conforma
47、nce. 5.2 Market acceptability. The following market acceptability criteria are necessary to document the quality of the product to be provided under this CID. 5.2.1 The manufacturer of the item must have been producing a product meeting the requirements of this CID for at least 2 years. 5.2.2 The co
48、mpany must have sold at least 1000 units meeting this CID in the commercial market place over the past 2 years. 6. PACKAGING. Preservation, packing, and marking shall be as specified in the contract or order. 7. NOTES. 7.1 Part or identification number (PIN). The following part or identification num
49、bering procedure is for government purposes and does not constitute a requirement for the contractor. AA59780 - XX X CID number Size (see code below) Type (see code below) Size Code Type Code Size Code Type Code 20-gallon capacity 20 1 1 55-gallon capacity 55 2 2 Source: http:/assist.daps.dla.mil - Downloaded: 2005-09-30T07:40ZCheck the source to verify that this is the current version before use.Provided by IHSNot for ResaleNo reproduction or networking permitted without l
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1