1、. HII.-C-24ilY5tl(SiI) AMENIIHENT 2 - I8 Harch 1986 SU WKS Ei) I NC AMKNUHKNT 1 17 June 1981 MILITARY SPECIFICATION . j-. . . . . . . I: _- - I CHARGER, BATTERY, AUTOHATIC, PORTABLE, RECTIFIER TYPE This amendment forms a part of MIL-C-24095B(SH), dated 3 October 1979, and is approved for use within
2、the Naval Sea Systems Cornaiand, Depart- ment of the Navy, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 Beneficial coaunents statement at bottom of page, line 3: Delete “SEA 3112“ . . ani. substitute “SEA 5523“. 2. PAGE 2 i 3.1: Delete and substitute:
3、 3.1 First article. When specified in the contract or purchase order, a ruplc shall be subjected to first article inspection (see 4.3 and 6.3).“ .- . . PAGE 3 I . . .e* - , 3.3.1: Add the following sentence: “The charge current range is from 3 to 45 uperer (rce 6.1).“ 3.3.2, rxth sentence: Delete. ,
4、 . ._. - i 3.3.13: Md the following sentence: “For maximum current rate, see 6.1.“ Delete “in 3.5.1 through 3.5.1.1“ and substitute “herein“. r 3.501. line 2: PAGE 11 3.5-2, line 4: Delete (h) through (r)“ and substitute “(h) through (o)“. . _-. . AHSC N/A . PSC 6130 Approved for public release; dis
5、tribution unlimited DISTRIBUTION STATEXENT A .I I of 3 L Licensed by Information Handling ServicesProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-240958 (2) 63 W 9499906 0089337 7 m MI L-C-2409 58( SH ) AMEN1)ElENT 2 * 4.2: IbIcte iiiid suhr;ti
6、tiitt?: “4.2 Ciassificatlon of inspections. The inspection requirements specified liercin arc ci;rssiicd ;is follows: - (;i) First article inspcctioii (sec 4.3). (h) tlii;ility wiiforiniiiice iiislwction (see 4.5): * 4.3: ih?letci and substitute: “4.3 First article inspection. First article inspecti
7、on shall consist of the examinations and tests specfied in 4.4.“ 4.4: Iklctc and suhstitute: - “4.4 First article, routine, and periodic inspection. Unless otherwise specified in the coiitract or purchase order (see 6.2.1). routine tests requiring electrical loading shall w performed with resistive
8、loads. except heating, shock and vibration requiring electrical loading, shall be performed with battery loads. be performed with battery loads, except heating, shock, vibration, and efficiency. Iiicipection shall consist of the examination and tests specified in table ILL.“ PACE 13 First article te
9、sts, Periodic tests requiring electrical loading shall 4.8.1: iklete and substitute: “4.8. I Bf f iciency. Koiit ine and periodic tests shall use resistive loads A battery load shall be used for only first article tests. Readiny shall be for efflciency tests. )Leters vliull be iiioerted in a.C. inpu
10、t for reading voltage, current and wattage. Installed meters shall be used to determine output conditions. made Wltlr charger charging 3 cells at 3 amperes, 12 cells at 15 amperes, and I cells at 44 aaperes for first article tests or equivalent resistive loads or toutlne and periodic inspection. Res
11、ults shall be expressed in “watts lors rather than percent efficiency.“ -z- - I PACE 20 4.1: Add: me nteiit of the current limit value associated with the rrrlous ampere hours capaclty batteries is to provide the raxium charging cur- rent feasihlc tu charge the completely discharged battery in the l
12、east uount of tlit. while keeping tlir battery temperature less than 9% 8bovc ambient. b.1: Ikletc and suhstitute: 6.2.1 Acqulrlton requirements. Acquisition docuwnts mhwld mpecify the folloulng: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(c) Le
13、vel of pwservat ion-packiiging, parking aiid marking (d) tlnckagiii): ottwr tiiiii iSYrtJt)I (see 5.2. i). (c) (f) Wtieii packaging ;aiid tr:iiisportiition support data is not . (g) Wheii routine tests requiring electrical loading performed required (secs 5. i). ()iratitity of rcy)aii. oiirts (ler p
14、ackiigc, other thiiii specified (see 5.2). rcqiii red (we 5.2. I ). with other tliiii resistive loads (see 4.4).“ PACE 2 I 6.3 and 6.3.1: Iklete aiid substitute: * “6.3 First article. Wlieii ii first article inspection is required, the items stioiild he a first article sample. ilie first article sho
15、uld consist of one unit. The contracting officer sliould include specific instructions in acquisition docu- ments regarding arrangements for examinations, approval of first article tests results aiid disposition of first articles. Invitations for bids should provide that thc Coveriiment reserves the
16、 riglit to waive the requirement for samples for first article iiispectioii to those bidders offering a product which has been previously acquired or tested by the Coveriiment, and that bidders offering such products, who wish to rely on such production or test, must furnish evidence with the bd tha
17、t prior Government approval is presently appropriate for the pending cant rac t “ ./ LAST PACE DU 1426, Standardization Document Improvement Proposal: Delete address 8nd rubstltute: COWANDER NAVAL SEA CYSTiM COMMAND (SEA S523) UEPARTHENT OF THE NAVY WASHINGTON, DC 20362-5101“ WIE: The Mrgns of this
18、amndwnt are marked with asterisks to indicate where changer (rdditions, aodif ications, corrections, deletions) from the previous mue yare nade. This was done as a convenence only and the Government assumes Crg lablity whatsoever for any fnaccuraces in these notations. Contractors are cautioned to e
19、valuate the requtrements of this document based on the entire content irtespectlve of the marginal notations and relationship to the laoc prcvf OUI .mendient. .- Bidders and Preparing activity: Navy - SH (Project 6130-ti259) 3 U Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1