ANSI TIA-41.690-E-2005 Mobile Application Part (MAP)- Operation Timer Values《系统间无线电通信.定时器》.pdf

上传人:orderah291 文档编号:438504 上传时间:2018-11-14 格式:PDF 页数:22 大小:310.21KB
下载 相关 举报
ANSI TIA-41.690-E-2005 Mobile Application Part (MAP)- Operation Timer Values《系统间无线电通信.定时器》.pdf_第1页
第1页 / 共22页
ANSI TIA-41.690-E-2005 Mobile Application Part (MAP)- Operation Timer Values《系统间无线电通信.定时器》.pdf_第2页
第2页 / 共22页
ANSI TIA-41.690-E-2005 Mobile Application Part (MAP)- Operation Timer Values《系统间无线电通信.定时器》.pdf_第3页
第3页 / 共22页
ANSI TIA-41.690-E-2005 Mobile Application Part (MAP)- Operation Timer Values《系统间无线电通信.定时器》.pdf_第4页
第4页 / 共22页
ANSI TIA-41.690-E-2005 Mobile Application Part (MAP)- Operation Timer Values《系统间无线电通信.定时器》.pdf_第5页
第5页 / 共22页
亲,该文档总共22页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、 TIA-41.690-E (Revision of TIA/EIA-41-D) December 2005Mobile Application Part (MAP)- Operation Timer Values ANSI/TIA-41.690-E-2012 APPROVED: NOVEMBER 16, 2005 REAFFIRMED: MAY 3, 2012 NOTICE TIA Engineering Standards and Publications are designed to serve the public interest through eliminating misun

2、derstandings between manufacturers and purchasers, facilitating interchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for their particular need. The existence of such Standards and Publications shall not in any re

3、spect preclude any member or non-member of TIA from manufacturing or selling products not conforming to such Standards and Publications. Neither shall the existence of such Standards and Publications preclude their voluntary use by Non-TIA members, either domestically or internationally. Standards a

4、nd Publications are adopted by TIA in accordance with the American National Standards Institute (ANSI) patent policy. By such action, TIA does not assume any liability to any patent owner, nor does it assume any obligation whatever to parties adopting the Standard or Publication. This Standard does

5、not purport to address all safety problems associated with its use or all applicable regulatory requirements. It is the responsibility of the user of this Standard to establish appropriate safety and health practices and to determine the applicability of regulatory limitations before its use. (From

6、Project No. ANSI/TIA-PN-41.690-E-RF1, formulated under the cognizance of the TIA TR-45 Mobile (b) there is no assurance that the Document will be approved by any Committee of TIA or any other body in its present or any other form; (c) the Document may be amended, modified or changed in the standards

7、 development or any editing process. The use or practice of contents of this Document may involve the use of intellectual property rights (“IPR”), including pending or issued patents, or copyrights, owned by one or more parties. TIA makes no search or investigation for IPR. When IPR consisting of pa

8、tents and published pending patent applications are claimed and called to TIAs attention, a statement from the holder thereof is requested, all in accordance with the Manual. TIA takes no position with reference to, and disclaims any obligation to investigate or inquire into, the scope or validity o

9、f any claims of IPR. TIA will neither be a party to discussions of any licensing terms or conditions, which are instead left to the parties involved, nor will TIA opine or judge whether proposed licensing terms or conditions are reasonable or non-discriminatory. TIA does not warrant or represent tha

10、t procedures or practices suggested or provided in the Manual have been complied with as respects the Document or its contents. If the Document contains one or more Normative References to a document published by another organization (“other SSO”) engaged in the formulation, development or publicati

11、on of standards (whether designated as a standard, specification, recommendation or otherwise), whether such reference consists of mandatory, alternate or optional elements (as defined in the TIA Engineering Manual, 4thedition) then (i) TIA disclaims any duty or obligation to search or investigate t

12、he records of any other SSO for IPR or letters of assurance relating to any such Normative Reference; (ii) TIAs policy of encouragement of voluntary disclosure (see Engineering Manual Section 6.5.1) of Essential Patent(s) and published pending patent applications shall apply; and (iii) Information a

13、s to claims of IPR in the records or publications of the other SSO shall not constitute identification to TIA of a claim of Essential Patent(s) or published pending patent applications. TIA does not enforce or monitor compliance with the contents of the Document. TIA does not certify, inspect, test

14、or otherwise investigate products, designs or services or any claims of compliance with the contents of the Document. ALL WARRANTIES, EXPRESS OR IMPLIED, ARE DISCLAIMED, INCLUDING WITHOUT LIMITATION, ANY AND ALL WARRANTIES CONCERNING THE ACCURACY OF THE CONTENTS, ITS FITNESS OR APPROPRIATENESS FOR A

15、 PARTICULAR PURPOSE OR USE, ITS MERCHANTABILITY AND ITS NONINFRINGEMENT OF ANY THIRD PARTYS INTELLECTUAL PROPERTY RIGHTS. TIA EXPRESSLY DISCLAIMS ANY AND ALL RESPONSIBILITIES FOR THE ACCURACY OF THE CONTENTS AND MAKES NO REPRESENTATIONS OR WARRANTIES REGARDING THE CONTENTS COMPLIANCE WITH ANY APPLIC

16、ABLE STATUTE, RULE OR REGULATION, OR THE SAFETY OR HEALTH EFFECTS OF THE CONTENTS OR ANY PRODUCT OR SERVICE REFERRED TO IN THE DOCUMENT OR PRODUCED OR RENDERED TO COMPLY WITH THE CONTENTS. TIA SHALL NOT BE LIABLE FOR ANY AND ALL DAMAGES, DIRECT OR INDIRECT, ARISING FROM OR RELATING TO ANY USE OF THE

17、 CONTENTS CONTAINED HEREIN, INCLUDING WITHOUT LIMITATION ANY AND ALL INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES (INCLUDING DAMAGES FOR LOSS OF BUSINESS, LOSS OF PROFITS, LITIGATION, OR THE LIKE), WHETHER BASED UPON BREACH OF CONTRACT, BREACH OF WARRANTY, TORT (INCLUDING NEGLIGENCE), PROD

18、UCT LIABILITY OR OTHERWISE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. THE FOREGOING NEGATION OF DAMAGES IS A FUNDAMENTAL ELEMENT OF THE USE OF THE CONTENTS HEREOF, AND THESE CONTENTS WOULD NOT BE PUBLISHED BY TIA WITHOUT SUCH LIMITATIONS. REVISION HISTORY Copyright Telecommunications Indus

19、try Association 2005, All rights reserved.This document is subject to change.Revision Date RemarksIS-41-D December 1997 Initial ANSI publication.TIA-41.690-E July 2005 Initial publication with new part structure.TIA-41.690-E1234567891011121314151617181920212223242526272829303132333435363738394041424

20、34445464748495051525354555657585960690 -1 OPERATION TIMER VALUESPART 690OPERATION TIMER VALUESThe following table provides a summary of the timers used for MAP operations. The timer valuesspecified in this table are default values only and should be optimized for actual operatingenvironments. Some t

21、imers are locally defined and are not in this table (e.g., alerting timer, noanswer timer, page response timer, maximum interaction timer, interdigit timer).1 OPERATION TIMER VALUESTable 1 Operation Timer Values Timer Default (sec.)Started when Normally stopped when Action when timer expiresADT Auth

22、entication Directive Timer6 AuthenticationDirective INVOKE is sent.AuthenticationDirective RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.ADTF Authentication Directive Forward Timer15 AuthenticationDirective-Forward INVOKE is sent.AuthenticationDirective-Forward RETURN RESULT

23、or RETURN ERROR is received.Execute recovery procedures.AFRT Authentication Failure Report Timer6 AuthenticationFailure-Report INVOKE is sent.AuthenticationFailure-Report RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.ANZTAnalyzed Information Timer16 AnalyzedInformation INVOKE

24、 (or a subsequent RemoteUserInteraction-Directive RETURN RESULT) is sent, or a subsequent Disconnect-Resource INVOKE is received.AnalyzedInformation RETURN RESULT or RETURN ERROR is received, RemoteUser-InteractionDirective INVOKE is received, or ConnectResource INVOKE is received.Execute recovery p

25、rocedures.ART Authentication Request Timer6 AuthenticationRequest INVOKE is sent.AuthenticationRequest RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.ASRRT Authenti-cation Status Report Response Timer24 An Authentication operation that requires an Authentica-tionStatusReport r

26、eply is sent.Authentication Status Report INVOKE is received.Execute recovery procedures.TIA-41.690-EOPERATION TIMER VALUES123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960690 -2ASRT Authentication Status Report Timer6 AuthenticationStatu

27、s-Report INVOKE is sent.Authentication Status Report RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.BDT Bulk Deregis-tration TImer6 BulkDeregistration INVOKE is sent.BulkDeregistration RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.BSCT Base Station Chal

28、lenge Timer3 (see a)BaseStationChallenge INVOKE is sent.BaseStationChallenge RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.CFTChange Facilities Timer7 ChangeFacilities INVOKE is sent.ChangeFacilities RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.CRT Co

29、unt Request Timer6 Count Request INVOKE is sent.Count Request RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.CSTChange Service Timer13 ChangeService INVOKE is sent.ChangeService RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.CTT Clear Trunk Timer4 to 15

30、FacilitiesRelease INVOKE is sent.FacilitiesRelease RETURN RESULT or RETURN ERROR is received.see Part 640, sec. 18.1FAVTFacility Selected And Available Timer16 FacilitySelectedAnd-Available INVOKE is sent.FacilitySelectedAnd-Available RETURN RESULT or RETURN ERROR is received.Execute recovery proced

31、ures.FRRTFeature Request Response Timer16 FeatureRequest INVOKE (or a subsequent Remote-UserInteractionDirective RETURN RESULT) is sent.FeatureRequest RETURN RESULT, FeatureRequest RETURN ERROR, or a RemoteUser-InteractionDirective INVOKE is received.Execute recovery procedures.FRT Flash Request Tim

32、er3 MSC transmits a FlashRe-quest INVOKE.FlashRequest RETURN RESULT or RETURN ERROR is received.see Part 640, sec. 21.1HOT Handoff Order Timer12 (see b)Serving MSC sends FacilitiesDirective INVOKE or HandoffBack INVOKE to Target MSC.FacilitiesDirective or HandoffBack RETURN RESULT or RETURN ERROR is

33、 received.see Part 640, sec. 16.1see Part 640, sec. 17.1HTTRT Handoff-To-Third Result Timer7 (see c)Serving MSC receives Handoff-To-Third RETURN RESULT.FacilitiesRelease INVOKE is received.see Part 640, sec. 26.1see Part 640, sec. 27.1Table 1 (Continued)Operation Timer Values TIA-41.690-E12345678910

34、1112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960690 -3 OPERATION TIMER VALUESHTTT Handoff-To-Third Timer18 (see b)Handoff-To-Third INVOKE is sent.Handoff-To-Third RETURN RESULT or RETURN ERROR is received.see Part 640, sec. 26.1see Part 640, sec. 2

35、7.1IDT InformationDirective Timer6 InformationDirective INVOKE is sent.InformationDirective RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.IFT Information Forward Timer6 InformationForward INVOKE is sent.InformationForward RETURN RESULT or RETURN ERROR is received.Execute reco

36、very procedures.IRTInstruction Request Timer6 InstructionRequest INVOKE (or a subsequent SRFDirective RETURN RESULT) is sent.InstructionRequest RETURN RESULT or RETURN ERROR is received, or SRFDirective INVOKE is received.Execute recovery procedures.ISART Intersystem Answer Response Timer78 Affirmat

37、ive InterSystem-Setup RETURN RESULT is received.InterSystem Answer INVOKE is received.Execute recovery procedures.ISAT Intersystem Answer Timer7 InterSystemAnswer INVOKE is sent.InterSystemAnswer RETURN RESULT is received.Execute recovery procedures.ISPRT Intersystem Page Request Timer13 InterSystem

38、Page or InterSystemPage2 INVOKE is sent.InterSystemPage or InterSystemPage2 RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.ISSRTIntersystem Setup Timer15 IntersystemSetup INVOKE is sent.IntersystemSetup RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.ISSW

39、T Intersystem Setup Wait Timer60 InterSystemPage2 RETURN RESULT is sent.IntersystemSetup INVOKE is received.Execute recovery procedures.LMMRT Location Measurement Maximum Response Timer7 Serving MSC requests handoff measurements from the Candidate MSC.Serving MSC receives handoff measurements from t

40、he Candidate MSC.see Part 640, sec. 23.1Table 1 (Continued)Operation Timer Values TIA-41.690-EOPERATION TIMER VALUES123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960690 -4LRTLocation Request Timer16 LocationRequest INVOKE (or a subsequent

41、 Remote-UserInteractionDirective RETURN RESULT) is sent, or a subsequent DisconnectResource INVOKE is received, or when a ConnectionFailure-Report INVOKE is sent.LocationRequest RETURN RESULT, Location Request RETURN ERROR, or a RemoteUserInteraction-Directive INVOKE, or a ConnectResource INVOKE is

42、received.Apply appro-priate access denial treatment.MAHT Mobile Access Hunt Timer30 (see d)MAH context is created or extended.MAH context is closed. Release MAH context.MAT Mobile Arrival Timer7 (see c)Target MSC replies affirmatively to Serving MSC handoff request.Target MSC receives MS on the desi

43、gnated voice channel.see Part 640, sec. 17.3see Part 640, sec. 17.3see Part 640, sec. 22.3see Part 640, sec. 23.3MDTMessage Directive Timer6 MessageDirective INVOKE is sent.MessageDirective RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.MHOT Mobile Handoff Order7 (see c)Servin

44、g MSC receives affirmative reply from Target MSC to handoff request.Target MSC indicates to serving MSC that MS is on channel.see Part 640, sec. 16.1see Part 640, sec. 17.1see Part 640, sec. 23.1see Part 640, sec. 26.4see Part 640, sec. 27.4MSIT MS Inactive TImer6 MSInactive INVOKE is sent. MSInacti

45、ve RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.MTModify Timer6 Modify INVOKE is sent. Modify RETURN RESULT or RETURN ERROR is received.Execute recovery procedures.NPTNumber Portability Request Timer6 NumberPortabilityRequest INVOKE is sent.NumberPortabilityRequest RETURN RE

46、SULT or RETURN ERROR is received.Use available information to route the call if possible (default routing).Table 1 (Continued)Operation Timer Values TIA-41.690-E123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960690 -5 OPERATION TIMER VALUE

47、SORTOrigination Request Timer16 OriginationRequest INVOKE (or a subsequent RemoteUser-InteractionDirective RETURN RESULT) is sent, or a DisconnectResource INVOKE is received or a ConnectionFailureReport INVOKE is sent.OriginationRequest RETURN RESULT, OriginationRequest RETURN ERROR, or a RemoteUser

48、-InteractionDirective INVOKE is received or a ConnectResource INVOKE is received.Execute recovery procedures.OTARTcsOTASPRequest Timer30 OTASPRequest INVOKE is sent with ACTCODE set to Generate A-key, Generate Public Encryption Key Values, or Release Resources.OTASPRequest RETURN RESULT is received.

49、Execute recovery procedures.OTARTclOTASPRequest Timer90 OTASPRequest INVOKE is sent with ACTCODE set to Perform SSD Update, Perform Re-Authentication, or Commit A-key.OTASPRequest RETURN RESULT is received.Execute recovery procedures.OTARTtOTASPRequest Response Timer30 OTASPRequest INVOKE is sent with ACTCODE set to Generate A-key, Generate Public Encryption Key Values, Commit A-key, or Release Resources.OTASPRequest RETURN RESULT or an OTASPRe-quest RETURN ERROR is received.Execute recovery procedures.OTARTtlOTASPRequest Response Timer90 OTASPRequest INVOKE is sent with ACTCODE se

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ANSI

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1