1、FOR UL INTERNAL REFERENCE OR CSDS USE ONLY NOT FOR OUTSIDE DISTRIBUTION ANSI/CAN/UL/ULC 1201:2016, Sensor Operated Backwater Prevention Systems STANDARD FOR SAFETY JOINT CANADA-UNITED STATES NATIONAL STANDARD ANSI/UL 1201-2016SCC FOREWORD National Standard of Canada A National Standard of Canada is
2、a standard developed by an SCC-accredited Standards Development Organization (SDO), and approved by the Standards Council of Canada (SCC), in accordance with SCCs:Requirements and Guidance-Accreditation for Standards Development Organizations, and Requirements and Guidance-Approval of National Stand
3、ards of Canada Designation. More information on National Standard requirements can be found at www.scc.ca. An SCC-approved standard reects the consensus of a number of experts whose collective interests provide, to the greatest practicable extent, a balance of representation of affected stakeholders
4、. National Standards of Canada are intended to make a signicant and timely contribution to the Canadian interest. SCC is a Crown corporation within the portfolio of Industry Canada. With the goal of enhancing Canadas economic competitiveness and social well-being, SCC leads and facilitates the devel
5、opment and use of national and international standards. SCC also coordinates Canadian participation in standards development, and identies strategies to advance Canadian standardization efforts. Accreditation services are provided by SCC to various customers, including product certiers, testing labo
6、ratories, and standards development organizations. A list of SCC programs and accredited bodies is publicly available at www.scc.ca. Users should always obtain the latest edition of a National Standard of Canada from the standards development organization responsible for its publication, as these do
7、cuments are subject to periodic review.UL Standard for Safety for Sensor Operated Backwater Prevention Systems, ANSI/CAN/UL/ULC 1201 First Edition, Dated December 14, 2016 Summary of Topics The First Edition of the Standard for Sensor Operated Backwater Prevention Systems, ANSI/ CAN/UL/ULC 1201. The
8、 new requirements are substantially in accordance with Proposal(s) on this subject dated June 10, 2016. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form by any means, electronic, mechanical photocopying, recording, or otherw
9、ise without prior permission of UL. UL provides this Standard as is without warranty of any kind, either expressed or implied, including but not limited to, the implied warranties of merchantability or tness for any purpose. In no event will UL be liable for any special, incidental, consequential, i
10、ndirect or similar damages, including loss of prots, lost savings, loss of data, or any other damages arising out of the use of or the inability to use this Standard, even if UL or an authorized UL representative has been advised of the possibility of such damage. In no event shall ULs liability for
11、 any damage ever exceed the price paid for this Standard, regardless of the form of the claim. Users of the electronic versions of ULs Standards for Safety agree to defend, indemnify, and hold UL harmless from and against any loss, expense, liability, damage, claim, or judgment (including reasonable
12、 attorneys fees) resulting from any error or deviation introduced while purchaser is storing an electronic Standard on the purchasers computer system. DECEMBER 14, 2016 ANSI/CAN/UL/ULC 1201 tr1DECEMBER 14, 2016 ANSI/CAN/UL/ULC 1201 tr2 No Text on This PageDecember 14, 2016 1 UL/ULC 1201 Standard for
13、 Sensor Operated Backwater Prevention Systems First Edition December 14, 2016 This ANSI/CAN/UL/ULC Safety Standard consists of the First Edition. The most recent designation of ANSI/UL 1201 as an American National Standard (ANSI) occurred on December 14, 2016. ANSI approval for a standard does not i
14、nclude the Cover Page, Transmittal Pages, Title Page, Preface or SCC Foreword. This standard has been approved as a National Standard of Canada (NSC) by the Standards Council of Canada (SCC). COPYRIGHT 2016 UNDERWRITERS LABORATORIES INC. ANSI/UL 1201-2016DECEMBER 14, 2016 SENSOR OPERATED BACKWATER P
15、REVENTION SYSTEMS - UL/ULC 1201 2 No Text on This PageCONTENTS Preface .6 INTRODUCTION 1 Scope .9 2 Units of Measurement .9 3 Reference Publications 9 4 Glossary .9 CONSTRUCTION 5 General .10 5.1 General 10 5.2 Grade 10 5.3 Access .11 6 Control Unit Frame and Enclosure .11 6.1 General 11 6.2 Cast me
16、tal enclosures .11 6.3 Sheet metal enclosures 12 6.4 Nonmetallic enclosures .12 6.5 Electric shock .13 6.6 Ventilating openings .13 7 Metal Covers and Doors 14 8 Glass Panels 14 9 Corrosion Protection .15 10 Insulating Materials .15 11 Mounting of Electrical Components .16 12 Operating Mechanisms 17
17、 13 Current-Carrying Parts 17 14 Servicing Protection .17 15 Field-Wiring Connections 18 15.1 Primary power supply .18 15.2 Secondary power supply 18 15.3 Batteries 18 16 Installation Wiring Connections .19 16.1 General .19 16.2 Field-wiring terminals .20 16.3 Field-wiring leads .20 16.4 Power-suppl
18、y cord 20 17 Strain Relief 21 17.1 General .21 17.2 Power-supply cord 21 17.3 Field-wiring leads .21 18 Internal Wiring 21 19 Grounding .22 19.1 Equipment grounding .22 19.2 Polarity identication 23 20 Components .23 20.1 Printed wiring boards .23 20.2 Bushings 23 DECEMBER 14, 2016 SENSOR OPERATED B
19、ACKWATER PREVENTION SYSTEMS - UL/ULC 1201 320.3 Coil windings 24 20.4 Switches 24 20.5 Protective devices 24 21 Spacings 25 22 Materials and Finishes 25 22.1 General .25 22.2 Internal working parts .26 22.3 Cast iron 26 22.4 Copper alloy .26 22.5 ABS 26 22.6 PVC 26 22.7 Gaskets .27 22.8 Bolting mate
20、rials .27 22.9 Finishes .27 22.10 Coatings .27 23 Connections 27 23.1 Hub and spigot 27 23.2 Flanged .28 23.3 Hubless .28 23.4 Threaded 28 23.5 Solvent cement 28 23.6 O-ring joints .28 23.7 Dimensions 28 PERFORMANCE 24 General 29 25 Watertightness/Leakage and Backwater Pressure Test 29 26 Cap Sealin
21、g and Thread Integrity Test 29 27 Waterow 30 28 Rupture Test .30 29 Power Failure Mode Test 30 30 Life Cycle Test .30 31 Time Delay Requirement Test 31 31.1 System activation 31 31.2 System activation test procedure .31 31.3 System deactivation 32 31.4 System deactivation test procedure .32 32 Corro
22、sion Test .32 33 Control Unit Tests 33 33.1 General .33 33.2 Normal operation test .33 33.3 Electrical supervision test .34 33.4 Undervoltage operation test .34 33.5 Overvoltage operation test 35 33.6 Voltage and current measurements .35 33.7 Jarring test 36 33.8 Temperature test .36 33.9 Overload t
23、est 38 33.10 Endurance test control unit .38 33.11 Variable ambient temperature test .39 33.12 Humidity test .39 33.13 Leakage current test .39 DECEMBER 14, 2016 SENSOR OPERATED BACKWATER PREVENTION SYSTEMS - UL/ULC 1201 433.14 Electric shock current test 40 33.15 Transient tests 42 33.16 Dielectric
24、 voltage-withstand test .44 33.17 Component failure test .45 33.18 Audibility test .45 33.19 Abnormal operation test 45 34 Marking 46 35 Maintenance And Operating Instructions .46 TABLES FIGURES ANNEX A Reference Standards(Informative) DECEMBER 14, 2016 SENSOR OPERATED BACKWATER PREVENTION SYSTEMS -
25、 UL/ULC 1201 5Preface This is the First Edition of the Standard for Sensor Operated Backwater Prevention Systems. This Edition of the Standard has been formally approved by the UL/ULC Joint Committee on Prevention of Storm and Sanitary Backow. This Standard has been developed in compliance with the
26、requirements of SCC and ANSI for accreditation of a Standards Development Organization. Only metric SI units of measurement are used in this Standard. If a value for measurement is followed by a value in other units in parentheses, the second value may be approximate. The rst stated value is the req
27、uirement. Appendix A, identied as Informative, is for information purposes only. UL is accredited by the American National Standards Institute (ANSI) and the Standards Council of Canada (SCC) as a Standards Development Organization (SDO). ULC Standards is accredited by the Standards Council of Canad
28、a (SCC) as a Standards Development Organization (SDO). This ANSI/CAN/UL/ULC 1201 Standard for Safety is under continuous maintenance, whereby each revision is ANSI/CAN approved upon publication. If no revisions occur, the initiation of the review of this Standard will commence within 5 years of the
29、date of publication. The review and action to revise or reaffirm this Standard will not exceed 5 years from the date of publication, unless the Standard is identied as tting within a stabilized category, whereby the review will commence within the appropriate time frame set out by ULC Standards and
30、Underwriters Laboratories Inc. In Canada, there are two official languages, English and French. All safety warnings must be in French and English. Attention is drawn to the possibility that some Canadian authorities may require additional markings and/or installation instructions to be in both offic
31、ial languages. This is a First Edition joint National Standard of Canada and American National Standard. Comments or proposals for revisions on any part of the Standard may be submitted to UL or ULC at any time. Proposals should be submitted via a Proposal Request in ULs On-Line Collaborative Standa
32、rds Development System (CSDS) at http:/. Attention is drawn to the possibility that some of the elements of this joint Canadian and American standard may be the subject of patent rights. ULC Standards shall not be held responsible for identifying any or all such patent rights. Requests for interpret
33、ation of this Standard should be sent to ULC Standards. The requests should be worded in such a manner as to permit a “yes” or “no” answer based on the literal text of the requirement concerned. ULs Standards for Safety are copyrighted by UL. Neither a printed nor electronic copy of a Standard shoul
34、d be altered in any way. All of ULs Standards and all copyrights, ownerships, and rights regarding those Standards shall remain the sole and exclusive property of UL. DECEMBER 14, 2016 SENSOR OPERATED BACKWATER PREVENTION SYSTEMS - UL/ULC 1201 6To purchase UL Standards, visit Comm 2000 at http:/m- o
35、r call tollfree 1-888-853-3503. Copies of this National Standard of Canada may be ordered from ULC Standards. This list represents the STP 1201 membership when the nal text in this standard was balloted. Since that time, changes in the membership may have occurred. STP 1201 Membership Name Represent
36、ing Interest Category* Region Bob Bielawski Mainline Backow Products Inc. Producer USA Robert Burnham Zurn Industries Producer USA Maribel Campos ICC Evaluation Service LLC Testing and Standards USA Mark Harrold City of Lethbridge Producer Alberta Edwin Ho International Association of Plumbing and M
37、echanical Officials (IAPMO) Testing and Standards Canada Paul Holland City of Greater Sudbury AHJ Ontario Christopher Johnson Fluids Controls Institute (FCI) General USA William LaRose self General Canada Christopher McLellan Canadian Home Builders Association General Canada Brian Murphy ULC Standar
38、ds STP Co-Chair - Non-voting Canada Joe Musso Underwriters Laboratories Inc. STP Co- Chair - Non-voting USA Brian Patriquin Inotrolix Producer Canada Mark Ramlochan ULC Standards STP Co- Project Manager - Non-voting Canada Shabbir Rawalpindiwala Kohler Co General USA Dan Sandink Institute for Catast
39、rophic Loss Reduction (ICLR) AHJ Canada Claudio Spagnuolo City of Brampton - Planning 13.200 For further information on UL standards and ULC Standards, please contact: DECEMBER 14, 2016 SENSOR OPERATED BACKWATER PREVENTION SYSTEMS - UL/ULC 1201 7Underwriters Laboratories Inc. 171 Nepean Street, Suit
40、e 400 Ottawa, Ontario K2P 0B4 Phone: 1-613.755.2729 E-mail: customerserviceulc.ca Web site: This Standard is intended to be used for conformity assessment. The intended primary application of this standard is stated in its scope. It is important to note that it remains the responsibility of the use
41、r of the standard to judge its suitability for this particular application. CETTE NORME NATIONALE DU CANADA EST DISPONIBLE EN VERSIONS FRANAISE ET ANGLAISE DECEMBER 14, 2016 SENSOR OPERATED BACKWATER PREVENTION SYSTEMS - UL/ULC 1201 8INTRODUCTION 1 Scope 1.1 This standard covers backwater prevention
42、 systems that use sensors, controls and mechanisms for the prevention of backow for sanitary drainage and storm systems and species minimum requirements for materials, mechanical, electrical, performance tests and markings. 1.2 The purpose of this Standard is to enhance health and safety by: a) Spec
43、ifying acceptable criteria for sensor operated backwater prevention systems; b) Serving as a guide for producers, distributors, architects, engineers, contractors, installers, inspectors and users; and c) Promoting understanding regarding materials and manufacturing of sensor operated backwater prev
44、ention systems. 2 Units of Measurement 2.1 Only metric SI units of measurement are used in this Standard. If a value for measurement is followed by a value in other units in parentheses, the second value may be approximate. The rst stated value is the requirement. 3 Reference Publications 3.1 See An
45、nex A for a list of publications referenced in this standard. Any undated reference to a code or standard appearing in the requirements of this standard shall be interpreted as referring to the latest edition of that code or standard. When the latest edition of a standard is not applicable, the appr
46、opriate edition is indicated accordingly in Annex A. 4 Glossary 4.1 SEALING ELEMENT A pneumatic or mechanical component in a backwater prevention system that when deployed or activated, prevents the reverse ow of storm or sanitary drainage. DECEMBER 14, 2016 SENSOR OPERATED BACKWATER PREVENTION SYST
47、EMS - UL/ULC 1201 9CONSTRUCTION 5 General 5.1 General 5.1.1 Sensor operated backwater prevention systems shall consist of a) An electronic control panel; b) A retractable sealing element; c) Electrical cables and connectors to connect the control panel to the sealing element; d) A service or cleanou
48、t cap; e) Additional components such as gaskets; and f) The installation hardware. 5.1.2 Caps shall rmly secure and seal the sealing element inside the tting. 5.1.3 The sealing element shall comply with the performance tests specied. 5.1.4 If the sealing element is a pneumatic type device, the air t
49、ube shall be attached to the sealing element using a means to provide a secure tensile attachment. The air tube connection to the sealing element shall be capable of withstanding for 1 min a pull of 10 N applied to the tube without causing the tube to detach from the sealing element. 5.1.5 The sealing element shall be properly positioned and secured in its installed position using manufacturer provided installation hardware, in accordance with the manufacturers installation instructions.