ANSI UL 1076-1995 UL Standard for Safety Proprietary Burglar Alarm Units and Systems (Fifth Edition Reprint with Revisions Through and Including March 20 2015).pdf

上传人:rimleave225 文档编号:438800 上传时间:2018-11-14 格式:PDF 页数:138 大小:1.03MB
下载 相关 举报
ANSI UL 1076-1995 UL Standard for Safety Proprietary Burglar Alarm Units and Systems (Fifth Edition Reprint with Revisions Through and Including March 20 2015).pdf_第1页
第1页 / 共138页
ANSI UL 1076-1995 UL Standard for Safety Proprietary Burglar Alarm Units and Systems (Fifth Edition Reprint with Revisions Through and Including March 20 2015).pdf_第2页
第2页 / 共138页
ANSI UL 1076-1995 UL Standard for Safety Proprietary Burglar Alarm Units and Systems (Fifth Edition Reprint with Revisions Through and Including March 20 2015).pdf_第3页
第3页 / 共138页
ANSI UL 1076-1995 UL Standard for Safety Proprietary Burglar Alarm Units and Systems (Fifth Edition Reprint with Revisions Through and Including March 20 2015).pdf_第4页
第4页 / 共138页
ANSI UL 1076-1995 UL Standard for Safety Proprietary Burglar Alarm Units and Systems (Fifth Edition Reprint with Revisions Through and Including March 20 2015).pdf_第5页
第5页 / 共138页
亲,该文档总共138页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL UL 1076 Proprietary Burglar Alarm Units and SystemsUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM ULUL COPYRIGHTED MATERIAL NOT AUTHORIZ

2、ED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL UL Standard for Safety for Proprietary Burglar Alarm Units and Systems, UL 1076 Fifth Edition, Dated September 29, 1995 Summary of Topics The revisions were issued to incorporate the revision to minimum spacing requirements. The

3、revised requirements are substantially in accordance with Proposal(s) on this subject dated October 7, 2011. Text that has been changed in any manner or impacted by ULs electronic publishing system is marked with a vertical line in the margin. Changes in requirements are marked with a vertical line

4、in the margin and are followed by an effective date note indicating the date of publication or the date on which the changed requirement becomes effective. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form by any means, elect

5、ronic, mechanical photocopying, recording, or otherwise without prior permission of UL. UL provides this Standard as is without warranty of any kind, either expressed or implied, including but not limited to, the implied warranties of merchantability or tness for any purpose. In no event will UL be

6、liable for any special, incidental, consequential, indirect or similar damages, including loss of prots, lost savings, loss of data, or any other damages arising out of the use of or the inability to use this Standard, even if UL or an authorized UL representative has been advised of the possibility

7、 of such damage. In no event shall ULs liability for any damage ever exceed the price paid for this Standard, regardless of the form of the claim. Users of the electronic versions of ULs Standards for Safety agree to defend, indemnify, and hold UL harmless from and against any loss, expense, liabili

8、ty, damage, claim, or judgment (including reasonable attorneys fees) resulting from any error or deviation introduced while purchaser is storing an electronic Standard on the purchasers computer system. The requirements in this Standard are now in effect, except for those paragraphs, sections, table

9、s, gures, and/or other elements of the Standard having future effective dates as indicated in the note following the affected item. The prior text for requirements that have been revised and that have a future effective date are located after the Standard, and are preceded by a SUPERSEDED REQUIREMEN

10、TS notice. The following table lists the future effective dates with the corresponding reference. MARCH 20, 2015 UL 1076 tr1UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL Future Effective Date Reference March 20, 2018 Table 23.1 MARCH 20, 2

11、015 UL 1076 tr2UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL SEPTEMBER 29, 1995 (Title Page Reprinted: March 20, 2015) 1 UL 1076 Standard for Proprietary Burglar Alarm Units and Systems The rst and second editions were titled Proprietary B

12、urglar Alarm Systems Units. First Edition July, 1974 Second Edition February, 1980 Third Edition March, 1982 Fourth Edition December, 1988 Fifth Edition September 29, 1995 This ANSI/UL Standard for Safety consists of the Fifth Edition including revisions through March 20, 2015. The most recent desig

13、nation of ANSI/UL 1076 as an American National Standard (ANSI) occurred on March 20, 2015. ANSI approval for a standard does not include the Cover Page, Transmittal Pages, Title Page, or effective date information. The Department of Defense (DoD) has adopted UL 1076 on April 9, 1992. The publication

14、 of revised pages or a new edition of this Standard will not invalidate the DoD adoption. Comments or proposals for revisions on any part of the Standard may be submitted to UL at any time. Proposals should be submitted via a Proposal Request in ULs On-Line Collaborative Standards Development System

15、 (CSDS) at http:/. ULs Standards for Safety are copyrighted by UL. Neither a printed nor electronic copy of a Standard should be altered in any way. All of ULs Standards and all copyrights, ownerships, and rights regarding those Standards shall remain the sole and exclusive property of UL. COPYRIGHT

16、 2015 UNDERWRITERS LABORATORIES INC. ANSI/UL 1076-2015UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL SEPTEMBER 10, 2010 PROPRIETARY BURGLAR ALARM UNITS AND SYSTEMS - UL 1076 2 No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR F

17、URTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL CONTENTS INTRODUCTION 1 Scope 8A 2 General 8B 2.1 Components 8B 2.2 Units of measurement .8B 2.3 Undated references .8B 2.4 Terminology 8C 3 Glossary 8C 4 Installation and Operating Instructions .10B 4A Installation and Operating Instruc

18、tions Physical Media 11 CONSTRUCTION ASSEMBLY 5 General .12 5.1 Product assembly .12 5.2 Electrical protection 12 6 Protection of Service Personnel .14 7 Enclosures 14 7.1 General 14 7.2 Doors and covers .15 7.3 Enclosure openings 15 7.4 Screens and expanded metal .18 7.5 Cast metal 18A 7.6 Sheet me

19、tal .18A 7.7 Product enclosure mounting .18A 7.8 Polymeric materials 21 8 Electric Shock .21 9 Corrosion Protection .22 FIELD WIRING CONNECTIONS 10 General 22 11 Cord-Connected Products .22 12 Permanently-Connected Products .23 12.1 General .23 12.2 Field-wiring terminals .24 12.3 Leads .26 12.4 Pol

20、arity identication 27 13 Grounding .27 INTERNAL WIRING 14 General 28 15 Wiring Methods .28 16 Separation of Circuits .29 17 Bonding for Grounding 29 SEPTEMBER 10, 2010 PROPRIETARY BURGLAR ALARM UNITS AND SYSTEMS - UL 1076 3UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTI

21、ON WITHOUT PERMISSION FROM UL COMPONENTS, ELECTRICAL 18 General 32 18.1 Mounting of components 32 18.2 Insulating materials .33 18.3 Fuseholders .33 18.4 Current-carrying parts .34 19 Overcurrent Protection 34 20 Semiconductors 34 21 Switches .34 22 Transformers and Coils 35 SPACINGS 23 General 35 2

22、4 Components 36A PERFORMANCE ALL UNITS 25 General 37 25.1 Test units and data .37 25.2 Test samples and miscellaneous data 37 25.3 Test voltages 37 25.4 FCC requirements 38 25A Central Supervisory Station Equipment .38 26 Normal Operation Test .38A 27 Current Protection Test 38B 28 Input Test 38B 29

23、 Output Measurement Test 38B 30 Electrical Supervision Test .39 31 Undervoltage Operation Test .39 32 Overvoltage Operation Test 40 33 Variable Ambient Test .40 34 Humidity Test 40 35 Electric Shock Current Test 41 36 Leakage Current Tests for Cord-Connected Products .46 37 Overload Test .48A 37.1 G

24、eneral 48A 37.2 Separately Energized Circuits 48A 38 Endurance Test .48A 38.1 General 48A 38.2 Separately energized circuits .48A 39 Jarring Test .48B 40 Power Failure Test 50 40.1 General .50 40.2 Receiving units .50 40.3 Protected area units 50 41 Dielectric Voltage-Withstand Test .51 42 Temperatu

25、re Test .52 43 Abnormal Operation Test 55 44 Electrical Transient Tests 56 44.1 General .56 44.2 Supply line transients .56 MARCH 20, 2015 PROPRIETARY BURGLAR ALARM UNITS AND SYSTEMS - UL 1076 4UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL

26、 44.3 Internally induced transients .56 44.4 Input/output circuit transients 58 45 AC Induction Test .58A 46 Polymeric Materials Test .59 47 Battery Replacement Test .59 48 Strain Relief Test .59 48.1 General .59 48.2 Field-wiring leads .60 49 Ignition Through Bottom-Panel Openings Tests .60 49.1 Ge

27、neral .60 49.2 Hot, aming oil .60 49.3 Molten PVC and copper .60 50 Mechanical Strength Tests for Enclosures .61 51 Special Terminal Assemblies Tests .61 51.1 General .61 51.2 Disconnection and reconnection .62 51.3 Mechanical secureness .62 51.4 Flexing test 62 51.5 Millivolt drop test .62 51.6 Tem

28、perature test .62 INTERCONNECTION AND OPERATION SPECIFIC UNITS CONTROL UNITS 52 General 63 DIRECT-WIRE SYSTEMS 53 General 63 54 Switchboard Units 64 TRANSMITTER SYSTEMS 55 General 64 56 Receiving Units .65 57 Transmitting Units 65 57A Dual Signal Line Transmission Methods 66 58 Attack Test .68 COMBI

29、NATION SYSTEMS 59 General 69 MULTIPLEX SYSTEMS 60 General 69 61 Operation 69 61A Packet Switched Data Networks .72 62 Central Supervising Station Units 72C 63 Private Radio Facilities .72C 64 Standard Line Security Equipment .72D 64A Encrypted Line Security Equipment 72E MARCH 21, 2005 PROPRIETARY B

30、URGLAR ALARM UNITS AND SYSTEMS - UL 1076 5UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL SHORT-RANGE RADIO FREQUENCY (RF) DEVICES 65 General 72F 66 Time to Report Alarm 72G 67 Inoperative Transmitter Reporting .73 68 Battery Status Indicati

31、on .73 69 Tamper Protection 74 70 Protection From Interference .74 71 Reference Level Determination .74 71.1 General .74 71.2 Method I 74 71.3 Method 2 76 72 Interference Immunity .79 73 Frequency Selectivity 80 74 Clash 80 75 Clash Error 81 76 Error (Falsing) Rate .81 77 Throughput Rate 83 78 Trans

32、mitter Stability Test 84 79 Transmitter Accelerated Aging Test .84 80 Installation Instructions and User Manual 85 MANUFACTURING AND PRODUCTION LINE TESTS 81 Production-Line Dielectric Voltage-Withstand Tests .85 82 Production-Line Grounding Continuity Test .86 MARKINGS 83 General 86 84 Marking Perm

33、anency Tests .88A ACCESSORY EQUIPMENT 85 General 88A 86 Construction .89 87 Performance (Installation) Test .89 88 Markings .89 PROPRIETARY BURGLAR ALARM SERVICE 89 Physical Protection 90 90 Alarm-Receiving Equipment 90 91 Alarm and Signal Transmission, and Protected Area Control Units 91 92 Fire Pr

34、otection 91 93 Emergency Lighting .91 94 Clocks .91 95 Power Supply 91 95.1 General .91 95.2 Installation .92 95.3 Main power supply .92 95.4 Secondary power supply 92 95.5 Storage batteries .93 MARCH 21, 2005 PROPRIETARY BURGLAR ALARM UNITS AND SYSTEMS - UL 1076 6UL COPYRIGHTED MATERIAL NOT AUTHORI

35、ZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL 95.6 Battery overcurrent protection 93 95.7 Charging method .93 95.8 Cycle-charged batteries .93 95.9 Trickle- or oat-charged batteries .93 95.10 Rectiers and motor generators .94 95.11 Engine-driven generator sets .94 95.12 Sec

36、urity 95 96 Personnel 95 97 Service 96 APPENDIX A Standards for ComponentsA1 MARCH 21, 2005 PROPRIETARY BURGLAR ALARM UNITS AND SYSTEMS - UL 1076 7UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL This page intentionally left blank. MARCH 21,

37、2005 PROPRIETARY BURGLAR ALARM UNITS AND SYSTEMS - UL 1076 8UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL INTRODUCTION 1 Scope 1.1 These requirements apply to the construction, performance and operation of equipment intended for use in pro

38、prietary burglar alarm units and systems used to protect against burglary. These products are normally intended for indoor use. 1.2 A proprietary burglar alarm system as referred to by these requirements is a system in which alarm initiating circuits and devices are installed at a property and are c

39、onnected directly or indirectly to constantly monitored receiving equipment at a central supervising station. The central supervising station is located at the protected property and intended for operation by personnel responsible to the owner of the protected property. The protected property may co

40、nsist of a single property or of noncontiguous properties under a single ownership. The system is arranged so that a predetermined change in the alarm initiating circuits or devices automatically causes transmission of an alarm signal over a supervised signaling channel to the central supervising st

41、ation. 1.3 These systems normally operate within the limits of Class 2 remote-control and signal circuits as dened by Article 725 of the National Electrical Code, NFPA 70. 1.4 The protection circuit must respond to both an increase and a decrease in the circuit resistance or current within the limit

42、s indicated in the appropriate sections of this standard. See 53.3, 57.2, and 61.6. Revised 1.4 effective March 21, 2007 1.5 A system that provides line security may be classied as either standard line security or encrypted line security. See Standard Line Security Equipment, Section 64, and Encrypt

43、ed Line Security Equipment, Section 64A. Revised 1.5 effective March 21, 2007 1.6 Protective devices installed on individual properties are further classied as to extent of protection at each location. Requirements covering installation and classication (of extent) of alarm protective equipment at i

44、ndividual locations are published in the Standard for Installation and Classication of Burglar and Holdup Alarm Systems, UL 681, which is intended to be referenced by burglar-alarm installers. Revised 1.6 effective March 21, 2007 1.7 Proprietary burglar alarm units and systems are also specially des

45、ignated as to their intended use on mercantile premises, mercantile safes and vaults, and bank safes and vaults. 1.8 Equipment intended for combination burglar alarm and re-protective signaling systems shall comply with the requirements in the Standard for Control Units for Fire-Protective Signaling

46、 Systems, UL 864. 1.9 A product that contains features, characteristics, components, materials, or systems new or different from those covered by the requirements in this Standard, and that involves a risk of re, electric shock, or injury to persons shall be evaluated using the appropriate additiona

47、l component and end-product requirements to determine that the level of safety as originally anticipated by the intent of this Standard is maintained. A product whose features, characteristics, components, materials, or systems conict with specic requirements or provisions of this Standard shall not

48、 be judged to comply with this Standard. Where appropriate, revision of requirements shall be proposed and adopted in conformance with the methods employed for development, revision, and implementation of this Standard. 1.9 revised February 1, 1999 MARCH 21, 2005 PROPRIETARY BURGLAR ALARM UNITS AND

49、SYSTEMS - UL 1076 8AUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL 2 General 2.1 Components 2.1.1 Except as indicated in 2.1.2, a component of a product covered by this standard shall comply with the requirements for that component. See Appendix A for a list of standards covering components generally used in the products covered by this standard. 2.1.2 A component is not required to comply with a specic requirement that: a) Involves a feature or

展开阅读全文
相关资源
  • ANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdfANSI Z97 1-2009 American National Standard for Safety Glazing Materials used in Buildings - Safety Performance Specifications and Methods of Test《建筑物中窗用玻璃材料安全性用.pdf
  • ANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdfANSI Z97 1 ERTA-2010 Re ANSI Z97 1 - 2009 Errata《修订版 美国国家标准学会Z97 1-2009标准的勘误表》.pdf
  • ANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdfANSI Z21 40 2a-1997 Gas-Fired Work Activated Air-Conditioning and Heat Pump Appliances (Same as CGA 2 92a)《燃气、工作激活空气调节和热泵器具(同 CGA 2 92a)》.pdf
  • ANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdfANSI Z124 9-2004 American National Standard for Plastic Urinal Fixtures《塑料小便器用美国国家标准》.pdf
  • ANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdfANSI Z124 4-2006 American National Standard for Plastic Water Closet Bowls and Tanks《塑料抽水马桶和水箱用美国国家标准》.pdf
  • ANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdfANSI Z124 3-2005 American National Standard for Plastic Lavatories《塑料洗脸盆用美国国家标准》.pdf
  • ANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdfANSI T1 659-1996 Telecommunications - Mobility Management Application Protocol (MMAP) RCF-RACF Operations《电信 可移动管理应用协议(MMAP) RCF-RACF操作》.pdf
  • ANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdfANSI T1 651-1996 Telecommunications – Mobility Management Application Protocol (MMAP)《电信 可移动性管理应用协议》.pdf
  • ANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdfANSI T1 609-1999 Interworking between the ISDN User-Network Interface Protocol and the Signalling System Number 7 ISDN User Part《电信 ISDN用户间网络接口协议和7号信令系统ISDN用户部分.pdf
  • ANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdfANSI T1 605-1991 Integrated Services Digital Network (ISDN) - Basic Access Interface for S and T Reference Points (Layer 1 Specification)《综合服务数字网络(ISDN) S和T基准点的.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ANSI

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1