1、Page 1 of 2 2017 ASHRAE. All rights reserved. ERRATA SHEET FOR ANSI/ASHRAE/USGBC/IES STANDARD 189.1-2014 Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings March 23, 2017 The corrections listed in this errata sheet apply to ANSI/ASHRAE/USGBC/IES Standar
2、d 189.1-2014. The first printing is identified on the outside back cover as “Product code: 86606 12/14” and the second printing as “Product code: 86606 9/15” Includes errata dated March 23, 2015. The shaded items have been added since the previously published errata sheet dated March 23, 2015 was di
3、stributed. Items marked with an asterisk “*” apply to the first printing only and have already been incorporated into the second printing. NOTICE: ASHRAE now has a list server for Standing Standard Project Committee 189.1 (SSPC 189.1). Interested parties can now subscribe and unsubscribe to the list
4、 server and be automatically notified via e-mail when activities and information related to the Standard is available. To sign up for the list server please visit Project Committee List Servers for Standard on the Technology / Standards section of the ASHRAE website at http:/www.ashrae.org/standards
5、-research-technology/standards-guidelines/standards-activities/project-committee-list-servers. Page(s) Erratum Cover In the first paragraph on the front cover of the standard change “Illuminating Engineering Society of North America” to “Illuminating Engineering Society”. 12 3.3 Abbreviations. Chang
6、e IES from “Illuminating Engineering Society of North America” to “Illuminating Engineering Society”. 13* 5.3.3.2 Greenfield Sites. Section 5.3.3.2 was inadvertently omitted in the 2014 edition of Standard 189.1. Note that this section was added to the standard by Addendum u to 189.1-2011. (Note: Ad
7、ditions are shown in underline.) 5.3.3 Plants. 5.3.3.1 Invasive Plants. Invasive plants shall be removed from the building project site and destroyed or disposed of in a land fill. Invasive plants shall not be planted on the building project site. 5.3.3.2 Greenfield Sites. On a greenfield site: a. w
8、here more than 20% of the area of the predevelopment site has existing native plants or adapted plants, a minimum of 20% of the area of native plants or adapted plants shall be retained. b. where 20% or less of the area of the predevelopment site has existing native plants or adapted plants, a minim
9、um of 20% of the site shall be developed or retained as vegetated area. Such vegetated areas include bioretention facilities, rain gardens, filter strips, grass swales, vegetated level spreaders, constructed wetlands, planters, and open space with plantings. A minimum of 60% of such vegetated area s
10、hall consist of biodiverse planting of native plants and/or adapted plants other than turfgrass. Errata Sheet for ANSI/ASHRAE/USGBC/IES Standard 189.1-2014 Page 2 of 2 2017 ASHRAE. All rights reserved. 53 11. Normative References. Change “Illuminating Engineering Society of North America” to “Illumi
11、nating Engineering Society”. 99* Table C1.1 Modifications and Additions to Tables G3.1 of Appendix G in ANSI/ASHRAE/IES Standard 90.1 (Continued). (Note: Additions are shown in underline and deletions are shown in strikethrough.) 11. Service Hot-Water Systems In addition to the requirements in Table
12、 G3.1 (11), service hot-water usage is allowed to be lower in the proposed design than in the baseline building design if service hot-water use can be demonstrated to be less than that resulting from compliance with Sections 6.3.2, 6.4.2, and 6.4.3. The service hot-water system in the baseline build
13、ing design shall use the same energy source as the corresponding system in the proposed design and shall conform with the following conditions: a. Where a complete service hot water system exists, the baseline building design shall reflect the actual system type using actual component capacities and
14、 efficiencies. b. Where a new service hot water system has been specified, the system shall be sized according to the provisions of Section 7.4.1 of ANSI/ ASHRAE/IES Standard 90.1 and the equipment shall match the minimum efficiency requirements in Section 7.4.4 under the standard renewables approac
15、h as described in Section 7.4.1.1.1 and the super- market heat recovery requirements in Section 7.4.7.2 The equipment efficiency requirements in Section 7.4.4.1 do not apply to the baseline building design. Where the energy source is electricity, the heating method shall be electrical resistance. 1.
16、 In addition to the requirements in Table G3.1 (11.b) and (11.c), service hot-water systems shall meet the requirements of Sections 7.4.4.1, 7.4.7.2, and 7.4.7.3. 2. In addition to the requirements in Table G3.1 (11.f), the baseline building design shall meet the requirements of Section 7.4.7.2. If
17、a condenser heat recovery system meeting the requirements described in Section 7.4.7.2 cannot be modeled, the requirement for including such a system in the actual building shall be met as a prescriptive requirement and no heat-recovery system shall be included in the proposed design or baseline bui
18、lding design. 3. In addition to the requirements in Table G3.1 (11.i), the baseline building design shall meet the requirements of Sections 6.3.2 and 6.4.3. 122 Informative Appendix G Informative References. Change “Illuminating Engineering Society of North America” to “Illuminating Engineering Society”.