1、*USACE / NAVFAC / AFCESA / NASA UFGS-00 01 15 (February 2011)-Preparing Activity: NAVFAC SupersedingUFGS-00 01 15 (January 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION TABLE OF CONTENTSDIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTSSECTION 00 01 15LIST OF DRAWINGS02/11PART 1 GENERAL1.
2、1 SUMMARY1.2 CONTRACT DRAWINGS1.3 SUPPLEMENTARY DRAWINGS1.3.1 Reference Drawings1.3.2 Boring Logs1.3.3 Subsurface Data- End of Section Table of Contents -DOCUMENT 00 01 15 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA
3、 / NASA UFGS-00 01 15 (February 2011)-Preparing Activity: NAVFAC SupersedingUFGS-00 01 15 (January 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION 00 01 15LIST OF DRAWINGS02/11*NOTE: This guide specification covers the requirements for lists the drawings for the project.Edit this guide specific
4、ation for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recom
5、mended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).Criteria Change Request (CCR).*NOTE: Contracts personnel will insert this section in the appropriate location within the solicitation package. Include this section with the other SpecsI
6、ntact Source Document Files provided as part of the project Electronic Design Deliverables package.*NOTE: For NAVFAC Southeast projects, the A/E shall prepare this section for each project, but it is notto be listed in the Table of Contents of the specifications. NAVFAC Southeast will insert this se
7、ction in the appropriate location within the solicitation package. A/E shall also include this section with the SPECSINTACT electronic source files required.“*DOCUMENT 00 01 15 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 1 GENERAL1.1 S
8、UMMARYThis section lists the drawings for the project pursuant to contract clause “DFARS 252.236-7001, Contract Drawings, Maps and Specifications.“1.2 CONTRACT DRAWINGS*NOTE: Use revision column only if drawings show a revision date. List the 7-digit NAVFAC drawing number in the third column.*Contra
9、ct drawings are as follows:DRAWING REVISION NAVFAC TITLENO. NO. DWG NO._ _ _ _1.3 SUPPLEMENTARY DRAWINGSThese supplementary drawings may not be a part of the contract but are included with the drawings for information.1.3.1 Reference Drawings*NOTE: Use only when reference drawings must be included i
10、n the project.*The following reference drawings is are intended only to show the original construction. Drawings is are the property of the Government and shall not be used for any purpose other than that intended by the contract. The drawings is are half full size. Full-size drawings are available
11、at the bidders or Contractors expense. Information on procuring these full-size drawings may be obtained from the Contracting Officer. Full size drawings may be inspected during regular working hours at the office of the Contracting Officer. the station.NAVFAC DRAWING NO. TITLE_ _1.3.2 Boring Logs*N
12、OTE: Select this paragraph or the paragraph below entitled “Subsurface Data,“ if the boring logs and subsurface information are not already incorporated in the drawings. Use the first paragraph if boring logs are available and the second, if they are incorporated into a soils report or if only a soi
13、ls report is available.*DOCUMENT 00 01 15 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*NOTE: Do not use this paragraph for NAVFAC Southeast contracts.*The Government does not guarantee that borings indicate actual conditions, except for the
14、 exact locations and the time that they were made. Subsurface data, not specified or indicated, have been obtained by the Government at this station. The data are available for examination by prospective bidders in the office of the Contracting Officer at the station.1.3.3 Subsurface Data*NOTE: Do n
15、ot use this paragraph for NAVFAC Southeast contracts.*Subsurface data, not specified or indicated, have been obtained by the Government at the station. The data are available for examination by prospective bidders in the office of the Contracting Officer at the station. The soils report is included as part of the solicitation. - End of Document -DOCUMENT 00 01 15 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-