1、*USACE / NAVFAC / AFCESA / NASA UFGS-10 22 26.23 (August 2010)-Preparing Activity: NAVFAC SupersedingUFGS-10 22 26.23 (October 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSDIVISION 10 - SPECIALTIESSECTION 10 22 26.23COILI
2、NG PARTITIONS08/10PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 PRE-INSTALLATION REQUIREMENTS1.3.1 Preconstruction Requirements1.3.2 Product Data1.3.3 Manufacturers Guarantee1.4 SUSTAINABLE DESIGN CERTIFICATION1.5 DELIVERY, HANDLING AND STORAGEPART 2 PRODUCTS2.1 COILING PARTITIONS2.2 MATERIALS2.2.1
3、Aluminum Extrusions2.2.2 Steel Sheets2.2.3 Fabric Covering2.2.4 Seals and Sweepstrips2.2.5 Ceiling Guards2.3 PERFORMANCE REQUIREMENTS2.3.1 Fire Endurance2.3.2 Laboratory Acoustical Requirements2.4 ELECTRICAL OPERATORS2.5 FABRICATION2.5.1 Framework2.5.2 Suspension System2.5.3 Covering2.5.4 Sound Insu
4、lation2.5.5 Air Release2.5.6 Seals2.5.7 Hardware2.5.8 AccessoriesPART 3 EXECUTIONSECTION 10 22 26.23 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1 INSTALLATION3.1.1 Existing Work3.1.2 Electrical Operators3.1.3 Adjustment3.2 FIELD TESTS3.2
5、.1 Operational Test3.2.2 Visual Test3.2.3 Acoustical Test3.3 CLEANING3.4 SUPPORT SERVICE- End of Section Table of Contents -SECTION 10 22 26.23 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-10 22 26.23 (Au
6、gust 2010)-Preparing Activity: NAVFAC SupersedingUFGS-10 22 26.23 (October 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION 10 22 26.23COILING PARTITIONS08/10*NOTE: This guide specification covers the requirements for coiling partitions, manu
7、ally and/or electrically operated.Coiling partitions are partitions with independent covers enclosing a dead-air space and separated by an internal mechanism operating laterally across the face of the opening to a coiled closed position.Coiling partitions may be a sight barrier (noninsulated), or so
8、und barrier (with sound liner), or both. Coiling partitions have fabric or metal panel covers which are joined to reflect a pantographic movement of the door surfaces when the door is either manually or electrically operated.This section does not include folding or operable walls and partitions whos
9、e rigid panels are individually moved or hinged along their vertical edges to fold in serpentine fashion.Associated work found in other sections includes:Steel supporting members or hanger rods, Section 05 50 13 MISCELLANEOUS METAL FABRICATIONSSection 05 51 33 METAL LADDERSSection 05 52 00 METAL RAI
10、LINGSSection 05 51 00 METAL STAIRS.Wood blocking, rough bucks, and headers, Section 06 10 00 ROUGH CARPENTRY.Wood trim, wood or hardboard ceiling guard, or soffits, Section 06 20 00 FINISH CARPENTRY.Lock cylinders, Section 08 71 00 DOOR HARDWARE.Operator field connections to power sources and inner
11、connection to control switches, Division 16, “Electrical.“SECTION 10 22 26.23 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed i
12、tems, choose applicable item(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the spec
13、ification. A listing of Technical Proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*NOTE: The following information should be shown on the drawings:1. Location, size, and
14、 coiling area of coiling partitions.2. Direction of operation, header conditions indicating height, track anchorage, track channel, and jamb conditions.3. Partition supporting structure. The structural support for the partition is not part of this section; it must be indicated and specified separate
15、ly.4. A schedule of partitions by type, sizes, and stack space and identified by mark number or letter5. For electrically operated partitions, show power source and desired switch location.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the gu
16、ide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place t
17、he reference in the Reference Article. Also use the SECTION 10 22 26.23 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be de
18、leted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INT
19、ERNATIONAL (ASTM)ASTM A 653/A 653M (2009a) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip ProcessASTM B 221 (2008) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and TubesASTM B 221
20、M (2007) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)ASTM C 423 (2009a) Sound Absorption and Sound Absorption Coefficients by the Reverberation Room MethodASTM D 751 (2006) Coated FabricsASTM E 336 (2009) Measurement of Airborne Sound
21、 Insulation in BuildingsASTM E 413 (2004) Rating Sound InsulationASTM E 557 (2000; R 2006) Installation of Operable PartitionsASTM E 84 (2010) Standard Test Method for Surface Burning Characteristics of Building MaterialsASTM E 90 (2009) Standard Test Method for Laboratory Measurement of Airborne So
22、und Transmission Loss of Building Partitions and ElementsCHEMICAL FABRICS TIA 09-1; TIA 09-2) Life Safety CodeNFPA 286 (2006) Standard Methods of Fire Tests for Evaluating Contribution of Wall and Ceiling Interior Finish to Room Fire GrowthNFPA 70 (2008; TIA 08-1) National Electrical CodeSCIENTIFIC
23、CERTIFICATION SYSTEMS (SCS)SCS Scientific Certification Systems (SCS)Indoor AdvantageUNDERWRITERS LABORATORIES (UL)UL 10B (2008; R thru 2009) Fire Tests of Door Assemblies1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the followin
24、g list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an exi
25、sting “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three chara
26、cters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Off
27、ice); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Gover
28、nment approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the SECTION 10 22 26.23 Page 6Provided by IHSNot for ResaleNo reproduction or networking perm
29、itted without license from IHS-,-,-“G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-01 Preconstruction SubmittalsManufacturers Qualifications; G; G, _Manufacturers Sam
30、ple WarrantyStatement of Code Compliance; G; G, _Statement of Standards Conformity; G; G, _Verification of Field Measurements; G; G, _ Existing Electrical DataSD-02 Shop DrawingsSubmit Fabrication Drawings for coiling Partitions consisting of fabrication and assembly details to be performed in the f
31、actory.Submit Installation Drawings for the following items in accordance with paragraph entitled, “Installation,“ of this section.coiling Partition Layouts; G; G, _Suspension System; G; G, _Finish Hardware; G; G, _Jamb Panels; G; G, _Accessories; G; G, _ Electrical Operators; G; G, _ Wiring diagram
32、s; G; G, _Submit drawings for the system that include dimensions and weight of stacked partition, layout of the work including stacking area, track and jamb fastening methods, seal details, and installation details. Submit wiring diagram and installation details for electrical operator.SD-03 Product
33、 DataFrameworkSuspension systemFinish HardwareSound Seals and SweepstripsCoveringSECTION 10 22 26.23 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Ceiling GuardMeeting PostsJamb PanelsRolling PostPull-In Latch Electrical Operator SwitchesCert
34、ificationSD-04 SamplesCovering; G; G, _SD-06 Test ReportsLaboratory Acoustical RequirementsAcoustical testSD-07 CertificatesSubmit Certificates to the Contracting Officer for this installation clearly indicating:Statement of Code Compliance; G; G, _Statement of Standards Conformity; G; G, _SD-10 Ope
35、ration and Maintenance DataCoiling partitions, Data Package 1; ; G; G, _ Electrical operators, Data Package 5; ; G; G, _Submit in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA.SD-11 Closeout SubmittalsManufacturers Guarantee1.3 PRE-INSTALLATION REQUIREMENTS1.3.1 Preconstruction Req
36、uirementsNo less than 30 calendar days prior to the scheduled commencement of installation of coiling Partitions, submit the following to the Contracting Officer:Manufacturers QualificationsManufacturers Sample WarrantySECTION 10 22 26.23 Page 8Provided by IHSNot for ResaleNo reproduction or network
37、ing permitted without license from IHS-,-,-Statement of Code ComplianceStatement of Standards ConformityVerification of Field Measurementsand Existing Electrical DataFabrication Drawings and Installation Drawings1.3.2 Product DataSubmit the following information for review:Finish HardwareJamb Panels
38、 and AccessoriesSound Seals and SweepstripsCeiling GuardMeeting Posts Rolling PostPull-In Latch Electrical Operator Switches1.3.3 Manufacturers GuaranteeProvide Manufacturers Guarantee for partitions against defects in material and workmanship for a period of two years from date of installation. In
39、addition, provide ten year guarantee for the pantographs, trolleys and tracks from date of acceptance for beneficial use.1.4 SUSTAINABLE DESIGN CERTIFICATIONProduct shall be third party certified by GEI Greenguard Indoor Air Quality Certified, SCS Scientific Certification Systems Indoor Advantage or
40、 equal. Certification shall be performed annually and shall be current.1.5 DELIVERY, HANDLING AND STORAGEDeliver materials to project site in manufacturers original, unopened, and undamaged packages with labels legible and intact. Labels must indicate the manufacturer, brand name, size, finish, and
41、placement location. Store coiling partitions and accessories in unopened packages in a manner that will prevent damage. Handle partition materials in accordance with manufacturers instructions.PART 2 PRODUCTS2.1 COILING PARTITIONSProvide full coiling type partitions, factory finished, supported from
42、 overhead track without floor guides, and complete with all hardware, track, SECTION 10 22 26.23 Page 9Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-and accessories necessary for operation. Provide partition framework with a mechanism that gives st
43、ability and maintains uniform spacing of partition folds in all partition positions. Provide completely concealed framework with a vinyl-coated fabric covering_. Provide partitions manually and electrically operated, bi-parting and one-way type as indicated. Provide patterns and colors of fabric_ ap
44、proved by the Contracting Officer as indicated . Provide manufacturers standard pendant pull on leading edge of manually operated partitions over 3600 mm 12 feet high.2.2 MATERIALS2.2.1 Aluminum ExtrusionsASTM B 221M ASTM B 221, Alloy 3003.2.2.2 Steel SheetsASTM A 653/A 653M, Z 180 G90 coating designation.2.2.3 Fabric Covering*NOTE: Specify minimum total weight and minimum coating weight for the fabric covering type selected using the listing below:Total Weight (kilograms per square meter): Type I - 0.237; Type
copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1