ANSI ESTA E1.50-1-2017 Entertainment Technology - Requirements for the Structural Support of Temporary LED Video & Display Systems.pdf

上传人:amazingpat195 文档编号:434762 上传时间:2018-11-11 格式:PDF 页数:19 大小:247.65KB
下载 相关 举报
ANSI ESTA E1.50-1-2017 Entertainment Technology - Requirements for the Structural Support of Temporary LED Video & Display Systems.pdf_第1页
第1页 / 共19页
ANSI ESTA E1.50-1-2017 Entertainment Technology - Requirements for the Structural Support of Temporary LED Video & Display Systems.pdf_第2页
第2页 / 共19页
ANSI ESTA E1.50-1-2017 Entertainment Technology - Requirements for the Structural Support of Temporary LED Video & Display Systems.pdf_第3页
第3页 / 共19页
ANSI ESTA E1.50-1-2017 Entertainment Technology - Requirements for the Structural Support of Temporary LED Video & Display Systems.pdf_第4页
第4页 / 共19页
ANSI ESTA E1.50-1-2017 Entertainment Technology - Requirements for the Structural Support of Temporary LED Video & Display Systems.pdf_第5页
第5页 / 共19页
点击查看更多>>
资源描述

1、ANSI E1.50-1 2017, Requirements for the Structural Support of Temporary LED, Video 100 employees/members)Chauvet ProfessionalColumbus McKinnon Entertainment TechnologyMartin ProfessionalRobeUnited States Institute for Theatre TechnologyVERWalt Disney Parks and ResortsVISIONARY ($5,000 20100 employee

2、s/members)Altman Lighting, Inc.German Light ProductsJR ClancyMcLaren Engineering GroupStage RiggingTMBTyler Truss Systems, Inc.VISIONARY ($500 100 employees/members)Barbizon ElectricGolden Sea Professional Equipment LimitedIATSE Local 891LexNAMMRosco LaboratoriesTexas Scenic Company 2017 ESTA iv Rig

3、/2013-2056r7ANSI E1.50-1 2017, Requirements for the Structural Support of Temporary LED, Video 20100 employees/members)American Society of Theatre ConsultantsCity Theatrical Inc.InterAmerica Stage, Inc. Lycian Stage LightingMorpheus LightsNiscon Inc.Syracuse Scenery and Stage LightingXSF Xtreme Stru

4、ctures and FabricationINVESTOR ($200$499; 100 employees/members)Ian Foulds, IATSE Local 873Harlequin FloorsIATSE Local 80PSAVSUPPORTER ($1,500; 20100 employees/members)Aerial ArtsBlizzard Lighting, LLCCreative Stage LightingGeiger EngineersH 20 employees/members)AC Power Distribution, Inc.Michael Co

5、wgerMilton DavisPeter DonovanPat GrenfellMitch HefterBill HektnerAlan HendricksonHoist Sales and ServicesBeverly and Tom InglesbyIntensity AdvisorsJSAVEddie KramerMichael LayJohn MusarraShawn NolanLizz PittsleyPhil ReillyRobert ScalesCharles ScottMichael SkinnerSkjonberg Controls Inc.Studio T+L, LLC

6、John SzewczukTeclumenTheta ConsultingTracy UnderhillKen Vannice Robert L. Williams 2017 ESTA v Rig/2013-2056r7ANSI E1.50-1 2017, Requirements for the Structural Support of Temporary LED, Video M.G. McLaren, P.C.; GJesse Adams; Rose Brand; DRTracie Allen; R MPFrank Allison; M.G. McLaren, P.C.; GDana

7、Bartholomew; Foy Inventerprises, Inc.; CPWilliam Beautyman; Limelight Productions, Inc.; DRIan Bevan; Walt Disney Company; UKeith Bohn; Keith Bohn; GWilliam Bradburn; Aerial Arts, Inc.; UBennett Brian; Reed Rigging Inc.; DRJoseph Champelli; Entertainment Project Services, LLC; DEDan Culhane; Wenger

8、Corp.; CPBruce Darden; InterAmerica Stage, Inc.; CPRobert Dean; ZFX, Inc.; GJonathan Deull; JSD Projects LLC; UBrad Dittmer; Stage Labor of the Ozarks; URuss Dusek; I Weiss; MPDon Earl; Earl Girls, Inc.; DRNick Fleming; Walt Disney Company; UAdrian Forbes-Black; Total Structures Inc.; MPMike Garl; M

9、ike Garl Consulting LLC; DEDan Gibbs; Crew One Productions; UEthan William Gilson; Advanced Lighting and Production Services; USanford P. Gilzow; Shur-Rig LLC; GWilliam B. Gorlin; M.G. McLaren, P.C.; GJerry Gorrell; Theatre Safety Programs; GPat Grenfell; Hoist Sales DRRod Haney; I.A.T.S.E. Local 89

10、1; UTim Hansen; Oasis Stage Werks; DRPete Happe; Pete Happe; GHerb Hart; Columbus McKinnon Corp.; MPJeremy Hodgson; Cirque Du Soleil, Inc.; UDonald Hoffend_III; Avista Designs, LLC; GJoseph Jeremy; Show Distribution Group, Inc.; MPTed Jones; Grand Stage; UChristine L. Kaiser; Syracuse Scenery DRTher

11、esa Kelley; Full Throttle Films/ VER; DRJerald Kraft; JTH Lighting Alliance; CPEdwin S. Kramer; I.A.T.S.E. Local 1; UKyle Kusmer; Steven Schaefer Associates; GTom Lapp; Cirque Du Soleil, Inc.; URoger Lattin; I.A.T.S.E. Local 728; UJon Lenard; Applied Electronics; MPMichael Lichter; Electronic Theatr

12、e Controls, Inc.; MPDan Lisowski; University of Wisconsin - Madison; UJacob E. Loretto; Musson Theatrical Inc.; DRDaniel H. Louis; Theta Consulting LLC; G 2017 ESTA vii Rig/2013-2056r7ANSI E1.50-1 2017, Requirements for the Structural Support of Temporary LED, Video Foy Inventerprises, Inc.; CPSam M

13、ichael; Thern, Inc.; MPSteven Michelman; Entertainment Project Services, LLC; DEOrestes Mihaly; Production Resource Group; DRJohn P. Moore; Vertigo; CPBartholomew J. Mueller; Recreation Engineering Inc.; DEReid Neslage; H MPMark Newlin; Xtreme Structures and Fabrication; MPJim Niesel; Theatre Projec

14、ts Consultants, Inc.; DERichard J. Nix; Richard J. Nix; GShawn Nolan; Production Resource Group; DRTracy Nunnally; Vertigo; CPCarlos Ortega; PSAV Presentation Services; UGregory Orth; WNP Services, Inc.; DRMiriam Paschetto; Geiger Engineers; GRocky Paulson; Freeman Companies; DRTy M. Prewitt; BellaT

15、EX, Inc.; MPDemian Purdy; PSAV Presentation Services; USteven Ricks; Electronic Theatre Controls, Inc.; MPJohn Ringelman; Freeman Companies; DREric Rouse; Chicago Flyhouse; CPBill Sapsis; Sapsis Rigging, Inc.; UChris Schmidt; Freeman Companies; DRJason Schumacher; ZFX, Inc.; GJoseph S. Schuster; Sim

16、pson Gumpertz DESteven Serafin; Chubb Group of Insurance Companies; GHarold Ike Shippers; Syracuse Scenery DRJohn C. Snook; Thermotex Industries Inc.; CPRussell Solomon; Texas Scenic Company; DRStephen G. Surratt; Texas Scenic Company; DRPeter V. Svitavsky; Wenger Corp.; CPJason Tello; Tyler Truss S

17、ystems; CPKen Tilson; Columbus McKinnon Corp.; MPWill Todd; Milos Group; MPElmer Veith; Total Structures, Inc.; MPSteve Walker; Steve A. Walker GCharlie Weiner; Milos Group; MPMichael Wells; Xtreme Structures and Fabrication; MPMarty Wesstrom; Mountain Productions Inc.; DRJeff Wilkowski; Thern, Inc.

18、; MPR. Duane Wilson; Amer. Society of Theatre Consultants; DEMax A. Wilson; Applied Electronics; MPStephan Jon Wood; Tait Towers Manufacturing LLC; CPPaul Zagajeski; Wenger Corp.; CPObserver Members:Jacob Abbott; PSAV Presentation Services; UMatthew Antonucci; Contract Services Administration Trust

19、Fund; UBrent Armstrong; Alpine Rigging CPWilliam Ian Auld; Auld Entertainment; URobert Barbagallo; Solotech Inc.; DR 2017 ESTA viii Rig/2013-2056r7ANSI E1.50-1 2017, Requirements for the Structural Support of Temporary LED, Video Star Events Group Ltd.; DRRoy Bickel; Roy Bickel; GScott M. Blair; Ful

20、l Throttle Films/ VER; DRLee J. Bloch; Bloch Design Group, Inc.; GLouis Bradfield; Louis Bradfield; UDavid M. Campbell; Geiger Engineers; GDaniel J. Clark; Clark-Reder Engineering, Inc.; GBenjamin Cohen; Chicago Flyhouse Inc.; CPDavid Darland; PSAV Presentation Services; UJim Digby; Event Safety All

21、iance; UTim Franklin; Theta Consulting LLC; GJames M. Garner; Walt Disney Company; GMichael P. Gosenski; Rigging Systems LLC; USean Harding; Port Lighting Systems; GChris Higgs; Total Solutions Group; GJeremy Hochman; Full Throttle Films/ VER; DRKent H. Jorgensen; IATSE Local 80; GGary Justesen; Oas

22、is Stage Werks; DRWendy Manson; Cirque Du Soleil, Inc.; UEdward A. (Ted) Paget; Electronic Theatre Controls, Inc.; MPKurt Pragman; Pragman Associates, LLC; GMark Riddlesperger; LA ProPoint, Inc.; CPTim Salamon; PSAV Presentation Services; DRPeter A. Scheu; Scheu Consulting Services, Inc.; DEFord Sel

23、lers; Chauvet Lighting; MPSteven C. Shaw; Levitating Productions, Inc.; MPMonica Skjonberg; Skjonberg Controls, Inc.; CPKnut Skjonberg; Skjonberg Controls, Inc.; CPTodd Spencer; PSAV Presentation Services; URoss Taylor; Taylor GJames Tomlinson; Team Tomlinson; GStephen Vanciel; IATSE Local 631; UPat

24、rick Wallace; PSAV Presentation Services; UDrew Wending; PSAV Presentation Services; DRGreg Williams; PSAV Presentation Services; GNicholas Gill Wright; I.A.T.S.E. Local 16; GJeong Sik Yoo; Korea Testing Laboratory / Theatre Safety Center; DEKey to codes:CP Custom-market producerDE DesignerDR Dealer

25、G General interestMP Mass-market producerU User 2017 ESTA ix Rig/2013-2056r7ANSI E1.50-1 2017, Requirements for the Structural Support of Temporary LED, Video & Display SystemsTable of ContentsInvestors in Innovation.ivContact Informationvi1. Introduction.11.1 Scope11.2 Intent11.3 Annex Notes11.4 Re

26、ference Standards.12. Definitions.23. General requirements.23.1 Reference Standards Compliance.23.2 Documentation.33.3 Component Part Security.43.4 Installation conditions*.53.5 Suspended systems53.6 Planning.53.7 Component selection.53.8 Assembly, erection, disassembly.63.9 Personnel access*.63.10

27、Use63.11 Training63.12 Inspections & Maintenance64.0 Example diagram75.0 Annex7 2017 ESTA x Rig/2013-2056r7ANSI E1.50-1 2017, Requirements for the Structural Support of Temporary LED, Video & Display Systems1. Introduction1.1 ScopeThe scope of this standard covers temporary installations of large fo

28、rmat modular display systems, LED, video and other self-illuminating display structures not otherwise addressed by existing standards. The scope of this standard includes planning and site preparedness, assembly and erection, suspension and safety of components, special access requirements, use and

29、dismantling of these systems. The scope of this standard includes LED, video and self-illuminating display systems that in any way rely on rigid structural support frames, overhead suspensions, ground-supported stands or wall-mounted techniques during any use or installation, and applies to any of t

30、hese systems in areas where failure of any support or anchorage could cause personal injury, loss of life or property damage.1.2 IntentThis standard intends to increase safety awareness and understanding of risks associated with the use of these systems. This standard does not intend to address aest

31、hetics, image quality or visual intensity, content delivery or other factors not associated with risk or safety. It does not intend to provide a final, thorough or exhaustive list of potential hazards, nor does it intend to restrict development of new technology or techniques.1.3 Annex NotesThis sta

32、ndard uses annex notes to supplement normative requirements with explanatory information. Additional Annex note information is indicated by the use of an asterisk (*) after the term or subject matter within the referring section, and refers to an Annex note having a corresponding section number prec

33、eded by the letter “A“ - e.g. the annex note for a reference in section 4.5* will be labeled A4.5.1.4 Reference StandardsThe following reference standards contain information or supplemental requirements pertaining to this standard. The complete standard name is given here, but in the normative requ

34、irements the standards are referenced by an abbreviated title, e.g. ANSI E1.2:ANSI E1.1-2012, Entertainment Technology - Construction and Use of Wire Rope LaddersANSI E1.2-2012, Entertainment Technology - Design, Manufacture and Use of Aluminum Trusses and TowersANSI E1.4-2013, Entertainment Technol

35、ogy - Manual Counterweight Rigging SystemsANSI E1.6-1-2012, Entertainment Technology - Powered Hoist Systems,ANSI E1.6-2-2013, Entertainment Technology - Design, Inspection and Maintenance of Electric Chain Hoists for the Entertainment Industry.ANSI E1.6-3-2012 Entertainment Technology - Selection a

36、nd Use of Electric Chain Hoists in the Entertainment Industry.ANSI E1.8-2012, Entertainment Technology - Loudspeaker Enclosures Intended for Overhead Suspension - Classification, Manufacture and Structural TestingANSI E1.15-2006 (R2011), Entertainment Technology - Recommended Practices and Guideline

37、s for the Assembly and Use of Theatrical Boom & Base Assemblies.ANSI E1.21-2013, Entertainment Technology - Temporary Structures Used for Technical Production of Outdoor Entertainment EventsANSI E1.39-2014, Entertainment Technology Selection and Use of Personal Fall Arrest Systems on Portable Struct

38、ures Used in the Entertainment IndustryNFPA 70 - National Electric CodeANSI/ASSE Z359, Fall Protection CodeASM1-10 Aluminum Design Manual 2010D1.1/D1.1M:2010, Structural Welding Code SteelD1.2/D1.2M:2008, Structural Welding Code - AluminumAISC 360, Manual of Steel Construction 14th Edition 2017 ESTA

39、 1 Rig/2013-2056r7ANSI E1.50-1 2017, Requirements for the Structural Support of Temporary LED, Video & Display Systems2. Definitions2.1 Competent person: a person who is capable of identifying existing and predictable hazards in the workplace, and who is authorized to take prompt corrective measures

40、 to eliminate them.2.2 Display frame: a load bearing component that supports one or more display modules.2.3 Display module: any non-load-bearing display element intended to be used individually or as part of a larger display system.2.4 Display support structure: the structural support to which one

41、or more display frames are directly attached for primary structural strength and rigidity, but not otherwise classified as building structure.2.5 Display system: the complete assembly of display modules, display frame(s)and display support structure together, as intended for its specific use or appl

42、ication, including personnel access and safety equipment where such are required for use of the display system.2.6 Operations Management Plan (OMP): Documentation governing the installation throughout its entire use period, and equivalent to the intent of those requirements as described in ANSI E1.2

43、1- 2013. 2.7 Qualified person: a person who by possession of a recognized degree or certificate of professional standing, or who by extensive knowledge, training, and experience, has successfully demonstrated the ability to solve or resolve problems relating to the subject matter and work.2.8 Shall:

44、 denotes a mandatory requirement or restriction.2.9 Should: denotes a non-mandatory recommendation.3. General requirementsStructural support components and systems shall be designed and selected by a qualified person, regardless if the component or connection is a module, frame or structural support

45、 thereof. Structural connections shall be designed by a qualified person.3.1 Reference Standards Compliance Display systems shall comply with the following reference standards, as applicable:ANSI E1.1-2012, where wire rope ladders are used for access to the systemANSI E1.2-2012, where any portion of

46、 the system uses Aluminum trusses or towers for framing or sup-port purposes.ANSI E1.4-2013, where the system uses lifting system components such as loft blocks, pipe battens, etc.ANSI E1.6-1-2012, where the display system uses powered hoisting devices other than those covered by the scope of ANSI E

47、1.6-2-2012.ANSI E1.6-2-2012, and ANSI E1.6-3-2013, where the display system uses serialized chain hoists.ANSI E1.6-1, E1.6-2, and ANSI E1.21 for requirements and intent of Risk Assessment/Risk Reduction criteria ANSI E1.8-2013, where the display system uses suspended loudspeaker enclosures, or where

48、 display modules are required to support suspended loudspeaker enclosures or other display modules without additional support frame connections. 2017 ESTA 2 Rig/2013-2056r7ANSI E1.50-1 2017, Requirements for the Structural Support of Temporary LED, Video & Display SystemsANSI E1.15-2012, where the d

49、isplay system uses boom and base assemblies for support. ANSI E1.21-2013, where the display system is configured such that it could be classified as standalone structure, regardless if the structure is used indoors or outdoors. ANSI E1.39-2014, where the display system requires direct personnel access for any reason.ANSI/ASSE Z359, Fall Protection Code where personal Fall Arrest Systems (PFAS) are required for access to any part of the display system.NFPA 70 National Electric CodeSociety of Professional Rope Access Technicians (SPRAT), Safe P

展开阅读全文
相关资源
  • ANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdfANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdf
  • ANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdfANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdf
  • ANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdfANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdf
  • ANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdfANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdf
  • ANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdfANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdf
  • ANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdfANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdf
  • ANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdfANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdf
  • ANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdfANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdf
  • ANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdfANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdf
  • ANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdfANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ANSI

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1