1、*USACE / NAVFAC / AFCESA /NASA UFGS-01 33 29 (May 2012)-Preparing Activity: NAVFAC SUPERSEDINGUFGS-01 33 29 (February 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2012*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 33 29LEED(TM)
2、 DOCUMENTATION05/12PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 DESCRIPTION1.3.1 Credit Validation1.3.2 Contractor Responsibilities1.4 LEED IMPLEMENTATION PLAN1.5 LEED DOCUMENTATION NOTEBOOK1.5.1 Content1.5.2 LEED Calculations1.5.3 Submittals1.6 REQUIREMENTS1.6.1 Materials and Resources Credit 3, M
3、aterials Reuse1.6.2 Materials and Resources Credit 4, Recycled Content1.6.2.1 Calculations1.6.2.2 Substitutions1.6.3 Materials and Resources Credit 5, Regional Materials1.6.3.1 Calculations1.6.4 Materials and Resources Credit 6, Rapidly Renewable Materials1.6.5 Materials and Resources Credit 7, Cert
4、ified Wood1.6.5.1 CalculationsPART 2 PRODUCTSPART 3 EXECUTION3.1 COORDINATION MEETINGS3.2 TABLE- End of Section Table of Contents -SECTION 01 33 29 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA /NASA UFGS-01 33 29 (Ma
5、y 2012)-Preparing Activity: NAVFAC SUPERSEDINGUFGS-01 33 29 (February 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2012*SECTION 01 33 29LEED(TM) DOCUMENTATION05/12*NOTE: This guide specification covers the requirements for providing documentation and
6、obtaining certain credits to acquire LEED(tm) or equivalent certification. Include this section in all Army construction projects requiring LEED. If project is not registered under LEED, equivalent green building systems may be used; modify title of section and content accordingly.Adhere to UFC 1-30
7、0-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable ite
8、ms(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).UFGS a
9、re intended for design-bid-build contracts; for design-build projects UFGS may require extensive editing by the designer. Navy design-build projects shall use NAVFAC Design-Build Master at www.wbdg.org/ndbm.*PART 1 GENERAL1.1 REFERENCES*NOTE: Issue (date) of references included in project specificat
10、ions need not be more current than provided by the latest guide specification. Use of SECTION 01 33 29 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-SpecsIntact automated reference checking is recommended for projects based on older guide spe
11、cifications.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.FOREST STEWARDSHIP COUNCIL (FSC)FSC STD 01 001 (2000) Principles and Criteria for Forest StewardshipU.S. GREEN BUILDIN
12、G COUNCIL (USGBC)LEED (2002; R 2005) Leadership in Energy and Environmental Design(tm) Green Building Rating System for New Construction (LEED-NC)LEED GBDC (2009) LEED Reference Guide for Green Building Design and ConstructionLEED NC (2009) Leadership in Energy and Environmental Design(tm) New Const
13、ruction Rating System1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project.The Guide Specification technical editors have designated those items that require Gove
14、rnment approval, due to their complexity or criticality, with a “G“. Generally, other submittal items can be reviewed by the Contractors Quality Control System. Only add a “G” to an item, if the submittal is sufficiently important or complex in context of the project.For submittals requiring Governm
15、ent approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engi
16、neering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy projects.Submittal items not designated with a “G“ are SECTION 01 33 29 Page 3Provided by IHSNot for Re
17、saleNo reproduction or networking permitted without license from IHS-,-,-considered as being for information only for Army projects and for Contractor Quality Control approval for Navy projects.*NOTE: Identify all requirements throughout the technical sections with the marking “LEED.“ This will gene
18、rally be within the submittal requirements of the technical section; however, the products part or the execution part may also require some notation to differentiate those pieces of equipment/products/activities out of many listed that relate to LEED. Where additional data is required to validate a
19、LEED point (i.e., VOC content of paint), an additional submittal requirement will need to be included in the technical section.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information o
20、nly. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-01 Preconstruction SubmittalsLEED Implementation Plan; G; G, _SD-11 Closeo
21、ut SubmittalsLEED Documentation Notebook; G; G, _1.3 DESCRIPTION*NOTE: This specification includes an overview of all required LEED credits, LEED documentation requirements, and technical requirements for LEED credits not specified elsewhere. Where the term “LEED credit“ is used, it refers to both L
22、EED credits and LEED prerequisites. If a project is not registered under LEED, designer may allow equivalent green building systems, choose the bracketed item allowing equivalent systems, and modify section.*NOTE: DoD projects may only be certified up to Silver or equivalent without cost-benefit ana
23、lysis and other restrictions required by FY 2012 National Defense Authorization Act (NDAA). This certification restriction does not apply to NASA projects.*This project has been designed for, and shall be developed for a sustainable rating of certified silver _ in accordance with SECTION 01 33 29 Pa
24、ge 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-LEED NC Version _ or equivalent green building system approved by the Contracting Officer. Table 1 (see paragraph Table) identifies the LEED NC credit items that are designed into or otherwise requi
25、red for this project. No variations or substitutions to the LEED NC credits identified for this contract shall be allowed without written consent from the Contracting Officer. Should there be a case where there is any problem meeting the full requirements of a LEED NC credit identified for this proj
26、ect in Table 1, the Contractor must bring this to the attention of the Contracting Officer immediately.1.3.1 Credit Validation*NOTE: Select second bracketed option if project is seeking USGBC certification. Edit as needed to reflect how project is structured regarding responsibility for USGBC regist
27、ration and registration fees and inclusion of a LEED consultant during construction phase.*This project will not be registered with USGBC or equivalent green building system, for validation of credits earned. Validation of credits earned will be accomplished by the Government. Content of all constru
28、ction documentation must be in accordance with the LEED GBDC requirements for supporting data required and must use LEED Letter Templates, which shall be provided by the Governmentobtained by Contractor at Contractors expense. Design phase LEED documentation will be provided separately by others.Thi
29、s project will be registered with USGBC for validation of credits earned. Contractor is not responsible for registering the project with USGBC or for paying project registration fees to USGBC. Format and content of all construction documentation must be in accordance with the LEED GBDC requirements
30、for supporting data required in event of USGBC audit of the particular credit. Contractor is required to coordinate through the Contracting Officer with Governments LEED NC consultantAdministrative Assistant on assuring assembled data is acceptable to USGBC and responding to USGBC requests for addit
31、ional construction data in the course of seeking project certification. Design documentation will be provided by others.1.3.2 Contractor ResponsibilitiesSome LEED NC credits are inherent in the design provided and require no further submittal or documentation. For these credits, the Contractor notif
32、y the Contracting Officer in advance of selection of any specified material or use of any permissible construction methods that may result in a deviation from the LEED designer intent. Some LEED NC credits involve material selection and are generally identified within the technical sections with the
33、 notation “LEED NC,“ though not specifically identified in all occurrences. Some LEED NC credits are dependent on construction practices.All LEED credits identified in Table 1 not inherent in the design provided shall be documented by the Contractor. Table 1 provides a general summary of applicable
34、credits. Detailed submittal requirements are contained in the LEED GBDC and in the technical sections.In all cases where a material, product, or execution requirement is SECTION 01 33 29 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-identifie
35、d by “LEED NC“ in the contract documents, additional data or certificates shall be submitted with the individual component or process validating the material or component to the respective LEED NC credit item. These additional data or certificates shall be separable from the other submitted data and
36、 a copy shall be included in the LEED NC Documentation Notebook in addition to the distribution indicated in the submittal register.1.4 LEED IMPLEMENTATION PLAN*NOTE: Army projects shall require a LEED Accredited Professional to compile LEED documentation.*LEED NC Implementation Plan shall be submit
37、ted within 30_ days after notice to proceed. The plan, when completed, shall provide a detailed description of all activities that relate to accomplishing project LEED NC requirements, including construction practices, procurement practices, and proposed submittals and documentation for each LEED NC
38、 credit. Plan shall also include the following:a. Name of individuals on the Contractors staff responsible for ensuring LEED NC credits and prerequisites are earned and responsible for assembling documentation. A responsible individual LEED NC Accredited Professional shall be identified for each app
39、licable credit. This individual may fill the role of QC Administrative Assistant specified in Section 01 45 00.00 20 QUALITY CONTROL.b. Copy of proposed contract with Commissioning Agent.c. Templates to be used for tracking LEED NC credits. Listing of documents to be provided for each credit and sch
40、edule for their inclusion in LEED Documentation Notebook. Include proposed materials, associated estimated costs, and details necessary for LEED NC calculations in order to determine if the listed materials can be expected to achieve the project goal.d. List of all plans required in the technical se
41、ctions for LEED NC credit. Proposed submittal date for each plan. These shall be added to the LEED NC Implementation Plan as they are completed.e. Implementation plan for cumulative materials credits, which shall use applicable template with proposed materials, associated estimated costs, and detail
42、s necessary for LEED NC Calculations added in order to determine if the listed materials can be expected to achieve the project goal. Submit cumulative materials implementation plans before materials purchasing begins.1.5 LEED DOCUMENTATION NOTEBOOKThe Contractor shall prepare a comprehensive notebo
43、ok documenting compliance for each LEED NC credit identified in Table 1. LEED NC Documentation Notebook shall be formatted to match LEED NC numbering system and tabbed for each credit and prerequisite. LEED NC documentation in notebook shall contain up to date information through the previous weeks months work, and at least one set shall be available on the jobsite at all times. The Notebook may be maintained and available for SECTION 01 33 29 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-refer