1、MIL-I-22LLI LI9 7779906 02L16122 T E . MJL-1-22814 (wep) 15 May 1962 MILITARY SPECIFICATION AN/ApM-132 INCLINOMETER SF2 This specification has been approved by the Bureau of Naval Weapons, Department of the Navy 1. SCOPE 1.1 Scope - The inclinometer covered by this specification shall be for flight
2、line or shop use and shall provide the functions and facilities necessary to measure the alignmnt of the vertical gyro with respect to the AMCS Aero XU. 1.2 Classification - The inclinometer specified herein shell be of one type an shall con- sist of the foliowing: Max. Allow (Size Inches) Allar Agp
3、l. Type Designation W H 1, t. Lbs. Para. Inclinometer -1336/pi1-132 4 8 9*5 10.0 3.4.1.1 interconnecting Cable Assembly w-1 5 ft. long 1.5 3.4.1.2 Feeler Gage .loo General Specification for Preparation for Delivery of Electronic Equip Preproduction ad Inspction, For Aircraft Electronic Equipment, Fo
4、rmat For interference Limit8 and Tests; Aircraft Electrical and Electronic Equipment MILP-17555 MIL-N-18307 11-18303 MIL-I-6181 2.2 Availability of Documents (1) When requesting specifications, standards, drawings, and publications refer to be obtained upon application to the both title and number.
5、Copie8 of this specification and applicable specifications required by con- tractors in Connection with specific procurement functions Cammning Officer, Naval Supply Depot, Code CDS, 5801 Tabor Avenue, Philadelphia 20, Pennsylvania. 3. FuQm-s 3.1 Parts and Materials - In the selection of parts and m
6、aterials, fulfillment of major (i) Parts and materials requirements shall conform to Specification MIM-WBOO. design objectives s. The transition from Roll to Climb mounting shall be capable of being made quickly and easily. 3.4.1.1.4 Synchro Control Trafisformer - The inclinaneter shall contain EI s
7、ynchro control transformer to receive e ectr Ca s s om , S2 and S3 of either synchro trammitter in the Generator, Stabilizatiilgnalfhall have a transformation ratio of 0.735 f 6. The synchro shall be capable of being rotated in its mounting using a pinion wrench, Buor Dwg. 677036. 3.4.1.L.5 Gravity
8、Sensing Device - Attached to the rotor of the Synchro Control Transformer epecsied in para. 3.4.1.1.4 above, shall be a gcavity sensing device of Sufficient weight to maintain a rotor constaat vlth respect to earth when rotation not exceeding fi8“ is imparted to the stator. This device shall be damp
9、ed with a damping factor of 0.8 i 0.1. Wrnal facility shall be provided to lock the rator of the synchro control tr 3.4.1.4 men rench - A standard 1/8 inch Allen type wrench shall be -the Iiiclincmeter (ref. para. 3.4.1.1) on the boresight pad of the Antenna AS-94)5. The governent inspector and the
10、procurh activity shall be advised when tests are to be conducted so that a representative may be designated to witness or supervise the tests when so desired. obtain the services of a commercial testing laboratory. 4.2.1.1 The contractor shall submit a31 data collected in conducting these tests to t
11、he prOcUrlng agency for review and approval. This data shall include a list of all electrical and elec- tronic parts giving the* specified voltage, current and temperature rating and the applie cixcuit voltage, current and ambient and surface temperatures. The ambient and surface temperature shall b
12、e obtained under the extreme high temperature operating condition. This data may be included as part of the lzeliminary parts list. and when requested by the procuring activity, the equipment shall be delivered to a specified govern- ment laboratory for additional testing. This additional testing ma
13、y consist of duplicating tests previously conducted and such however, it maybe reworked by the contractor and submitted for acceptance as a production equi-. 4.2.5 Equipnts suppliea under the contract shall in ail respects, including design,. - r c- -7 I 4 Provided by IHSNot for ResaleNo reproductio
14、n or networking permitted without license from IHS-,-,-MIL-1-22834 47 9777706 0246326 7 I HILI-22814 (Wep) oaastruction, worlaaanship, performance and qualitybe equivalent to the approved preproduction sampla. Wch equipkt shall be capable of successfully passing the 88p# tests Imposed on the preprod
15、uction sample. Evidence of non-compliance w$th the abave shall constitute cause for rejection or if aireaay accepted by the government it shall be the obligation of the contractor to make necessary corwctiaie as approved by the procuring activity. be selec-6ed from the first 10 prouction equipments
16、submitted for acceptance and sent to a designate government laboratory for tests. The equipment shaU be selected by the gaveniment bpsctor after the equiwnt has successfully passed all individual tests. 4.3 FToduction Sample Tests - When requested by the procuring activity, one equipment shall 4.3.1
17、 Scope of Tests - This equipnt may be subjected to any and aU tests the pracirring activity deems necessary to assure that the production equipment is equivalent to the approved pre- production Elample in design, construction, worhnship, pexfomce and quauty and that it is amble of meeting all applic
18、able requirements. curing activity upon satisfactory completion of all tests. Any design, material gr perfannance defect made evident during this test shall be corrected by the contractor to the satisfaction of the procuring activity. the contract shal cease until proper corrective action is approve
19、d and uccomplished. Cmctive action shall alsobe accomplished on equipmehe previoususly accepted when requedtedby the procuring activity. 4.3.2 Production Sample Approval - Approval of the production sample shall be by the pro- pon failure of the production sample to pass any of the testgdelivery OP
20、equipent under 4.3.3 Reconditioning of Production Test Sample - On compleeion of the productian 8ainple test the equipment shall b e reworked by the contractor by replacing all worn or dame ibm8. After reworkbg the contractor shaU. resubmit the equipnent for acceptance. 4.4 Acce ance Tests - The con
21、tractor shall furnish all samples and shall be responsible for accmplishingt + e acceptance tests. W. inspection and testing shall be under tM supervision oi the government inspector. Contractors nut havingtesthg facilities satisfactory tthe procuring activity shall engage the service of a commercia
22、l testing laboratory acceptable to the procuring activity. tests. as applicable. Acceptance or approval of material during the course of manufacture shall not be conStr?aed as a guarantee of the acceptance of the finished product. Acceptance tests shall con8Ist of the following: The contractor shall
23、 furnish test reports showing quantitative results for all acceptance Such reports shall be signed by an authorized representative of the contractor or laboratory, (1) Individual Tests (2) Sampling Tests (3) Special Tests 4.4.1 Individual Tests - Each equipent subn$tted for acceptance sbell be subjc
24、ctsd fo the individual tests. These tests shall be adequate to determine compliance with the repuirsments of material, worhamship, operatioml adequacy and reliability. As a minimimr, each equipeat accepted shall bave passed the following tests: (i) Examination of Product (2) Operational Test (3) Man
25、ufacturing Reliability Test 4.4.1.1 Examination of Product - Each equipment shall be examined carefully to detennine that, the material and workmnship requiremts have been met. 4.4.1.2 Operational Test - Each equipnt shall be operated 1- enaugh to penult ths equipment temperature to stablilze and to
26、 check sufficient characteristics and record adequate es prior to the beginning of-tte 6-hour period of operation. Wbere feasible, the equipnt shall be operated during We vibration period for the purpose of detectting flaws and Imperfect workmanship. Operation within the epecifled Wts of satisfactor
27、y performance is nut necessarily required during the Vibration period. The direction of vibration shoud be vertical to the nonaal mounting plane for 5 mlnutes end lateral to the vibratioii period need not be repeated when it is certain the failure XaS not a result of the Vibration. Should repetitive
28、 failures occur, corrective action shall be tiiken to elhhate this defect from fubure equimt. A record shall be kept; of all failures. The $-hour period speci- fied above my be cmsed of two 3-hour periods to conform with sWard working hours, Campian; tests shall be conducted on eqipnts which have su
29、ccess- fuiiy passed the -ti. Equlpnts shell be selected for sampling except that when a Prouction Sample is requested and delivered to a goverment labmatory for test Failure - Should a failure occur durhg either the sampling or specid teet, the following action shall be taken: (i) Determine the caus
30、e of failure. (2) Determine if the failure is an isolated case or design defect. (3) Submit to the rocuring activity for approval, proposed corrective action intenaed to rezuce the possibility of the same faJlme(s) occuring in futura tests. (4) Where practical, include a test in the individual test
31、to check all equipe (5) Whenever a failure occurs, shift to one (i) sample unit out of ten (io) au proceed with testhg as indicated in paragraph 4.4.2 4.5 Test Procedures - The procedures used for conductin; preproduction feste and acceptance tests shall b prepered by the contractor. govenmiont insp
32、ector to modify or require any additional tests e- necesmry ,to determine cm- pliance with the requirements of this specification or the contract. be used as a- When test procedures are available fran pre- vim contracts such procedures may be used when approved by the procuring activity. 4.6 Presubm
33、ission Test- - No item, Part; or ccnqplete eqapnt shall be subnnitted by the contractor until it has been previously tested and inepected by the contractor aiad foun8 to capsly, to the best of his knowledge and bdlief, with a13. appllcable requiremnts. 4.7 Rejection and Retest - EquipmSnt which has
34、been rejected niay be reworked or have parte replace8 to correct the d efects and resubniitted for acceptance. Before resubmitting , fU. part;iculars concerning previo- rejection and the,action taken to correct the defects found in the originel ebill be furnieiied the government inspector. The right
35、 is reserved by the procuripg activity or the Specification MILJl!-l8303 shall 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-=-1s are used for any purpose other than in connection with a definitely related Government procurement operation, the Un
36、ited States Government thereby incurs no responsibility nor any obligation whatsoever; and the fact that the Government may have formulated, furnished or in any way supplied the said drawings, epecifications or other data is not to be regarded by Implication or otherwise as in any manner licens- ing
37、 the holder or any other person or corpoxation, or conveying any rights or permission to manufacture, we or sell any patented invention that my in any way be related thereto. 6.4 Where it appears a substantial reduction in size and weight or improvement When investigation shows advantages can be realized, a request for approval 6.5 The parentheses (*), when used in the type designation, shall be replaced . , _- i ,- i 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-