1、MIL-STD-1323 -320A 3 7777733 0071577 3 = $1 SA4 MILITARY STANDARD M IL-STD-1323 -3 20A UNIT LOAD . (NAVY) 18 HOVEMBER 1988 FOR UNDERWAY REPLENISHMENT SUPERSEDING RETARDER, INFLATABLE, AIR BSU-85/B MIL-STO-1323-320 10 APRIL 1986 IN SHIPPING AND STORAGE CONTAINER, FIN CNU-419/E UNIT LOAD DATA NUi-lBER
2、 OF FINS PER CONTAINER , , ,. I I , , , NUirlBER OF CONTAINERS PER UNIT LOAD ,. I I I GROSS WEIGHT OF ONE CONTAINER I I ,. . Ir I I WEIGHT OF STEEL STRAPPING I ,. ,. . I,. ., I I I MEIGHT OF WOOD DUNNAGE , , , . . . I I ,. . Ir I I I HEIGHT OF PALLET , II,II, , , , , . ,. , , , . ,. I GROSS WEIGHT O
3、F UNIT LOAD , , , , , , , , , , , , , , CUBE , , , , , , , , , , . , , , , , ,.II.II -, I.LI I A DO NOT USE FOR SHILP:HG WEIGHT 1 6 108 LBS 7 ES 9 LBS 9b LBS 758 LBS A E 49.8 CELFT. DO NO STACK MORE THAN 4 UNIT LOADS HIGH IN STORAGE. SHIPPING DISTRIBUTION IS UNLIMITED. PECIFIED DIBENSIOWS ARE IN INC
4、HES. Y STANDARDS, REFER TO INDEX TO STANDA REQUIREMENTS FOR CONSTRU STORAGE AND TRANSFER-AT-SA. IT MAY ALSO BE USED FOR Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PALLETIZING PROCEDURE - M IL-STD-1323-3 20A (NAVY 1 (A) THREAD LONGITUDINAL STRAPP
5、ING. ITEM 2. BETWEEN DECK WIRES OF PALLET, ITEM 1. AS SHOWN IN DETAIL A. PLACE THE CONTAINERS OC PALLET MAKING SURE STACKING PINS ARE IN THE UP POSITION. PLACE PROTECTOR BATTENS. ITEM 5. OM THE COHTAINER END CAPS AS SHOWN. POSITION THE LATERAL STRAPPING. ITEM 3. UNOER THE PALLET DECK BCTWEEI THE PAL
6、LET LEGS. AROUIID THE UNIT LOAD. AND OVER THt PROTECTOR BOARDS TENSION ANO DOUBLE NOTCH SEALS. WILL REST IN SLOTS IN THE Eli0 CAPS. POSITION STRAPPING. ITEIl 2. AROUYD UIJIT LOAD. OVER THE PROTECTOR BOARDS. TENSION AIR) DOUBLE DTCH SEALS. INSTALL STAPLE. ITEM 6. TO PROTECTOR BOARDS ON OUTBOARO LOCAT
7、ION ONLY. SHOWN IN DETAIL B. (BI (Cl (O) THIS STRAPPING (E) (FI ONE STAPLE PER BOARD AS MARKING: IN ADDITION TO ANY SPECI4L MARKING REQUIRED BY CONTRACT OR ORDER. THE UNIT LOAO SHALL RE HARKED IN ACCORDANCE UITH MIL-STO-1323. ace DPALLETIZING PROCEDURE (A) CUT AND REMOVE UNIT LOAD STRAPPING, ITEMS 2
8、 AND 3 ONLY, (BI REMOVE PROTECTOR BOARDS. (Cl RHIOVE CONTAINERS. WIRES. NOTES: 1, UNLESS OTHERWISE SPECIFIED, ALL MATERIALS SHALL BE IN ACCORDANCE WITH MIL-STD-1323, 2. DO NOT USE TYPE I STRAPPING . WITH POWER f.IACHINES LIST OF MATERIALS REVIEW ACTIVITY: NAVY - AS. OS AGE 2 PREPARING ACTIVITY: NAVY - OS (PROJECT NO. 81YO-N789) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1