1、MIL-STD-1323 -237A 1 = 7777733 0073484 1 s - 37- 0 p MILITARY STANDARD M IL-ST D-132 3 -2 39A (NAVY) 11 JANUARY 1988 M1L-STD-1323-231 _ UNIT LOAD FOR UNDERWAY REPLENISHMENT BOM6,GENERAL PURPOSE: 500 LB MK 82 MOD 2 (THERMALLY PROTECTED) 29 JUNE 198l AND BMBrBDU-45/B, INERT LOADED, (THERMALLY PROTECTE
2、D) ON PALLET, LOADING AND STORAGE (MHU-l22/E, DL 623AS100, AND MHU-l22A/E, DL 623AS200) LIK 82 MOD 2 BOU-4518 UNIT LOAD DATA DODICIMALC NO. E488 Fol9 NUMBER OF BOMBS PER UNIT LOAD. GROSS WEIGHT OF ONE CONTAINER 485 LBS WEIGHT OF BOMB PALLET 170 LBS WEIGHT OF STEEL STRAPPING. 13 LES GROSS WEIGHT OF U
3、NIT LOAD . 3.093 L8S WEIGHT OF BOTTOM FRA ME 108 LBS CUBE 36.1 CU FT BOMB,GP, 500 LB, MK 82 MOD 2 (THERMALLY PROTECTED) 30003-4902353 . . DO NOT USE FOR SHIPPING WEIGHT DO NOT STACK MORE THAN 6 UNIT LOADS HIGH IN STORAGE VICATION (MK 82 MOD 2 ONLY) WT . CLASS A CG. . CLASS X-A MSC NO, - N/A APPROVED
4、 FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED NOTES: L. UNLESS OTHERWISE SPECIFIED. DIHEWSIONS ARE IN INCHES. CLARIFIED STRAPPING PROCEDURE ADDED EXTRA TAIL, STRAP. ITEM 6. TO PREMMT RO- 2. FOR CROSS REFERENCE TO ASSOCIATED TRUCKLOADIWG. TATIOI OF OUT OF TOLER- CONTAIIIERLOADING AND CARLOADING MILI
5、TARY STANDARDS. ANCE BOMBS I . REFER TO INDEX TO STANDARDS MIL-HDBK-236 (NAVY). EV TOA I SYSCOM TR REVISION DESCRIPTION DATE APPROVAL I FSC 8140 THIS UNIT LOAD IS AUTHORIZED AND RELEASED FOR SHIPPING,HANDLING SIORAGE ANC TRANSFER-AT SEA. Ir MAY ALSO EL USEE FOR REQUIREMENTS FOR CONSTRUCTION OF THIS
6、UNIT LOAD SHALL CONSIST OF THIS DOCUMENT AND THE LATEST ISSUE DOMEjTIC SHIFMWAIN CGMPLIAkCE WITH COT REGULATIONS. OF MIL-STD-1323 (NAVY). Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- NIL-STD-lt323 -239A 83 99999LL O073485 3 MIL-STD-1323-239A (NAV
7、Y) PALLETIZING PROCEDURE (A) POSITION THE LONGITUDINAL STRAPPING, ITEM q. UNDER THE NOTCHED SECTIONS OF THE BOTTOM FRAME. (BI PLACE THREE BOMBS ON THE BOTTOM FRAME. ITEM 1. WITH THE FORWARD END OF THE BOMBS ON THE FORWARD END OF THE FRAME. OF THE LUGS SHOULD BE PARALLEL TO THE LONGITUDINAL AXIS OF T
8、HE BOMB. POSITION, THEY WILL FIT ON THE OUTSIDE OF THE CENTER HAT SECTIONS ANO THE BOMBS MUST BE TURNE0 SO THAT THE LUGS WILL BE IN THE 5 OR 7 OCLOCK POSITION. POSITION THE INTERMEDIATE FRAME. ITEM 2. ON ?HE FIRST ROW OF EMBS. VERTICAL TO THE CENTER HAT SECTIONS OF THE BOTTOM FRAME. SEE VIEW B-B. PO
9、SITION THE SECOND ROW OF 8oF8S ON THE INTERMEDIATE FRAME. WITH SUSPENSION LUGS DOWN ANO IN THE SAME POSITION AS THE FIRST ROM. POSITION THE TOP FRAME. ITEM 3. WITH THE FORWARD END OF THE FRAME IN THE SAME DIRECTION AS THE FORWARD END OF THE BOMBS. POSITION THE LONGITUDINAL STRAPPING. ITEM 4, BETUEEN
10、 THE ENDS OF THE BOMBS AND THROUGH THE SLOTS IN THE TOP FRAME. TENSION. ANO DOUBLE NOTCH THE SEAL. ITEM 7. WSITION STRAPPING. ITEM 5. UNOER THE CHANNELS OH THE BOTTOM FRAME (SEE DETAIL A) AND AROUND THE UNIT LOAD, TENSION AND DOUBLE NOTCH SEAL. THREAD STRAPPING. ITEM 6. AROUND OUTBOARD BOMBS. WEAVIN
11、G AROUHD AND OVER THE TOP OF THE CENTER BOMB AS SHOWN IN SECTION A-A AND DETAIL B. STRAPPING TO BE ADJACENT TO THE SHIPPING CAPS. ASCERTAIN THE PROPER ALIGNMENT OF THE SUSPENSION LUGS. THE LONGITUDINAL AXIS WITH THE LUGS IN THIS SEE SECTION A-A AND VIEW B-B. (Cl (D) SEE SECTION A-A AND VIEW B-B. (E)
12、 (FI (G) (Hl MARKING: IN ADDITION TO ANY SPECIAL VARKING REQUIRED BY CONTRACT OR ORDER. THE UNIT LOAD SHALL BE MARKED IR ACCORDANCE WITH MIL-STD-1323. NOTE, tF nv0 AND AFl NIffiS ON fOl AND bOTTOMFWS ALE NOT LEGBLE, TM WIMR SPACING IEIWEEN HAT SECTIONS (SAWUS) Q / DENOTES THE FWD END OF THE FW. - NO
13、TES: i. UNLESS OTHERWISE SPECIFIED. ALL MATERIAL SHALL BE IN ACCORDANCE WITH MIL-STO-1323. 2. EARLY PRODUCTION TOP FRAMES. ITEM 3. HAVE EXTENOED ANGLES (46-3111 LONG) AS SHOWN IN PHANTOM. 3. DO NOT USE TYPE 1 STRAPPING WITH PONER MACHINE. 6 7 SEAL SEE NOTE 1 11/4 1 6 STRAPPING SEE NOTES 183 1 1/4X.O
14、35X 9 FT 3 5 STRAPPING SEE NOTES 183 1 1/4X.O35Xll FT 2 4 STRAPPING SEENOTES 183 1 1/4X.O35X12FT i . I I FRAME. TOPPALLFT REQD LTEM DESCRIPTION MATL/DWG DIMENSION! I I LIST OF MATERIALS PAGE 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a MIL-STD
15、-1323 -237A 1 W 9997711 0071486 5 W M IL-STD-13 2 3 -2 39A (NAVY) DEPALLETIZING PROCEDURES (A) CUT AND REMOVE STRAPPING. (8) REMOVE THE TOP FRAME. n (C) REMOVE THE TOP ROM OF BOMBS. y- 35REF 7 (D) REMOVE THE INTERMEDIATE FRAME, (E) REMOVE THE BOTTOM ROW OF BOMBS. (F) POSITION THE INTERMEDIATE AND TH
16、E TOP FRAMES ON THE BOI I/ SUSPENSION LUG DETAIL DETAIL Q SEE DETAIL A SUSPENSION LM b .L KAT SECTION (SADDLE) . 463/4 REF VIEW B-B REVIEU ACTIVITY: NAVY-AS, OS PREPARING ACTIVITY: NAVY-OS (PROJECT No. 81110-N770) f7U.S. GOVERNMENT PRINTING OFFICE 1988 - 505-033-90669 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1