1、MIL-T-LLlOLlB (1) 47 777770b 0256298 7 C-r-Eq-20 MIL-T-81404B(AS) AMENDMENT 1 31 October 1985 MILITARY SPECIFICATION TEST SET, ELECTRICAL CIRCUIT, GUIDED MISSILE LAUNCHER AND AIRCRAFT, AN/ASM- 149C This amendment forms a part of Military Specification MIL-T-81404B(AS) dated 19 February 1985, and is
2、approved for use within the Naval Air Systems Command, Department of the Navy, and is available for use by all Departments and Agencies of the Department of Defense. Page 1 DD Form 1426 Note: Delete in its entirety and substitute: II Beneficial comments (recommendations, additions, deletions) and an
3、y per.tinent data which may be of use in improving this document should be addressed to: Commanding Officer, Naval Air Engineering Center, Systems Engineering and Standardization. Department (SESD) Code 93, Lakehurst, NJ 08733, by using the self-addressed Standardization Document Improvement Proposa
4、l (DD Form 1426) appearing at the end of this document or by letter. 1 l II Add (bel ow FSC number), “DISTRIBUTION STATEMENT A. Approved for pub1 ic re1 ease; distribution unlimited. Page 4 3.3.1.1, Delete “(see 4.4.1.2)“ and substitute: “(see 4.5.1.2) .I 3.3.2 c., Delete “Radiated above 15 mhz“ and
5、 substitute: “Radiated above 25 mhz“ Page 12 TABLE IV: Delete in its entirety and substitute the attached TABLE IV. Page 16 4.5.3.1, last sentence, delete in its entirety and substitute: reject criteria for Test Plan VI shall be used.“ “The accept- Preparing activity: Navy - AS (Project 4935- NO541
6、. THIS DOCUMENT CONTAINS 2 . -. PAGES. T.s 4935 Page1 of 2 “DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited.“ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Requirements 4.5.3 - II 4.9 Vi sua1 Exami nati on (3.2 through
7、 3.3) Performance Characteri sti cs (3.4, 3.5) Workmanship (3.6, 3.7) Envi ronmental Tests (3.3.4) Warm-up time (3.3.5) .- Interference Control (3.3.2) Re1 iabil ity (3.3.1. i) Maintainability (33.7) MIL-T-81404B (AS) TABLE IV. Inspection requirements I. First Article Inspection 4.5.1.1 4.5.1.2 4.5.
8、1.3 4.7 4.8 4.6 4.5.1.2 II. Quality Conformance Inspection Individual Sampling Special Life 4.5.1.1 4.5.1.1 4.5.1.1 4.5.1.1 4.5.1.2 4.5.1.2 4.5.1.2 4.5.1.2 4.5.1.3 4.5.1.3 - 4.5.1.3 4.5.1.3 See 4.5.6.2 and 4.5.6.3 I/ Additional individual tests may be requested by the procuring activity (see 4.5.1).
9、 2J Sampling tests to be performed will be determined by the procuring activity based on first article and individual test results (see 4.5.2.1). 3J Special tests to be performed will be determined by the procuring activity (see 4.5.4.2). II 12 Page 2 of 2 i- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1