ANSI NEIS 406-2003 Standard for Installing Residential Generator Sets.pdf

上传人:fuellot230 文档编号:437451 上传时间:2018-11-14 格式:PDF 页数:30 大小:1.51MB
下载 相关 举报
ANSI NEIS 406-2003 Standard for Installing Residential Generator Sets.pdf_第1页
第1页 / 共30页
ANSI NEIS 406-2003 Standard for Installing Residential Generator Sets.pdf_第2页
第2页 / 共30页
ANSI NEIS 406-2003 Standard for Installing Residential Generator Sets.pdf_第3页
第3页 / 共30页
ANSI NEIS 406-2003 Standard for Installing Residential Generator Sets.pdf_第4页
第4页 / 共30页
ANSI NEIS 406-2003 Standard for Installing Residential Generator Sets.pdf_第5页
第5页 / 共30页
亲,该文档总共30页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Standard for InstallingResidentialGenerator SetsNECA 406-2003AMERICAN NATIONAL STANDARDPublished byNational Electrical Contractors AssociationStandard for InstallingResidentialGenerator SetsNECA 406-2003An AmericanNational StandardPublished byNational Electrical Contractors Associationiii nForeword

2、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .v1. Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.1 Equipment Included . . . . . . .

3、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.2 Equipment Excluded . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.3 Related Items . . . . . .

4、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.4 Regulatory and Other Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12. Planning the Installatio

5、n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22.1 Whole House Design (One Panelboard) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22.2 Essential Loads Design (Two Panelboards) . . . . . .

6、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22.3 Generator Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33. Selecting Other System Components . . . . . . . . . . .

7、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93.1 Generator Output Conductors (Feeder) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .93.2 Transfer Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .93.3 Generator Disconnect Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .113.4 Utility Disconnect Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .113.5 Essential Loads Panelboard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .114. Installing the Generator Set and Associated Components . . . . . . . . . . . . . .

10、 . . . . . . . . . . . 124.1 Generator Set . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 124.2 Load Transfer Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

11、 . . . . . . . . . . . . . . . . . . . 134.3 Generator Disconnect Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 134.4 Utility Disconnect Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

12、 . . . . . . . . . . . . . . . . . . . 134.5 Control Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .144.6 Essential Loads PanelboardLocation and Electrical Subfeed . . . . . . . . . . . . . . . . . . .

13、 . . . . . . . . . . . 145. Electrical Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15 5.1 One Panelboard (Whole House Design) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15 5.

14、2 Two Panelboards (Essential Loads Design) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 155.3 Control Circuitry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 166.

15、Final Installation Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17 6.1 Generator Set Fuel Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 176.2 Generator Set Bat

16、tery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17 6.3 Generator Set Coolant and Lubricant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 177. Energizing and Tes

17、ting the Generator Set . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .187.1 Pre-Energizing Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 187.2 Starting Engine for the First Time . . . . . .

18、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 187.3 Engine Governor Adjustment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18Table of Contents7.4 Voltage Regulator Adjustment . . .

19、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 197.5 Performance Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 198. Final Procedures . . . . . . . .

20、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .208.1 Site Clean-Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .208.2 Punchlist and Acceptance . . . . . . . .

21、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20Annex A: Reference Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21NECA 406 Standard for Installing Residential Generator Setsn i

22、vv nNational Electrical Installation Standards are intend-ed to improve communication among specifiers, pur-chasers, and suppliers of electrical construction ser-vices. They define a minimum baseline of qualityand workmanship for installing electrical productsand systems. NEIS are intended to be ref

23、erenced incontract documents for electrical construction pro-jects. The following language is recommended:Generator sets for on-site power generation atone-family dwellings shall be installed in accor-dance with NECA 406-2003, Standard forInstalling Residential Generator Sets (ANSI).Use of NEIS is v

24、oluntary, and the National ElectricalContractors Association assumes no obligation or lia-bility to users of this publication. Existence of astandard shall not preclude any member or non-member of NECA from specifying or using alternateconstruction methods permitted by applicable regu-lations.This p

25、ublication is intended to comply with the edi-tion of the National Electrical Code (NEC) in effectat the time of publication. Because they are qualitystandards, NEIS may in some instances go beyondthe minimum requirements of the NEC. It is theresponsibility of users of this publication to complywith

26、 state and local electrical codes when installingelectrical products and systems.Suggestions for revisions and improvements to thisstandard are welcome. They should be addressed to:NECA Standards leaking ordamaged hoses should be re-tightened orreplaced as required. Check drive belts to insure they

27、are in good con-dition and properly tensioned; adjust or replaceas necessary. Check engine mounting bolts for tightness; re-tighten if necessary.7 . 2 Starting Engine for the First T i m ea) Insure that all pre-energizing procedures in 7.1have been completed correctly.b) Press the starter switch.c)

28、If engine fails to start within 30 seconds, releasethe starter switch and allow the starting motor tocool for two minutes before trying again.d) If engine fails to start after four attempts, conductan inspection to determine the cause.7 . 3 Engine Governor AdjustmentIf the generator AC output voltag

29、e or frequency areoutside of manufacturers specifications, adjust theengine governor following manufacturers instruc-tions.7. Energizing and Testing theGenerator Setn 18Energizing and Testing the Generator Set19 n7 . 4 Voltage Regulator AdjustmentSome residential generators are equipped with volt-ag

30、e regulators in addition to engine governors. If theoutput AC power frequency is correct but the voltageis not within the specified tolerances, adjust the volt-age regulator following manufacturers instructions.7 . 5 Performance Te s t i n ga) For routine operational checks and load tests, runthe en

31、gine at no load for about five minutes to warmup.b) Apply a load equal to or greater than 35 percentof the generator nameplate rating.c) Operate the unit until temperatures stabilize.8 . 1 Site Clean-Upa) Vacuum all scrap, wire, dust and other debrisfrom the generator, transfer switch, panelboard(s)

32、and associated equipment. Do not use compressedair to blow debris out of the generator, since is maycause debris to settle inside devices and impair theirability to function.b) Replace all parts and covers. Check for anypinched wires and close all doors. Make sure theenclosure parts are properly al

33、igned and fastenedsecurely.c) When recycling options are available at the jobsite, separate used packing materials by type andrecycle them.d) Dispose of non-recyclable packing materialsappropriately.8 . 2 Punchlist and Acceptancea) Walk through project with owner/architect/gener-al contractor.b) Tou

34、ch-up and repair all minor defects.c) Turn over all manuals, spare parts, and a set ofspecial tools (where required) for generator adjust-ments or tamper-proof hardware, to the owner/archi-tect/general contractor owner. Obtain a deliveryreceipt.8. Final Proceduresn 2021 nThis publication, when used

35、in conjunction with the National Electrical Code and generator manufacturers lit-erature, provides sufficient information to install and maintain generator sets. The following publications mayalso provide useful information:National Fire Protection Association1 Batterymarch ParkP.O. Box 9101Quincy,

36、Massachusetts 02269-9101(617) 770-3000 tel(617) 770-3500 faxwww.nfpa.orgNFPA 37-2002, Standard for the Installation and Use of Stationary Combustion Engines and Gas TurbinesNFPA 70-2002, National Electrical Code (ANSI)NFPA 110-1999, Emergency and Standby Power Systems (ANSI)National Electrical Manuf

37、acturers Association1700 North Thirteenth Street, Suite 1847Rosslyn, VA 22209(703) 841-3200 tel(703) 841-3300 faxwww.nema.orgMG 2-1989 (R1994), Safety Standard for Construction and Guide for Selection, Installation, and Use of ElectricMotors and GeneratorsCurrent National Electrical Installation Sta

38、ndards published by NECA:NECA 1-2000, Standard Practices for Good Workmanship in Electrical Contracting (ANSI)NECA 100-1999, Symbols for Electrical Construction Drawings (ANSI)NECA 101-2001, Standard for Installing Steel Conduits (Rigid, IMC, EMT)NECA/AA 104-2000, Recommended Practice for Installing

39、 Aluminum Building Wire and Cable (ANSI)NECA/NEMA 105-2002, Recommended Practice for Installing Metal Cable Tray Systems (ANSI)NECA 111-2003, Standard for Installing Nonmetallic Raceways (RNC, ENT, LFNC) (ANSI)NECA 200-2002, Recommended Practice for Installing and Maintaining Temporary Electrical Po

40、wer atConstruction Sites (ANSI)Annex A: Reference Standards(This annex is not part of the standard)NECA 202-2001, Recommended Practice for Installing and Maintaining Industrial Heat Tracing Systems (ANSI)NECA 230-2003, Standard for Selecting, Installing and Maintaining Electric Motors and Motor Cont

41、rollers(ANSI)NECA/FOA 301-1998, Standard for Installing and Testing Fiber Optic CablesNECA 305-2001, Standard for Fire Alarm System Job Practices (ANSI)NECA 400-1998, Recommended Practice for Installing and Maintaining Switchboards (ANSI)NECA 402-2001, Recommended Practice for Installing and Maintai

42、ning Motor Control Centers (ANSI)NECA/EGSA 404-2000, Recommended Practice for Installing Generator Sets (ANSI)NECA 405-2001, Recommended Practice for Installing and Commissioning Interconnected Generation Systems(ANSI)NECA 406-2003, Standard for Installing Residential Generator Sets (ANSI)NECA 407-2

43、002, Recommended Practice for Installing and Maintaining Panelboards (ANSI)NECA 408-2002, Recommended Practice for Installing and Maintaining Busways (ANSI)NECA 409-2002, Recommended Practice for Installing and Maintaining Dry-Type Transformers (ANSI)NECA/IESNA 500-1998, Recommended Practice for Ins

44、talling Indoor Commercial Lighting Systems (ANSI)NECA/IESNA 501-2000, Recommended Practice for Installing Exterior Lighting Systems (ANSI)NECA/IESNA 502-1999, Recommended Practice for Installing Industrial Lighting Systems (ANSI)NECA/BICSI 568-2001, Standard for Installing Commercial Building Teleco

45、mmunications Cabling (ANSI)NECA/MACSCB 600-2003, Recommended Practice for Installing and Maintaining Medium-Voltage Cable (ANSI)NECA 406 Standard for Installing Residential Generator Setsn 22National ElectricalContractors Association3 Bethesda Metro CenterSuite 1100 Bethesda, MD 20814301-657-3110 fax: 301-215-4500www.neca-neis.orgStandards & SafetyIndex: NECA 4067K/2-04NATIONAL ELECTRICAL INSTALLATION STANDARDS

展开阅读全文
相关资源
  • ANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdfANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdf
  • ANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdfANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdf
  • ANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdfANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdf
  • ANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdfANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdf
  • ANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdfANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdf
  • ANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdfANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdf
  • ANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdfANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdf
  • ANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdfANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdf
  • ANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdfANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdf
  • ANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdfANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdf