1、1 DATA ITEM DESCRIPTION Title: System/Software Integration Laboratory (SIL) Development & Management Plan Number: DI-SESS-81770 Approval Date: 20090518 AMSC Number: F9069 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Preparing Activity: 11 (ASC/836 AESG/SYE) Applicable Forms: Use/relati
2、onship: The System/Software Integration Laboratory (SIL) Development & Management Plan describes the contractors proposed processes for developing, implementing, and maintaining a SIL that will be used to support integration of aircraft subsystems, to conduct laboratory development testing that lead
3、s to aircraft ground testing, and to aid accident investigations. This plan will provide critical insight into the contractors ability to develop, implement, and sustain such a system/software integration laboratory during the life-cycle of the aircraft. The SIL Development & Management Plan also su
4、pports military aircraft system development, aircraft testing requirements, and quick-reaction mishap investigations. This Data item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated i
5、n the contract. Requirements: 1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as cited in the contract. DoDI 8510.01, DoD Information Assurance Certification and Accred
6、itation Process (DIACAP) is viewable online at: http:/www.dtic.mil/whs/directives/corres/pdf/851001p.pdf or can be ordered from DTIC Northwestern Regional Office at Boston, ATTN: DTIC_BRNB, Building1103, 5 Wright Street, Hanscom AFB, MA 01731-3012. 2. Format. Contractor-specified format is acceptabl
7、e. 3. Content. The SIL Development & Management Plan shall describe the contractors process for developing and implementing a SIL by outlining its overall laboratory structure and organization, company lab-related processes & procedures, security infrastructure, scheduling, and resource support. The
8、 SIL Development & Management Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DI-SESS-81770 2 Plan shall also include the description of SIL use, and the description of the plan for SIL maintenance. 3.1. The SIL development and implementation descrip
9、tion shall include: a) Processes used to plan, develop, and implement a high-fidelity SIL. b) Management concepts related to systems development and integration laboratories. c) Processes for integrating contractors system/software development laboratory operations with the SIL. d) Processes for int
10、egrating subcontractor/supplier software development laboratory operations into the SIL. e) Processes to maintain configuration control within the SIL. f) Processes/procedures used to ensure availability of qualified staff for the SIL that ensure minimal disruption of SIL operations. Include educati
11、on, experience, and security clearance requirements for personnel assigned to the SIL. g) Standard security procedures proposed to protect government-furnished and contractor-developed classified materials that will be used in the SIL. Include processes used to ensure the SIL complies with applicabl
12、e information assurance requirements (i.e., IA controls) as tailored from DoDI 8510.01. h) Processes for scheduling the SIL that maximize utilization of this laboratory asset. 3.2. The SIL use description shall include the following: a) Planned uses of the SIL in areas of aircraft system/subsystem d
13、evelopment, integration, and testing. b) Procedures for evaluating software product reuse or commercial off-the-shelf software packages that are candidates for inclusion in the aircraft system. c) Proposed procedures to support quick-reaction mishap investigations. d) Procedures to provide Level 1 t
14、raining, as required. 3.3. The SIL maintenance plan description shall include: a) Planned SIL-specific component maintenance and support processes/procedures that ensure high levels of availability for the SIL. b) Processes for maintaining SIL concurrency with all aircraft version configurations wit
15、hin the Air Force (AF) inventory to include capability for handling aircraft software block updates and ensuring backwards compatibility. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DI-SESS-81770 3 c) Processes/procedures proposed for the SIL tha
16、t will be used to maintain the software components making up the laboratory. Describe how routine software updates (operating system upgrades, virus definitions and algorithms, etc.) will be installed and tested to ensure minimal SIL operations disruptions. d) Processes/procedures proposed for the S
17、IL that will be used to maintain the hardware components making up the laboratory. Describe how preventive maintenance will be performed, and if there is a hardware failure, procedures to repair the defective part(s) to minimize SIL operations disruptions. 4. End of DI-SESS-81770. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-