ACI 350.2R ERTA-2009 Concrete Structures for Containment of Hazardous Materials《危险材料密封用混凝土结构》.pdf

上传人:syndromehi216 文档编号:401224 上传时间:2018-10-28 格式:PDF 页数:1 大小:36.69KB
下载 相关 举报
ACI 350.2R ERTA-2009 Concrete Structures for Containment of Hazardous Materials《危险材料密封用混凝土结构》.pdf_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ERRATA as of July 23rd, 2009 ACI 350.2R-04 Concrete Structures for Containment of Hazardous Materials 1stprinting Reported by ACI Committee 350 Table 2.1, page 3, revised as: Last revised 07-23-09, 7:35 a.m. Table 2.1Wall thickness and reinforcement locations based on concrete placement considerati

2、on Description Wall height Minimum thickness Reinforcement location Cast-in-place concrete Over 10 ft (3000 mm) 12 in. (300 mm) Both faces 4 to 10 ft (1200 to 3000 mm) 10 in. (250 mm) Both faces Less than 4 ft (1200 mm) 6 in. (150 mm) Center of wall Precast concrete 4 ft (1200 mm) or more 8 in. (200

3、 mm) Center of wall Less than 4 ft (1200 mm) 4 in. (100 mm) Center of wall Description Minimum wall thickness Tendon prestressed concrete tanks See ACI 350 Wrapped prestressed concrete tanks See ACI 350 Note: Placement windows (temporary openings in the forms) or tremies are recommended to facilitate concrete placement in cast-in-place walls greater than 6 ft (1800 mm) in height.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1