1、INCH-POUNDMIL-DTL-60525B 6 January 2012 SUPERSEDING MIL-I-60525A 30 March 1990 DETAIL SPECIFICATION INITIATOR, CARTRIDGE ACTUATED, M99 METAL PARTS ASSEMBLY This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification cove
2、rs the requirements for the M99 Cartridge Actuated Initiator Metal Parts Assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3, 4, or 5 of this specification. This section does not include documents cited in other sections of this s
3、pecification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3, 4, or 5 of this specification, whether or not
4、 they are listed. 2.2 Government documents. 2.2.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitatio
5、n or contract. DEPARTMENT OF DEFENSE SPECIFICATIONS MIL-A-2550 Ammunition, General Specification For (Copies of these documents are available online at https:/assist.daps.dla.mil/ or from the Standardization Documents Order Desk, Building 4D, 700 Robbins Avenue, Philadelphia PA 19111- 5094.) Comment
6、s, suggestions, or questions on this document should be addressed to DEPARTMENT OF THE NAVY, Indian Head Division, NSWC, Code E12AP, Document Control, 4123 Artisans Court, Suite 103, Indian Head, Maryland 20640-5085, OFFICIAL BUSINESS, or emailed to amanda.pennnavy.mil. Since contact information can
7、 change, you may want to verify the currency of this information using the ASSIST Online database at https:/assist.daps.dla.mil. AMSC N/A FSC 1377 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted wi
8、thout license from IHS-,-,-MIL-DTL-60525B 2 2.2.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the so
9、licitation or contract. DRAWINGS NAVAL ORDNANCE STATION, INDIAN HEAD, MD (CAGE Code 19200 and 19203) 10520406 Initiator, Cartridge Actuated, M99, Metal Parts Assembly 8830984 Box, Fiberboard (Inner) Packing, Ammunition for Initiator, Cartridge Actuated M27, M86, M87, M98, M99, or XM107 8830985 Box,
10、Packing, Ammunition for Initiator, Cartridge Actuated M27, M86, M87, M98, M99, or XM107 9241155 Box, Fiberboard (Outer) Alternative, Packing Ammunition, for Initiator, Cartridge Actuated M27, M86, M87, M98, M99, or XM107 (Application for copies should be addressed to DEPARTMENT OF THE NAVY, Indian H
11、ead Division, NSWC, Code E12P, Document Control, 4123 Artisans Court, Suite 103, Indian Head, Maryland 20640-5085, OFFICIAL BUSINESS.) 2.3 Non-Government publications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these
12、 documents are those cited in the solicitation or contract. American National Standards Institute (ANSI)/American Society For Quality (ASQ) ANSI/ASQ Z1.4 Sampling Procedures and Tables for Inspection by Attributes (DoD adopted) ASQ A8402 Quality Management and Quality Assurance Vocabulary (Copies of
13、 this document are available online at http:/www.asq.org/, or from the American Society for Quality, PO Box 3005, 611 E. Wisconsin Ave., Milwaukee, WI 53201-4606.) INTERNATIONAL ORGANIZATION FOR STANDARDIZATION ISO 3601-3 Fluid power systems O-ring Part 3: Quality acceptance criteria (Application fo
14、r copies should be addressed to the International Organization for Standardization, 1, ch. de la Voie-Creuse, Case postale 56 CH-1211 Geneva 20, Switzerland) 2.4 Order of precedence. Unless otherwise noted herein or in the contract, in the event of a conflict between the text of this document and th
15、e references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DT
16、L-60525B 3 3. REQUIREMENTS 3.1 First article. When specified in the contract or purchase order (see 6.2), a sample shall be subjected to first article inspection (see 4.4 and 6.3). 3.2 Materials. All materials used in the manufacture of the initiators shall conform strictly to the specifications ref
17、erred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained from the cognizant Navy design activity prior to manufacture. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be cle
18、arly stated in the proposal. 3.2.1 Raw material. The contractor shall be responsible for selecting from the classification list contained in the raw material specification the surface and physical condition of the raw material intended for use in manufacture. 3.3 Hardness and other physical properti
19、es. Physical properties required by the drawing shall be uniform throughout the part within specified tolerances. Requirements for all alloy steel parts shall be achieved by quenching and tempering. 3.4 Hydrostatic pressure. The initiator chamber and cap shall withstand a hydrostatic pressure of 14,
20、000 to 15,000 pounds per square inch (psi) for 15 seconds, minimum, without deformation or mechanical failure (see 6.4.1). 3.5 Firing pin release. The firing pin of the metal parts assembly, less safety pin, shall release from the cocked position when the application of an axial load of 18 to 25 pou
21、nds has withdrawn the initiator pin 0.370 inch, minimum, and 0.425 inch, maximum. 3.6 Initiator pin security. Application of an axial load of 200 to 220 pounds to the initiator pin of the metal parts assembly shall not withdraw the initiator pin past the safety pin. Load application shall cause no p
22、ermanent deformation of the safety pin. 3.7 Metal parts assembly. Parts shall be combined to produce an assembly which conforms to the requirements of the metal parts assembly drawing. All threaded joints shall be assembled handtight. 3.8 Protective finish. Protective finish shall be in accordance w
23、ith the applicable specifications and shall apply to all surfaces of the component regardless of contour configuration. 3.9 Residual magnetism. The metal parts assembly shall not deflect the indicator of the compass more than 5 degrees in either direction using procedures in 4.6.6. 3.10 Workmanship.
24、 The requirements for workmanship are as specified on the applicable drawings, referenced specifications and the following: 3.10.1 Metal defects. All components shall be free from cracks, splits, cold shuts, inclusions, porosity or any similar defect. 3.10.2 Burr. No part shall have a burr which mig
25、ht interfere with the assembly or function of the item or which might be injurious to personnel handling the item. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-60525B 4 3.10.3 Foreign matter. No part or assembly shall contain chips, dirt,
26、grease, rust, corrosion or other foreign matter. 4. VERIFICATION 4.1 Quality assurance terms and definitions. Reference shall be made to ASQ A8402 to define the quality assurance terms used. 4.1.2 Inspection. Inspection shall be in accordance with MIL-A-2550. 4.2 Classification of Inspections. The i
27、nspection requirements specified herein are classified as follows: a. First article inspection (see 4.4) b. Quality conformance inspection (see 4.5). 4.3 Inspection conditions. Unless otherwise specified, all inspections shall be performed under the following conditions: a. Temperature: Room ambient
28、 20 to 25 C (68 to 77 F) b. Altitude: Sea level c. Humidity: 50 percent relative, maximum. d. Atmospheric pressure: 14.7 psia 4.4 First article inspection. At the beginning of regular production, the contractor shall submit a first article sample to a Government approved facility for evaluation. The
29、 sample shall consist of 5 metal parts assemblies, 9 sets of unassembled parts, and 1 set of unassembled parts without plating or final protective finish. The sample shall be manufactured in the same manner, using the same materials, equipment, processes, and procedures as used in regular production
30、. All parts and materials, including packaging and packing, must be the same as will be used for regular production and shall be obtained from the same source of supply. After inspection and provisional acceptance at source, the first article sample shall be inspected for all requirements of the dra
31、wings and specifications. The Government reserves the right to require new first article samples until such time as an acceptable sample is submitted (see 6.3). 4.5 Quality conformance inspection. 4.5.1 Lot. 4.5.1.1 Submission of product. The product shall be submitted in accordance with ASQ Z1.4. 4
32、.5.1.2 Size of lot. For the purpose of identification and shipment, the shipping lots of metal parts assemblies shall consist of 1200 assemblies, maximum, provided the homogeneity requirements of inspection lots have been retained. 4.5.2 Examination. One-hundred percent examination shall be performe
33、d for all critical defects. Examination for major and minor defects shall be performed. Four power (4X) magnification may be used in performing visual examination for such defects as burr and foreign matter. Inspection for rubber O-rings shall be in accordance with ISO 3601-3. When compliance with t
34、he applicable requirement is in doubt as a result of visual examination, the characteristic shall be measured or gaged to determine acceptability. All nonconforming material shall be rejected. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-6
35、0525B 5 4.5.2.1 Chamber, Initiator, Drawing 10520407, covering a detail of Drawing 10520406. Characteristic Defect Method of Inspection Critical 1 Absence of output port Visual Major 101 Pitch diameter of large external thread, min Gage 102 Major diameter of large external thread, min Gage 103 Pitch
36、 diameter of small external thread, min Gage 104 Major diameter of small external thread, min Gage 105 Pitch diameter of internal thread, max Gage 106 Minor diameter of internal thread, max Gage 107 Concentricity of datum location with pitch diameter Gage of small external thread 108 Concentricity o
37、f pitch diameter of large thread Gage with cavity 109 Concentricity of large external thread pilot with Gage large external thread 110 Concentricity of counterbore with cavity, including Gage perpendicularity with base of counterbore 111 Diameter of counterbore Gage 112 Diameter of large thread pilo
38、t Gage 113 Depth of cavity Gage 114 Length to datum location Gage 115 Thickness of wall, min Gage 116 Metal defective Visual 117 Protective finish inadequate or defective Visual 118 Surface finish improper in cavity and angle of gas port Visual 119 Burr Visual 120 Foreign matter present Visual Minor
39、 201 Pitch diameter of large external thread, max Gage 202 Pitch diameter of small external thread, max Gage 203 Pitch diameter of internal thread, min Gage 204 Diameter of small external thread relief Gage 205 Diameter of small external thread pilot Gage 206 Diameter of hole in gas port Gage 207 Di
40、ameter of cavity Gage 208 Depth of counterbore Gage 209 Length of gas port Gage 210 Length of small thread relief Gage 211 Length from face of gas port to small thread Gage 212 Length of external thread pilot Gage 213 Thickness of wall, max Gage 214 Depth of threaded hole Measure 215 Diameter of cha
41、mfer at internal thread Measure 216 Total length Measure Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-60525B 6 217 Length of large external thread Measure 218 Marking missing, incorrect, or illegible Visual 219 Radius or chamfer missing or
42、 incorrect Visual 220 Surface finish improper, except as otherwise classified Visual 4.5.2.2 Cap, Initiator, Drawing 10520408, covering a detail of Drawing 10520406. Characteristic Defect Method of Inspection Critical None defined Major 101 Pitch diameter of external thread, min Gage 102 Major diame
43、ter of external thread, min Gage 103 Pitch diameter of small internal thread, max Gage 104 Minor diameter of small internal thread, max Gage 105 Pitch diameter of large internal thread, max Gage 106 Minor diameter of large internal thread, max Gage 107 Concentricity of pitch diameter of large intern
44、al Gage thread with midsection cavity, including perpendicularity with base of counterbore of large cavity 108 Concentricity of large cavity behind undercut with Gage pitch diameter of large internal thread 109 Concentricity of pitch diameter of small internal Gage thread with midsection cavity 110
45、Concentricity of hole between small cavity and boss Gage cavity with midsection cavity 111 Concentricity of undercut in large cavity with large Gage internal thread 112 Concentricity of small cavity with hole between small Gage cavity and boss cavity 113 Concentricity of boss cavity with midsection cavity Gage 114 Symmetry of width across flats with pitch diameter Gage of external thread 115 Diameter of large cavity rear of undercut Gage 116 Diameter of small cavity Gage 117 Diameter of boss cavity, max
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1