GA 221-2000_en Repair of Gypsum Board Joint Ridging《石膏板联合起垄的修复》.pdf

上传人:ideacase155 文档编号:1228953 上传时间:2019-08-11 格式:PDF 页数:2 大小:217.55KB
下载 相关 举报
GA 221-2000_en  Repair of Gypsum Board Joint Ridging《石膏板联合起垄的修复》.pdf_第1页
第1页 / 共2页
GA 221-2000_en  Repair of Gypsum Board Joint Ridging《石膏板联合起垄的修复》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Printed in U.S.A. Copyright Gypsum Association 2000. All rights reserved.GYPSUM ASSOCIATION810 FIRST STREET NE, #510 WASHINGTON, DC 20002REPAIR OF GYPSUM BOARDJOINT RIDGING(GA-221-2000)Joint ridging, also called beading, is auniform, fine line deformation occurring atgypsum board joints. It is usual

2、ly caused bycompression of the edges or ends of the finishedand decorated gypsum board resulting from theedges or ends being forced together fromexposure to alternating periods of high and lowtemperature and humidity extremes due tothermal or hygrometric expansion.In order to permit the gypsum board

3、 systemto stabilize, it is recommended that repairs notbegin until the affected building has gonethrough at least one complete heating/coolingcycle. Repairs should only be undertaken in awarm, dry environment.Lightly sand the ridge down taking care notto damage the embedded joint reinforcing tape.Ty

4、pical Joint Before RidgingTypical Joint After RidgingTypical Ridging at Taper-to-Butt JointFill the surface over the joint with topping orall purpose compound, feathering as wide asnecessary to create an essentially flat surface.Allow compound to dry for at least 24 hoursbefore proceeding. After the

5、 compound is dry, itmay be lightly sanded to feather the edges andremove any remaining trowel marks. Examinethe sanded joint to determine whether or not theridge has been eliminated. If the examinationindicates that the ridge has not been adequatelyconcealed, additional feathering coats of jointcomp

6、ound may be required. Allow each coat ofjoint compound to dry at least 24 hours beforesanding.The repaired joint should be painted with acoat of drywall primer and allowed to drythoroughly prior to the application of finaldecoration.Typical Ridge From Misaligned FramingMEMBER COMPANY LIST2001AMERICA

7、N GYPSUMBPB AMERICA, INCCONTINENTAL GYPSUM COMPANYG-P GYPSUM CORPORATIONJAMES HARDIE GYPSUMLAFARGE GYPSUMNATIONAL GYPSUM COMPANYPABCO GYPSUMA Division of Pacific Coast Building Products, Inc.TEMPLE-INLAND FOREST PRODUCTS CORPORATIONUNITED STATES GYPSUM COMPANYWESTROC INC.GYPSUM ASSOCIATION810 First Street NE, #510Washington, DC 20002202-289-5440Fax: 202-289-3707www.gypsum.org

展开阅读全文
相关资源
猜你喜欢
  • NAVY MIL-STD-1322-197-1969 PALLETIZING DOMESTIC UNIT LOAD DESTRUCTOR MODIFICATION KIT MK 75 (IN SMALL ARMS AMMUNITION BOX MK 1)《MK1轻武器弹药箱装MK75型爆炸装置成套改装器材的装载》.pdf NAVY MIL-STD-1322-197-1969 PALLETIZING DOMESTIC UNIT LOAD DESTRUCTOR MODIFICATION KIT MK 75 (IN SMALL ARMS AMMUNITION BOX MK 1)《MK1轻武器弹药箱装MK75型爆炸装置成套改装器材的装载》.pdf
  • NAVY MIL-STD-1322-2-1969 PALLETIZING DOMESTIC UNIT LOAD SPARROW III AAM-N-6-6A - IGNITER MK 172 MOD 0 - INERT (IN WOOD BOX)《集装运载国内集装麻雀III AAM-N-6-6A的MK 172 MOD 0型惯性点火器(置于木箱内)》.pdf NAVY MIL-STD-1322-2-1969 PALLETIZING DOMESTIC UNIT LOAD SPARROW III AAM-N-6-6A - IGNITER MK 172 MOD 0 - INERT (IN WOOD BOX)《集装运载国内集装麻雀III AAM-N-6-6A的MK 172 MOD 0型惯性点火器(置于木箱内)》.pdf
  • NAVY MIL-STD-1322-20-1969 PALLETIZING DOMESTIC UNIT LOAD AMMONIUM PERCHLORATE (IN 30 GAL STEEL DRUM)《集装运载国内集装高氯酸铵(置于容积为30加仑的铁桶内)》.pdf NAVY MIL-STD-1322-20-1969 PALLETIZING DOMESTIC UNIT LOAD AMMONIUM PERCHLORATE (IN 30 GAL STEEL DRUM)《集装运载国内集装高氯酸铵(置于容积为30加仑的铁桶内)》.pdf
  • NAVY MIL-STD-1322-23-1969 PALLETIZING DOMESTIC UNIT LOAD COLOR BURST UNIT MK 2 MOD 0 (IN CONTAINER MK1 MOD 1)《集装运载国内色同步MK 2 MOD 0(置于木箱内)》.pdf NAVY MIL-STD-1322-23-1969 PALLETIZING DOMESTIC UNIT LOAD COLOR BURST UNIT MK 2 MOD 0 (IN CONTAINER MK1 MOD 1)《集装运载国内色同步MK 2 MOD 0(置于木箱内)》.pdf
  • NAVY MIL-STD-1322-24-1969 PALLETIZING DOMESTIC UNIT LOAD 2 75 ROCKET MOTOR MK 1 2 AND MODS (IN CONTAINER MK 15 MOD 0)《集装运载国内LOAD 2》.pdf NAVY MIL-STD-1322-24-1969 PALLETIZING DOMESTIC UNIT LOAD 2 75 ROCKET MOTOR MK 1 2 AND MODS (IN CONTAINER MK 15 MOD 0)《集装运载国内LOAD 2》.pdf
  • NAVY MIL-STD-1322-26-1969 PALLETIZING DOMESTIC UNIT LOAD 20 MM AIRCRAFT AND SMALL ARMS AMMUNITION (IN SMALL ARMS AMMO BOX MK 1 MOD 0)《集装运载国内20MM轻武器弹药(置于木箱MK 1 MOD 0内)》.pdf NAVY MIL-STD-1322-26-1969 PALLETIZING DOMESTIC UNIT LOAD 20 MM AIRCRAFT AND SMALL ARMS AMMUNITION (IN SMALL ARMS AMMO BOX MK 1 MOD 0)《集装运载国内20MM轻武器弹药(置于木箱MK 1 MOD 0内)》.pdf
  • NAVY MIL-STD-1322-27-1969 PALLETIZING DOMESTIC UNIT LOAD SMALL ARMS AMMUNITION (IN SMALL ARMS AMMO BOX MK 1 MOD 0)《集装运载国内轻武器弹药(置于木箱MK 1 MOD 0内)》.pdf NAVY MIL-STD-1322-27-1969 PALLETIZING DOMESTIC UNIT LOAD SMALL ARMS AMMUNITION (IN SMALL ARMS AMMO BOX MK 1 MOD 0)《集装运载国内轻武器弹药(置于木箱MK 1 MOD 0内)》.pdf
  • NAVY MIL-STD-1322-28-1969 PALLETIZING DOMESTIC UNIT LOAD SMALL ARMS AMMUNITION (IN SMALL AMMO BOX MK 1 MOD 0)《集装运载国内轻武器弹药(置于木箱MK 1 MOD 0内)》.pdf NAVY MIL-STD-1322-28-1969 PALLETIZING DOMESTIC UNIT LOAD SMALL ARMS AMMUNITION (IN SMALL AMMO BOX MK 1 MOD 0)《集装运载国内轻武器弹药(置于木箱MK 1 MOD 0内)》.pdf
  • NAVY MIL-STD-1322-29-1969 PALLETIZING DOMESTIC UNIT LOAD SMALL ARMS AMMUNITION (IN SMALL ARMS AMMO BOX MK 1 MOD 0)《集装运载国内轻武器弹药(置于木箱MK 1 MOD 0内)》.pdf NAVY MIL-STD-1322-29-1969 PALLETIZING DOMESTIC UNIT LOAD SMALL ARMS AMMUNITION (IN SMALL ARMS AMMO BOX MK 1 MOD 0)《集装运载国内轻武器弹药(置于木箱MK 1 MOD 0内)》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 行业标准 > GA公共安全

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1