ANSI ISA 75.01.01-2012 Industrial-Process Control Valves - Part 2-1 Flow capacity - Sizing equations for fluid flow under installed conditions《工业过程控制阀.第2-1部分 流通能力.安装条件下不可压缩流体流量的校准方.pdf

上传人:王申宇 文档编号:436956 上传时间:2018-11-14 格式:PDF 页数:70 大小:867.95KB
下载 相关 举报
ANSI ISA 75.01.01-2012 Industrial-Process Control Valves - Part 2-1 Flow capacity - Sizing equations for fluid flow under installed conditions《工业过程控制阀.第2-1部分 流通能力.安装条件下不可压缩流体流量的校准方.pdf_第1页
第1页 / 共70页
ANSI ISA 75.01.01-2012 Industrial-Process Control Valves - Part 2-1 Flow capacity - Sizing equations for fluid flow under installed conditions《工业过程控制阀.第2-1部分 流通能力.安装条件下不可压缩流体流量的校准方.pdf_第2页
第2页 / 共70页
ANSI ISA 75.01.01-2012 Industrial-Process Control Valves - Part 2-1 Flow capacity - Sizing equations for fluid flow under installed conditions《工业过程控制阀.第2-1部分 流通能力.安装条件下不可压缩流体流量的校准方.pdf_第3页
第3页 / 共70页
ANSI ISA 75.01.01-2012 Industrial-Process Control Valves - Part 2-1 Flow capacity - Sizing equations for fluid flow under installed conditions《工业过程控制阀.第2-1部分 流通能力.安装条件下不可压缩流体流量的校准方.pdf_第4页
第4页 / 共70页
ANSI ISA 75.01.01-2012 Industrial-Process Control Valves - Part 2-1 Flow capacity - Sizing equations for fluid flow under installed conditions《工业过程控制阀.第2-1部分 流通能力.安装条件下不可压缩流体流量的校准方.pdf_第5页
第5页 / 共70页
亲,该文档总共70页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 AMERICAN NATIONAL STANDARD ANSI/ISA-75.01.01-2012 (60534-2-1 MOD) Industrial-Process Control Valves - Part 2-1: Flow capacity - Sizing equations for fluid flow under installed conditions Approved 27 August 2012 Second Printing 2 October 2013 ANSI/ISA-75.01.01-2012 (60534-2-1 MOD) Industrial-Process

2、 Control Valves Part 2-1: Flow capacity Sizing equations for fluid flow under installed conditions ISBN: 978-1-937560-61-4 Copyright 2012 by IEC and ISA. All rights reserved. Not for resale. Printed in the United States of America. No part of this publication may be reproduced, stored in a retrieval

3、 system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recor ding, or otherwise), without the prior written permission of the Publisher. ISA 67 Alexander Drive P. O. Box 12277 Research Triangle Park, North Carolina 27709 3 ANSI/ISA-75.01.01-2012 (60534-2-1 MOD) P

4、reface This preface, as well as all footnotes and annexes, is included for information purp oses and is not part of ANSI/ISA-75.01.01-2012 (60534-2-1 MOD). This Standard has been prepared as part of the service of ISA toward a goal of uniformity in the field of instrumentation. To be of real value,

5、this document should not be static but should b e subject to periodic review. Toward this end, the Society welcomes all comments and criticisms and asks that they be addressed to the Secretary, Standards and Practices Board; ISA; 67 Alexander Drive; P. O. Box 12277; Research Triangle Park, NC 27709;

6、 Telephone (919) 549-8411; Fax (919) 549-8288; E-mail: standardsisa.org. The ISA Standards and Practices Department is aware of the growing need for attention to the metric system of units in general, and the International System of Units (SI) in particular , in the preparation of instrumentation st

7、andards. The Department is further aware of the benefits to USA users of ISA standards of incorporating suitable references to the SI (and the metric system) in their business and professional dealings with other countries. Toward this end, this Department will endeavour to introduce SI-acceptable m

8、etric units in all new and revised standards, recommended practices, and technical reports to the greatest extent possible. IEEE/ASTM SI 10, American National Standard for Metric Practice, and future revisions, will be the reference guide for definitions, symbols, abbreviations, and conversion facto

9、rs. It is the policy of ISA to encourage and welcome the participation of all concerned individuals and interests in the development of ISA standards, recommended practices, and technical reports. Participation in the ISA standards-making process by an individual in no way constitutes endorsement by

10、 the employer of that individual, of ISA, or of any of the standards, recommend ed practices, and technical reports that ISA develops. CAUTION ISA DOES NOT TAKE ANY POSITION WITH RESPECT TO THE EXISTENCE OR VALIDITY OF ANY PATENT RIGHTS ASSERTED IN CONNECTION WITH THIS DOCUMENT, AND ISA DISCLAIMS LI

11、ABILITY FOR THE INFRINGEMENT OF ANY PATENT RESULTING FROM THE USE OF THIS DOCUMENT. USERS ARE ADVISED THAT DETERMINATION OF THE VALIDITY OF ANY PATENT RIGHTS, AND THE RISK OF INFRINGEMENT OF SUCH RIGHTS, IS ENTIRELY THEIR OWN RESPONSIBILITY. PURSUANT TO ISAS PATENT POLICY, ONE OR MORE PATENT HOLDERS

12、 OR PATENT APPLICANTS MAY HAVE DISCLOSED PATENTS THAT COULD BE INFRINGED BY USE OF THIS DOCUMENT AND EXECUTED A LETTER OF ASSURANCE COMMITTING TO THE GRANTING OF A LICENSE ON A WORLDWIDE, NON-DISCRIMINATORY BASIS, WITH A FAIR AND REASONABLE ROYALTY RATE AND FAIR AND REASONABLE TERMS AND CONDITIONS.

13、FOR MORE INFORMATION ON SUCH DISCLOSURES AND LETTERS OF ASSURANCE, CONTACT ISA OR VISIT WWW.ISA.ORG/STANDARDSPATENTS. OTHER PATENTS OR PATENT CLAIMS MAY EXIST FOR WHICH A DISCLOSURE OR LETTER OF ASSURANCE HAS NOT BEEN RECEIVED. ISA IS NOT RESPONSIBLE FOR IDENTIFYING PATENTS OR PATENT APPLICATIONS FO

14、R WHICH A LICENSE MAY BE REQUIRED, FOR CONDUCTING INQUIRIES INTO THE LEGAL VALIDITY OR SCOPE OF PATENTS, OR DETERMINING WHETHER ANY LICENSING TERMS OR CONDITIONS PROVIDED IN CONNECTION WITH SUBMISSION OF A LETTER OF ASSURANCE, IF ANY, OR IN ANY LICENSING AGREEMENTS ARE REASONABLE OR NON-DISCRIMINATO

15、RY. ANSI/ISA-75.01.01-2012 (60534-2-1 MOD) 4 ISA REQUESTS THAT ANYONE REVIEWING THIS DOCUMENT WHO IS AWARE OF ANY PATENTS THAT MAY IMPACT IMPLEMENTATION OF THE DOCUMENT NOTIFY THE ISA STANDARDS AND PRACTICES DEPARTMENT OF THE PATENT AND ITS OWNER. ADDITIONALLY, THE USE OF THIS DOCUMENT MAY INVOLVE H

16、AZARDOUS MATERIALS, OPERATIONS OR EQUIPMENT. THE DOCUMENT CANNOT ANTICIPATE ALL POSSIBLE APPLICATIONS OR ADDRESS ALL POSSIBLE SAFETY ISSUES ASSOCIATED WITH USE IN HAZARDOUS CONDITIONS. THE USER OF THIS DOCUMENT MUST EXERCISE SOUND PROFESSIONAL JUDGMENT CONCERNING ITS USE AND APPLICABILITY UNDER THE

17、USERS PARTICULAR CIRCUMSTANCES. THE USER MUST ALSO CONSIDER THE APPLICABILITY OF ANY GOVERNMENTAL REGULATORY LIMITATIONS AND ESTABLISHED SAFETY AND HEALTH PRACTICES BEFORE IMPLEMENTING THIS DOCUMENT. THE USER OF THIS DOCUMENT SHOULD BE AWARE THAT THIS DOCUMENT MAY BE IMPACTED BY ELECTRONIC SECURITY

18、ISSUES. THE COMMITTEE HAS NOT YET ADDRESSED THE POTENTIAL ISSUES IN THIS VERSION. The following people served as members of ISA Subcommittee ISA75.01: NAME COMPANY T. George, Chair Richards Industries W. Weidman, Managing Director WCW Consulting H. Baumann H B Services Partners LLC H. Boger Masoneil

19、an Dresser G. Borden Consultant S. Boyle Metso Automation USA Inc. E. Bunke Badger Meter C. Crawford Consultant J. Faramarzi Control Components Inc. A. Glenn Flowserve Corp. H. Hoffmann Consultant J. Kiesbauer Samson Aktiengesellschaft J. McCaskill Expro Group A. McCauley Chagrin Valley Controls Inc

20、. V. Mezzano Fluor Corp. J. Reed Consultant J. Reid Cashco Inc. M. Riveland Emerson Process Management E. Skovgaard Control Valve Solutions F. Volpe Masoneilan Dresser J. Young The Dow Chemical Company 5 ANSI/ISA-75.01.01-2012 (60534-2-1 MOD) The following people served as members of ISA Committee I

21、SA75: NAME COMPANY J. Young, Chair The Dow Chemical Company W. Weidman, Managing Director WCW Consulting L. Al-Awami Saudi Aramco H. Baumann H B Services Partners LLC J. Beall Emerson Process Management M. Bober Copes-Vulcan H. Boger GE Energy G. Borden Consultant S. Boyle Metso Automation USA Inc.

22、J. Broyles Enbridge Pipelines Inc. F. Cain Flowserve Corp. R. Duimstra Fisher Controls Intl. Inc. J. Faramarzi Control Components Inc. T. George Richards Industries C. Hergert Kellogg Brown any IEC National Committee interested in the subject dealt with may participate in this preparatory work. Inte

23、rnational, governmental and non-governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely with the International Organization for Standardization (ISO) in accordance with conditions determined by agreement between the two organizations. 2) The fo

24、rmal decisions or agreements of IEC on technical matters express, as nearly as possible, an international consensus of opinion on the relevant subjects since each technical committee has representation from all interested IEC National Committees. 3) IEC Publications have the form of recommendations

25、for international use and are accepted by IEC National Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any misinterpretation by any end user.

26、 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications transparently to the maximum extent possible in their national and regional publications. Any divergence between any IEC Publication and the corresponding national or regional publication sh

27、all be clearly indicated in the latter. 5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any services carried out by independent cert

28、ification bodies. 6) All users should ensure that they have the latest edition of this publication. 7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and members of its technical committees and IEC National Committees for any personal in

29、jury, property damage or other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC Publications. 8) Attention is drawn to the Normative references

30、 cited in this publication. Use of the refere nced publications is indispensable for the correct application of this publication. 9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of patent rights. IEC shall not be held responsible for iden

31、tifying any or all such patent rights. International Standard IEC 60534-2-1 has been prepared by subcommittee 65B: Measurement and control devices, of IEC technical committee 65: Industrial-process measurement, control and automation. This second edition cancels and replaces the first edition publis

32、hed in 1998. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: the same fundamental flow model, but changes the equation framework to simplify the use of the standard by introducing the notion of Psi

33、zing; changes to the non-turbulent flow corrections and means of computing results; ANSI/ISA-75.01.01-2012 (60534-2-1 MOD) 10 multi-stage sizing as an Annex. The text of this standard is based on the following documents: FDIS Report on voting 65B/783/FDIS 65B/786/RVD Full information on the voting f

34、or the approval of this standard can be found in the report on voting indicated in the above table. This publication has been drafted in accordance with the ISO/IEC Directives, Part 2. A list of all the parts of the IEC 60534 series, under the general title Industrial-process control valves, can be

35、found on the IEC website. The committee has decided that the contents of this publication will remain unchanged until th e stability date indicated on the IEC web site under “http:/webstore.iec.ch“ in the data related to the specific publication. At this date, the publication will be reconfirmed, wi

36、thdrawn, replaced by a revised edition, or amended. 11 ANSI/ISA-75.01.01-2012 (60534-2-1 MOD) INDUSTRIAL-PROCESS CONTROL VALVES Part 2-1: Flow capacity Sizing equations for fluid flow under installed conditions 1 Scope This standard includes equations for predicting the flow of compressible and inco

37、mpressible fluids through control valves. The equations for incompressible flow are based on standard hydrodynamic equations for Newtonian incompressible fluids. They are not intended for use when non-Newtonian fluids, fluid mixtures, slurries or liquid-solid conveyance systems are encountered. The

38、equations for incompressible flow may be used with caution for non-vaporizing multi-component liquid mixtures. Refer to Clause 6 for additional information. At very low ratios of pressure differential to absolute inlet pressure (P/P1), compressible fluids behave similarly to incompressible fluids. U

39、nder such conditions, the sizing equations for compressible flow can be traced to the standard hydrodynamic equations for Newtonian incompressible fluids. However, increasing values of P/P1 result in compressibility effects which require that the basic equations be modified by appropriate correction

40、 factors. The equations for compressible fluids are for use with ideal gas or vapor and are not intended for use with multiphase streams such as gas-liquid, vapor-liquid or gas-solid mixtures. Reasonable accuracy can only be maintained when the specific heat ratio, , is restricted to the range 1.08

41、1.65. Refer to Clause 7.2 for more information. For compressible fluid applications, this standard is valid for valves with xT 0.84 (see Table D.2). For valves with xT 0.84 (e.g. some multistage valves), greater inaccuracy of flow prediction can be expected. Reasonable accuracy can only be maintaine

42、d for control valves if: 0470218 .dN C Note that while the equation structure utilized in this document departs radically from previous versions of the standard, the basic technology is relatively unchanged. The revised equation format was adopted to simplify presentation of the various equations an

43、d improve readability of the document. The accuracy of results computed with the equations in this standard will be governed by the accuracy of the constituent coefficients and the process data supplied. Methods of evaluating the coefficients used in the equations presented herein are given in IEC 6

44、0534-2-1. The stated accuracy associated with the coefficients in that document is 5% when Cv /d 2 0.047 N18. Reasonable accuracy can only be maintained for control valves if Cv /d 2 0.047 N18. ANSI/ISA-75.01.01-2012 (60534-2-1 MOD) 12 2 Normative references The following referenced documents are in

45、dispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. IEC 60534-1:2005, Industrial-process control valves Part 1: Control valve terminology and

46、general considerations IEC 60534-2-3:1997, Industrial-process control valves Part 2-3: Flow capacity Test procedures ANSI/ISA-75.02.01-2008 (IEC 60534-2-3 Mod), Control Valve Capacity Test Procedures ANSI/ISA-75.05.01-2000 (R2005), Control Valve Terminology 3 Terms and definitions For the purposes o

47、f this document, the terms and definitions given in IEC 60534-1, and the following apply. 3.1 valve style modifier the ratio of the hydraulic diameter of a single flow passage to the diameter of a circular orifice, the area of which is equivalent to the sum of areas of all identical flow passages at

48、 a given travel. It should be stated by the manufacturer as a function of travel (see Annex A). 3.2 standard volumetric flowrates compressible fluid volumetric flow rates in cubic meters per hour, identified by the symbol QS, refer to either a) Standard conditions, which is an absolute pressure of 1

49、,013.25 mbar and a temperature of 288.6 K, or b) Normal conditions, which is an absolute pressure of 1,013.25 mbar and a temperature of 273 K. Numerical constants for the flow equations are provided for both conventions (see Table 1). 13 ANSI/ISA-75.01.01-2012 (60534-2-1 MOD) 4 Symbols Symbol Description Unit C Flow coefficient (Kv, Cv) Various (see IEC 60534-1) (see Note 4) d Nominal valve size mm (in) D Internal diameter of the piping mm (in) D1 Internal diameter of upstream piping mm (in) D2 Internal diameter of

展开阅读全文
相关资源
  • ANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdfANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdf
  • ANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdfANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdf
  • ANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdfANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdf
  • ANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdfANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdf
  • ANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdfANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdf
  • ANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdfANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdf
  • ANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdfANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdf
  • ANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdfANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdf
  • ANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdfANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdf
  • ANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdfANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ANSI

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1