ARMY A-A-52442-1993 REPAIR KIT PUNCTURE PNEUMATIC TIRE (METRIC)《公制充气轮胎穿刺修理包》.pdf

上传人:bonesoil321 文档编号:439971 上传时间:2018-11-15 格式:PDF 页数:5 大小:303.65KB
下载 相关 举报
ARMY A-A-52442-1993 REPAIR KIT PUNCTURE PNEUMATIC TIRE (METRIC)《公制充气轮胎穿刺修理包》.pdf_第1页
第1页 / 共5页
ARMY A-A-52442-1993 REPAIR KIT PUNCTURE PNEUMATIC TIRE (METRIC)《公制充气轮胎穿刺修理包》.pdf_第2页
第2页 / 共5页
ARMY A-A-52442-1993 REPAIR KIT PUNCTURE PNEUMATIC TIRE (METRIC)《公制充气轮胎穿刺修理包》.pdf_第3页
第3页 / 共5页
ARMY A-A-52442-1993 REPAIR KIT PUNCTURE PNEUMATIC TIRE (METRIC)《公制充气轮胎穿刺修理包》.pdf_第4页
第4页 / 共5页
ARMY A-A-52442-1993 REPAIR KIT PUNCTURE PNEUMATIC TIRE (METRIC)《公制充气轮胎穿刺修理包》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、I METRIC I A-A-52442(AT) March 24, 1993 SUPERSEDING MIL-R-45949A(AT) 23 May 1977 COMMERCIAL ITEM DESCRIPTION REPAIR KIT, PUNCTURE, PNEUMATIC TIRE (METRIC) The General Services Administration has authorized the use of this commercial item description as a replacement for MIL-R-45949A(AT) which is can

2、celed. 1.0 Abstract. This commercial item description (CID) covers one type of tubeless tire repair kit which will allow emergency “outside-in“ repair of all types and sizes of tubeless heavy-duty tires up to and including 28-ply or ply-rated construction. the vehicle. The kit is to be used to repai

3、r tires while mounted on 2.0 Salient characteristics. 2.1 Description. The tire repair kit covered by this CID is for field use on tactical vehicles. The kit shall allow a temporary “get-home“ capability of 65 kilometers minimum. 2.2 Material. All parts and materials used in the fabrication of the r

4、epair kit shall be of a quality necessary to produce a kit which shall meet the requirements specified herein. The use of recovered material made in compliance with regulatory requirements is acceptable providing all requirements of this CID are met (see 5.4). 2.2.1 Hazardous material. The items tha

5、t comprise the tire repair kit shall not contain any hazardous material as defined in FED-STD-313 which may be toxic or harmful to personnel when used for its intended purpose. These items must also be considered non-hazardous in accordance with national and international regulations for the transpo

6、rtation and storage of dangerous goods. O Beneficial comments recommendations, additions, deletions clarification, etc. and any other data which may improve this document should be sent by letter to: U.S. Army Tank-Automotive Command, ATTN: AMSTA-GDS, Warren, MI 48397-5000. AMSC N/A FSC 2640 DISTRIB

7、UTION STATEMENT A. Approved for public release; distribution is unlimited. I Licensed by Information Handling ServicesA-A-52442 9999974 0343733 Ob4 2.3 Design and construction. The repair kit shall be designed and constructed so that it can be used for the operations specified herein. Unless otherwi

8、se specified (see 5.2), the repair kit shall consist of the following components and in the quantities (Qty) indicated: Component Insertion tool, handle type QY 1 each Repair material 1525 centimeters (cm) total length Bonding compound 470 milliliters (mi) minimum Leak detection material 60 ml minim

9、um Leak detection applicator bottle 1 each Skiving knife 1 each Reamer tool 1 each Hinged box 1 each 2.3.1 Details of components. 2.3.1.1 Insertion tool. The insertion tool shall consist of a corrosion resistant steel insertion needle with either a permanently attached or detachable handle. The hand

10、le shall be a heavy duty (truck) type of a suitable size and configuration to allow the insertion needle to perform its intended function without injury or stress to the operators hand. The needle shall be of sufficient diameter, strength, and hardness as to be suitable for its intended purpose. It

11、shall have a suitable eye to accommodate the repair material to be used for insertion into injury of tubeless tires. The needle, whether adjustable or permanently fixed in length, shall be suitable in length to perform its intended function. It shall be capable of withstanding a longitudinal force o

12、f 450 newtons without breaking or being permanently deformed. 2.3.1.2 Repair material. The repair material shall be polypropylene or nylon sleeving impregnated and coated with a polysulfide or butyl rubber compound and have a minimum tensile strength of 35,160 kilopascals (kPa). The repair material

13、shall be round or elliptical in shape. It shall be furnished with cross-sectional diameter adequate to seal punctures ranging from nail holes up to holes 19 mm in diameter and to seal slits 127 nun in length. A minimum total length of 1525 cm of repair material shall be furnished in the kit. The rep

14、air material shall be coiled and encapsulated in plastic tubes or cut to appropriate lengths and packaged five to ten individual refills per packet. Provisions for capping ends of coiled repair material tubes shall be provided to retain repair material in tube when not in use. Cut-to-length repair m

15、aterial shall be protected by a backing of “release“ parchment paper on one side and a mylar covering on the opposite side. The packets shall be sealed in polyethylene bags appropriate to the refill size. The tubes or bags for the repair material shall be properly identified as to their contents and

16、 use (see 2.6). 2 Licensed by Information Handling ServicesA-A-524 VE! m 9999974 0343734 TTO m 2.3.1.3 Bonding compound. The bonding compound shall be a fast self-drying type suitable to perform its intended function. A minimum of 470 ml shall be furnished in each kit. The material shall be in at le

17、ast two screw-top cans or plastic jars. reasonable unlimited storage life under normal conditions (see 2.6). water soluble concentrated liquid. When properly mixed with water, it shall have the capacity of detecting and showing leakage or seepage of pressure from a tubeless tire. A minimum of 60 mil

18、liliters (mi) of leak detector material shall be furnished in each kit. It shall be contained in a screw-cap type plastic container which shall be leak-proof and capable of preventing moisture absorption from the air. It shall under normal conditions have a reasonably unlimited storage life and be i

19、dentified as to its contents and capacity (see 2.6). of plastic, of at least 120 ml capacity, squeeze dispensing-type for mixing the leak detector material with water before use and for application of mixed solution to tubeless tire to allow visual detection of any leak or seepage of pressure. The a

20、pplicator bottle shall incorporate a screw-type applicator cap for filling and dispensing and an attached cap for applicator tip. It shall also be properly identified as to its use (see 2.6). 2.3.1.6 Skiving knife. A skiving knife with a blade length suitable to perform its intended function shall b

21、e provided. point and be of high quality, sharpenable steel permanently mounted in a handle. The containers shall be properly identified as to content and have O 2.3.1.4 Leak detector. The leak detector material shall be in the form of 2.3.1.5 Leak detector application bottle. The leak detector bott

22、le shall be The blade shall have a square 2.3.1.7 Reamer tool. The reamer tool shall consist of a round tapered reamer needle type instrument permanently mounted in a screwdriver type handle. The handle shall be heavy duty (truck) type of a suitabe size to allow the reamer to perform its intended fu

23、nction without injury or stress to the operators hand. The reamer portion of the tool shall be hardened steel. It shall have a tapering diameter starting with a point and tapering out to a suitable diameter and length for its intended function. The latter two thirds of the reamer measured from the h

24、andle shall be serrated. Tool must be capable of being forced into, through, and enlarging the average nail type puncture at the thickest or stiffest portion of all types and sizes of tubeless tire casings up to and including 28-ply or ply-rated construction. Tool shall be capable of performing the

25、described intended function without dislodging handle, bending, breaking or permanently deforming reamer portion of tool in any way. than 0.60 mm thick metal or equivalent strength plastic material and be rectangular in shape with all sides flat including the lid. The lid shall be hinged. The box an

26、d lid shall have a positive latching device. It shall be capable of containing all component parts of the kit and shall be painted in accordance with 2.5. See 2.6 for marking requirements. 2.3.1.9 Repair kit instructions. The repair kit shall include a set of instructions detailing procedures for de

27、tecting leaks and repairing tires using the components contained within. Instructions shall include a section on the safe and proper use of and disposal of the tire repair kit items (see 2.4). The O 2.3.1.8 Repair kit box. The repair kit box shall be fabricated of not less 3 I I Licensed by Informat

28、ion Handling ServicesA-A-52442 . = 9999974 0143735 937 m A-A-52442tAT) i structions shall be printed on a plate or label permanently affixed to the inside of the lid (see 2.6). The markings or printed information shall be permanent and impervious to solvents, cleaning fluids, or other repair kit che

29、micals. 2.4 Material Safety data sheet. A MSDS shall be prepared in accordance with FED-STD-313 (see 5.2 and 5.5). 2.5 Finish treatment. Cleaning, pretreating, priming and painting of the repair kit box shall conform to an appropriate CARC paint system selected from Drawing No. 12369000 for internal

30、 application. Unless otherwise specified (see 5.2), color of paint final top coat shall be green 383. outside of the repair box kit and shall be permanent and legible and shall include, as a minimum, the manufacturers identification code (CAGE), the contract number, the part identification number (P

31、IN) A52442-1, and the national stock number (NSN). All kit component markings and labels shall be legible and durable. 2.7 Workmanship. The repair kit shall be processed in such a manner to be 2.6 Identification markings. Identification markings shall be placed on the free from cracked or misplaced

32、parts, sharp edges, burrs and other defects which will adversely affect its serviceability or appearance. The repair kit shall be complete, new and unused. 3.0 Quality assurance provisions. 3.1 Responsibility for inspection. The contractor is responsible for the performance of all inspections (exami

33、nations and tests). 3.2 Contractor certification. The contractor shall certify and maintain substantiating evidence that the product offered meets the salient characteristics of this commercial item description and that the product conforms to the producers own drawings, specifications, standards, a

34、nd quality assurance practices. Items with known defects shall not be submitted for Government acceptance. The Government reserves the right to require proof of such conformance prior to the first delivery and thereafter as may be otherwise provided for under the provisions of the contract. packagin

35、g, packing, labeling, and marking shall be as specified in the contract or order (see 5.2). 4.0 Preservation, packaging, packing, labeling, and marking. Preservation, 5.0 Notes. (This section contains information of a general or explanatory nature that may be helpful, but is not mandatory.) 5.1 Addr

36、esses for obtaining copies of referenced documents. 5.1.1 Government specifications and standards. FED-STD-313 “Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities“ is available from the Navy Publications and Printing Service Office,

37、 Standardization Documents Order Desk, Bldg. 4D, 700 Robbins Avenue, Philadelphia, PA 19111-5094. 5.1.2 Other Government documents, drawings, and publications. Army drawing 12369000 “Chemical Agent Resistant Coating (CARC) Paint System Index“ is available from the Contracting Officer, U.S. Army.Tank

38、-Automotive Command, Warren, MI 48397-5000. 4 Licensed by Information Handling Services - A-A-52442 = 9999974 0343736 873 5.2 Ordering data. Acquisition documents must specify the following: a. Title, number and date of this commercial item description. b. PIN number and quantity required. c. Issue

39、of the DODISS to be cited in the solicitation and the specific d. Kit components, if other than specified (see 2.3). e. Identify activities requiring copies of completed MSDS and specify when the MSDS will be inspected (see 2.4 and 5.5). f. Final top coat color of paint. if other than specified (see

40、 2.5). g. Selection of applicable level and packaging requirements (see 4.0). 5.3 Cross reference. Repair kits conforming to this CID are interchangeable/substitutable with repair kits conforming to MIL-R-45949A(AT). 5.4 Regulatory requirements. The offeror/contractor is encouraged to use recovered

41、materials in accordance with Public Law 94-580 to the maximum extent practicable. requiring copies of the completed MSDS prepared in accordance with FED-STD-313. issue of individual documents referenced (see 5.1). 5.5 MSDS. The contracting officer should identify those activities - MILITARY INTERESTS: CIVIL AGENCY COORDINATING ACTIVITY: GSA - FSS Custodian Army - AT Review Activities Army - SM DLA - CS PREPARING ACTIVITY: Army - AT (Project 2640-A198) 5 Licensed by Information Handling Services

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1