1、MIL-L-85532 (AS) Amendment 1 10 December 1987 MILITARY SPECIFICATION LOADER, WEAPONS, AIR LAUNCHED, A/S32K-1 D This amendment forms a part of mi 1 i tary specification MIL-L-85532 (AS), dated 13 Apri 1 1983, and is approved for use within the Naval Air Systems Command, . Department of the Navy and i
2、s available for use by all departments and agencies of the Department of Defense. PAGE 2 2.1.1 Specifications, federal, delete last line: “MIL-B-83769/6 Battery, Storage, Lead Acid. II PAGE 3 2.1.1 Standards, military, delete: “MIL-STD-808 Finish, Protective and Codes, For Finishing Schemes For Grou
3、nd and Ground Support Equipment.“ 2.1.1 Specifications, military, delete: “MIL-STD-838, Lubrication of Military Equipment.“ 2.1.1 Drawings, Naval Air Systems Command, add: “1378AS305 Lubrication Chart II PAGE 6 3.7.2 Delete second sentence and substitute: “It shall have six whe.els, one pair on each
4、 outrigger and two on the rear steer/drive axle.“ 3.7.2.1 At the end of line a, add: “(Maximum).“ PAGE 7 3.7.2.1 . d Change 6600 to “6700“ pounds. 3.7.2.4 Delete the last two sentences of this paragraph. 3.7.2.5 Delete the third sentence. Add to last sentence: II, in accordance wi th drawi ng 1378AS
5、305. II PAGE 8 3.7.3.2.1 Delete 3.7.3.2.1 in its entirety and substitute: “3.7.3.2.1 Battery. Lead Acid batteries supplied for the loaders electrical system shall conform to S.A.E. Group 31 standards with 525 cold cranking amps (minimum) capacity.“ AMSC N/A 1 of 4 FSC 1740 DISTRIBUTION STATEMENT A:
6、Approved for-public Feleafe; distribution is unlimited. L . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-L-85532 (3) 37 m 9999906 0207083 3 m MIL-L-85532 (AS) PAGE 8 (Contd) 3.7.3.3 In the second and third line, delete “an oil bath“ and 3.7.3
7、.3.1 Delete the last two sentences. substitute: lia dry element.“ PAGE 9 3.7.3.6 In the last line, delete 144“ and substitute: i1142.“ 3.7.4.1 In the fourth line, delete “89“ and substitute: “86.“ 3.7.4.1.1 In the second line, delete “30“ and substitute: “25.“ In the third line, delete “89“ and subs
8、titute: “86.“ 3.7.4.1.5 In the fourth line, delete “89“ and substitute: “86,“ PAGE 11 3.8.4 In the third line, delete “Class IIIC“ and substitute: “Class C1, Group II.“ PAGE 12 3.10.2 Delete the last sentence and substitute: “All stenciling instructions are listed on 1378AS225.“ # 3.10.3 At the end
9、of the fir.st sentence, add: II, if required by the acquisition activity.“ PAGE 13 3.12 Add new paragraph: “3.12 Workmanship. The loader A/S32K-lD for air lauched weapons shall conform to the quality established by this specification and the documents referenced. All metal components shall be free f
10、rom burrs and sharp edges. By visual inspection, the loader shall be produced in accordance with current manufacturing techniques and processes. Al 1 safety markings and features shall be verified. PAGE 14 - 4.1.1 “4.1.1 Responsibility for compliance. All items must meet all requirements of sections
11、 3 and 5. specification shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not re1 ieve the contractor of the responsibi 1 i ty of assuring that all products or supplies submitted to the Governmen
12、t for acceptance comply with all requirements of the contract. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material .I Delete existing paragraph and substitute: The
13、 inspection set forth in this 2 ! Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-L-85532 (AS) PAGE 16 4.8.2.1 Delete Para. 4.8.2.1 and substitute: “4.8.2.1 Speed. Each production loader shall be timed once through an 88 foot time trap during the
14、 road test conducted in accordance with 4.8.2.5. Every 50th production loader shall be given a complete test.“ 4.8.2.4 Delete Para. 4.8.2.4 and substitute: “4.8.2.4 Turning radius. Every 50th production loader shall be tested in accordance with test method No. 2 of Appendix A.“ PAGE 17 4.8.2.5 Add t
15、o the end of the paragraph: “Each product be tested for at least five miles while loaded with 4500 lbs. production loader shall be given a complete test.“ on loader shall Every 50th 4.8.2.6 Add to the end of the paragraph: “Each product on loader shall Every 50th production loader shall be given a b
16、e tested on a 20% Grade for three minutes with the service brakes applied and containing a load of 4500 lbs. compl e te tes t. I 4.8.2.10 In the last line, delete 144“ and substitute: 142.“ 4.8.2.11 Delete lines 3 and 4, substitute: “25 feet per minute using the rear controls and the engine running
17、at 2400 RPM, from 2 to 86 inches above the ground. It shall be demonstrated . . .II Add to the end of the paragraph: “Every 50th production loader shall be given a complete test.“ PAGE 18 4.8.2.11.3 In the third line, delete “89“ and substitute: “86.“ Add to the end of the paragraph: compl e te tes
18、t. I “Every 50th production loader shall be given a 4.8.3 Add to the end of the paragraph: “Every production loader shall Every 50th production loader shall be given a complete test.“ be tested by completing one full cycle while carrying a load of 4500 lbs. (Less the fail safe test of Para. 4.2.8.2.
19、11) after the overload test of Para. 4.8.2.11.2. PAGE 22 Table I. Third item from the bottom, delete “X“ for the quality conformance test portion of the overload test. PAGE 28 3b. Delete 10“ and substitute: 13.“ Provided by IHSNot for ResaleNo reproduction or networking permitted without license fro
20、m IHS-,-,- MIL-i-85532 (1) 17 7797706 0207083 7 MIL-L-85532 (AS) PAGE 29 3c. Delete “501“ and substitute: “501.1 .I PAGE 30 Test Method 3.K(3 Delete (3) and substitute: paragraph (3); “(3) Perform cycling as listed in Para. 4.8.3 except only 10 cycles are required instead of 250.“ “(4)“ and add new
21、PAGE 31 Test Method No. 4, Para. 2 Add the following to the end of the line: to be maintained throughout testing.“ II, PAGE 32 Test Method No. 4, Para. h (3) Renumber Para. (3) and substitute: “(4)“ and add new Para. (3): except only 10 cycles are required instead of 250.“ “(3) perform cycling as li
22、sted in Paragraph 4.8.3, PAGE 33 Test Method No. 5, Para. 2.a Delete 507“ and substitute: “507.1.“ Test Method No. 5, Para. 2.c Delete 507“ and substitute: “507.1“ and in the second line, delete: “MIL-STD-810.“ I Preparing Activity (Project No. -1740-N159) Navy - AS 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1