ANSI ASTM F2479-2017 Standard Guide for Specification Purchase Installation and Maintenance of Poured-In-Place Playground Surfacing.pdf

上传人:livefirmly316 文档编号:433119 上传时间:2018-11-11 格式:PDF 页数:8 大小:169.17KB
下载 相关 举报
ANSI ASTM F2479-2017 Standard Guide for Specification Purchase Installation and Maintenance of Poured-In-Place Playground Surfacing.pdf_第1页
第1页 / 共8页
ANSI ASTM F2479-2017 Standard Guide for Specification Purchase Installation and Maintenance of Poured-In-Place Playground Surfacing.pdf_第2页
第2页 / 共8页
ANSI ASTM F2479-2017 Standard Guide for Specification Purchase Installation and Maintenance of Poured-In-Place Playground Surfacing.pdf_第3页
第3页 / 共8页
ANSI ASTM F2479-2017 Standard Guide for Specification Purchase Installation and Maintenance of Poured-In-Place Playground Surfacing.pdf_第4页
第4页 / 共8页
ANSI ASTM F2479-2017 Standard Guide for Specification Purchase Installation and Maintenance of Poured-In-Place Playground Surfacing.pdf_第5页
第5页 / 共8页
点击查看更多>>
资源描述

1、Designation: F2479 17 An American National StandardStandard Guide forSpecification, Purchase, Installation and Maintenance ofPoured-In-Place Playground Surfacing1This standard is issued under the fixed designation F2479; the number immediately following the designation indicates the year oforiginal

2、adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide covers information with regard to the design,manufacture,

3、 installation, and maintenance of poured-in-placeplayground surfaces.NOTE 1This document is a guide and not intended to be used as aspecification; it should be used for educational purposes.1.2 This guide outlines the issues of compliance withexisting standards, durability, and functional longevity.

4、1.3 This guide reviews issues such as edge treatment,abutting surfaces, and combinations with other surfaces de-signed for circulation or protective surfaces.1.4 This guide presents maintenance considerations andgeneral procedures that should be followed by the owner/operator.1.5 This guide outlines

5、 aging considerations such as loss ofimpact absorption, cracking, shrinkage, heaving, and how toprevent, accommodate, or rectify those issues.1.6 This guide presents warranty considerations.1.7 This guide does not imply that an injury cannot beincurred when the surface system is compliant with thest

6、andards referred to in this guide.1.8 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.9 This standard does not purport to address all o

7、f thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.1.10 This international standard was developed in accor-dance with

8、 internationally recognized principles on standard-ization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recom-mendations issued by the World Trade Organization TechnicalBarriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:

9、2F1292 Specification for Impact Attenuation of SurfacingMaterials Within the Use Zone of Playground EquipmentF1951 Specification for Determination of Accessibility ofSurface Systems Under and Around Playground Equip-ment2.2 CSA Standard:3CSA Z614 Childrens Playspaces and Equipment3. Terminology3.1 D

10、efinitions:3.1.1 aliphatic prepolymerprepolymer which does notcontain any 1,3,5-cyclohexatrien group.3.1.1.1 DiscussionGenerally highly color stable when ex-posed to UV radiation, no yellowing.3.1.2 ambient grindingprocess that takes raw rubber prod-ucts and processes it to rubber crumb, chips, buff

11、ings, and soforth that is at the temperature generated by the grindingequipment or in the location of production.3.1.3 aromatic prepolymerhydrocarbons that are madefrom only hydrogen and carbon and contain a prepolymerwhich contains one or more 1,3,5-cyclohexatriene group.3.1.3.1 DiscussionAromatic

12、prepolymer are generallysusceptible to change when exposed to UV and moisture.These changes can be seen as a yellowish shading or “amber-ing” of the top surface, especially when encapsulating rubbercrumb that is grey, light blue, blue, eggshell, teal, and so forth.3.1.4 asphalt, adjacentbituminous b

13、ound material that isused as a curb or walkway and comes into contact with thepoured-in-place surface.1This guide is under the jurisdiction of ASTM Committee F08 on SportsEquipment, Playing Surfaces, and Facilities and is the direct responsibility ofSubcommittee F08.63 on Playground Surfacing System

14、s.Current edition approved June 1, 2017. Published July 2017. Originally approvedin 2007. Last previous edition approved in 2017 as F2479 12 (2017). DOI:10.1520/F2479-17.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annu

15、al Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from Canadian Standards Association (CSA), 5060 Spectrum Way,Mississauga, ON L4W 5N6, Canada, http:/www.csa.ca.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, Wes

16、t Conshohocken, PA 19428-2959. United StatesThis international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recommendations issued by the World Tr

17、ade Organization Technical Barriers to Trade (TBT) Committee.13.1.4.1 DiscussionThe materials and compaction shallconform to local engineering practices and have a mechanicalcompaction of no less than 98 % standard proctor density. Theedge of the asphalt at the junction with the poured-in-placesurfa

18、ce shall be vertical to 30 from horizontal. Considerationshould be given to the use of an appropriate primer asrecommended by the manufacturer to ensure adhesion of thepoured-in-place surface to the asphalt.3.1.5 asphalt, basehard, bituminous bound surface that isunder the poured-in-place surface.3.

19、1.5.1 DiscussionNew asphalt should cure at least 14days, have no residual surface oils, and be pressure washed orhave at least two thorough rainfalls prior to receiving poured-in-place surface. When the surface is flooded with as much as0.2 in. (5.1 mm) of water, there should be no evidence(rainbow

20、effect) of oils on the surface of the water. A properlyprepared asphalt base will be able to effectively remove anywater which penetrates the poured-in-place surface. This maybe accomplished by sloping the asphalt, installing drainage, orusing porous asphalt.3.1.6 concrete, baseconcrete surface that

21、 is under thepoured-in-place surface.3.1.6.1 DiscussionThe concrete base should be 4 in. (100mm) minimum thickness. All new concrete slabs should curefor a minimum of seven days prior to receiving poured-in-placesurface. Concrete base should have a medium broom finish. Aproperly prepared concrete ba

22、se will be able to effectivelyremove any water which penetrates the poured-in-place sur-face. This may be accomplished by sloping the concrete,installing drainage, or using a porous concrete.3.1.7 concrete, adjacentconcrete material that is used as acurb or walkway and comes into contact with the po

23、ured-in-place surface3.1.7.1 DiscussionThe materials and compaction shallconform to local engineering practices and have a moisturecontent less than 5 % at the time the poured-in-place surface isinstalled. The edge of the concrete at the junction with thepoured-in-place surface shall be vertical. Co

24、nsideration shouldbe given to the use of an appropriate primer as recommendedby the manufacturer to ensure adhesion of the poured-in-placesurface to the concrete. Other strategies to avoid sinking of thefinal poured-in-place surface would be to provide a “key” or“step” in the vertical face of the co

25、ncrete to support thepoured-in-place surface.3.1.8 cryogenic grindingprocess that takes a raw rubberproduct and processes it to rubber crumb, chips, and so forth,a process that freezes the raw product and the frozen product isground to the specification.3.1.9 gravel, base mixture of crushed stone, s

26、and, or boththat is compacted to not less than 95 % standard proctordensity.3.1.9.1 DiscussionA geotextile may be required betweenthe granular base and poured-in-place surface to ensure that theparticles of the granular base do not contaminate the poured-in-place surface. If fine particles from the

27、base migrate into thepoured-in-place system the void content of the system isreduced and the ability to attenuate force is reduced.3.1.10 drainage, sub-surfaceprovision of a method ofremoving water below the poured-in-place surface.3.1.10.1 DiscussionThis can be achieved by sloping thesub-base mater

28、ial where it has a high clay content, usingdrainage channels or pipes, installing a granular drainage layerfor percolation.3.1.11 drainage, surfacesloping of the surface to allowwater to travel across the surface to a drain.3.1.11.1 DiscussionThe porosity of the poured-in-placesurface allows water t

29、o pass through more quickly than acrossit unless it is fully saturated.3.1.12 EPDM rubber productproduct comprised of or-ganic and inorganic materials with a minimum of 20 % and amaximum of 26 % of ethylene propylene-diene-saturatedpolymethylene main chain along with other organic andinorganic compo

30、nents. The rubber can be either peroxide orsulphur cured.3.1.13 functional longevityability of the poured in placesurface to continue to comply with relevant ASTM standardsand not require replacement.3.1.13.1 DiscussionThere are circumstances where thepoured-in-place surface is physically in place h

31、owever becauseof failures with regard to the stated performance criteria, thesurface needs to be replaced. The functional longevity can bestated in years or by comparison to the functional life of theplay structure as stated in writing by the play structuremanufacturer.3.1.14 gravel, drainage layero

32、pen course of granularmaterial that is installed as a layer or in channels to promoteremoval of water from a location.3.1.14.1 DiscussionThe layer should have a slope thatpromotes the removal of water.3.1.15 humidity/moisture effectschanges in the poured-in-place system caused by fluctuations in abs

33、olute humidity orexposure to moisture during the storage of materials,installation, and cure.3.1.15.1 DiscussionPolyurethane binders are reactive tomoisture in varying degrees, depending upon formulation. Allone-component polyurethane binders will require some degreeof moisture to affect a cure of t

34、he product. Dramatic changes inmoisture or absolute humidity can cause variable finishes in thesurface if they are not accounted for. During installation, somepoured-in-place surfaces require dry conditions, while otherscan be installed during a light rain and others can have waterapplied directly t

35、o the surface. Exposure to water may causethe binder to foam and which may reduce the effectiveness ofthe bond. Moisture in the rubber that is mixed with the bindermay also have an effect on the outcome of the project if notaccounted for. One strategy to eliminate this problem is to havethe rubber s

36、tored in a dry place and if this is not possible, therubber should be covered with tarps or other methods em-ployed to prevent moisture from entering the materials.3.1.16 lacquerspolyurethane-based product that containssolvents applied as a top coat in a spray or roller application.3.1.16.1 Discussi

37、onThis product is used to provide colorthrough the addition of a pigment, protection, or both fromexposure to ultraviolet light.F2479 1723.1.17 latex binderspolymer binder that is water-basedthat has thermoplastic properties.3.1.17.1 DiscussionGenerally, the flexibility performanceis within a narrow

38、 range of temperature. Latex has also beenassociated with allergic reactions once it has cured. There is aconcern for children with exposed skin coming into contactwith this binder, as well persons with disabilities who have apropensity to allergic reactions to latex.3.1.18 polymer binderssynthetic

39、binders used in themanufacture of the poured-in-place surface that coat theindividual rubber chips, crumb, or buffings.3.1.18.1 DiscussionThese binders are to provide flexibil-ity to allow the rubber particles to move in relation to oneanother and have the strength to stop the bond from breakingat m

40、aximum elongation. These binders are man-made frompetrochemicals and some of these demonstrate flexibility at arange of temperatures that children are expecting to use theplayground and specifically to allow compliance with Specifi-cation F1292. Polymer binders with a glass transition tempera-ture a

41、bove 22F (30C) and with high sensitivity to damageby submersion in water are to be avoided.3.1.19 polyurethanepolymer binder that demonstratesflexibility and strength over a wide range of temperatures.3.1.19.1 DiscussionPolyurethane is manufactured in bothone-component (moisture cured) and two-compo

42、nent (mixingpart A and part B in a specified ratio). Binders used inpoured-in-place surfaces are almost always of the one-component type. Certain polyurethane binders can be damagedthrough exposure to ultraviolet light and immersion in water.UV-resistant polyurethane lacquers may be applied to thesu

43、rface following installation of the poured-in-place surface.These lacquers are typically two-component. Once cured,polyurethane produces no known allergic reactions.3.1.20 recycled black EPDM rubbercrumb manufacturedthrough ambient or cryogenic grinding or crushing of postindustrial scrap, containin

44、g a mixture of types of rubberincluding EPDM rubber product and varying in size. Thisrubber must have a minimum of 4 % actual EPDM content.3.1.20.1 DiscussionThe actual percentage of EPDM con-tent will be significantly less than new EPDM rubber productdue to the inclusion of other industrial scrap r

45、ubber that issourced in the recycling process.3.1.21 recycled post consumer or industrial rubber rubbercrumb that is the result of granulating in an ambient orcryogenic process from a variety of scrap rubber produced asa part of an industrial process or at the end of an industrial orconsumer good ma

46、de of rubber.3.1.21.1 DiscussionThis is manufactured into rubbercrumb as the feedstock and is often of limited dimension. Thevariety of rubber can be very large in that this can include anywaste rubber from a manufacturing process or post consumeruse.3.1.22 recycled tire rubberrubber crumb, chips, o

47、r buff-ings made from post manufacturing of tires or post consumertires.3.1.22.1 DiscussionThis rubber can vary in its content asa result of the type of tire (automobile, truck, off road, and soforth) that is ground.3.1.23 release agentsmaterials that prevent the bonding ofthe polyurethane to other

48、surfaces.3.1.23.1 DiscussionThese can be waxes, silicone, or pe-troleum jelly.3.1.24 rubber buffngsstrands of rubber that are productshavings of rubber feedstock, typically tires, ranging in sizefrom 0.079 to 0.87 in. (2 to 20 mm) in length and 0.039 to0.157 in. (1 to 4 mm) in width.3.1.25 rubber ch

49、ipsparticles of rubber that have beenproduced by ambient or cryogenic grinding of rubber feedstockto a size of 0.197 to 0.59 in. (5 to 15 mm).3.1.26 rubber crumbparticles of rubber that have beenproduced by ambient or cryogenic grinding of rubber feedstockto a size of between 0.02 and 0.197 in. (0. 5 and 5 mm).3.1.26.1 DiscussionRubber crumb shall contain less than2 % rubber dust, fine rubber passing a 0.85 mm screen, as thiscan consume binder and affect the performance and longevityof the surface. The supplier of the rubber cr

展开阅读全文
相关资源
  • ANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdfANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdf
  • ANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdfANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdf
  • ANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdfANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdf
  • ANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdfANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdf
  • ANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdfANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdf
  • ANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdfANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdf
  • ANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdfANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdf
  • ANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdfANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdf
  • ANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdfANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdf
  • ANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdfANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdf
  • 猜你喜欢
  • BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf
  • BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf
  • BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf
  • BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf
  • BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf
  • BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf
  • BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf
  • BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf
  • BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ANSI

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1