ARMY MIL-B-50378 (1)-1988 BARRELS TEST SMALL ARMS AMMUNITION GENERAL SPECIFICATION FOR《一般规格的轻型武器弹药测试导火管》.pdf

上传人:ideacase155 文档编号:440930 上传时间:2018-11-15 格式:PDF 页数:2 大小:65.57KB
下载 相关 举报
ARMY MIL-B-50378 (1)-1988 BARRELS TEST SMALL ARMS AMMUNITION GENERAL SPECIFICATION FOR《一般规格的轻型武器弹药测试导火管》.pdf_第1页
第1页 / 共2页
ARMY MIL-B-50378 (1)-1988 BARRELS TEST SMALL ARMS AMMUNITION GENERAL SPECIFICATION FOR《一般规格的轻型武器弹药测试导火管》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、5 37-03 MIL-B-50378 (AR) AMENDMENT 1 31 July 1988 MILITARY SPECIFICATION BARRELS, TEST, SMALL ARMS AMMUNITION GENERAL SPECIFICATION FOR This amendment forms a parL of Military Specification MIL-B-50378 (AR), dated 29 January 1970 and is approved for use within the U.S. Army Armament Munitions and Ch

2、emical Command and is available for use by all Departments and Agencies of the Department of Defense. PAGE 3 4.2.2.1.2, Delete and substitute: “4.2.2.1.2 Chamber contour. Chamber measurements shall be made using approved inspection equipment. Chamber contour measurements shall be recorded-on the Sta

3、tement of Findings for each barrel.“ Delete: 4.2.3.4 “Tension test.“ and substitute: 4.2.3.4 Tensile test“. 4.2.4 Statement of Findings. Add the following: “The following measurements shall be recorded : 1. Rifling - The diameters of the lands and grooves, (see 4*2.2.1.1) 2. Chamber contour measurem

4、ents, (see 4.2.2.1.2)“ PAGE 4 4.4 Add new paragraph: “4.4 Inspection equipment. The contractor shall submit inspection equipment designs in accordance with the terms of the contract for approval, (see 6.41.“ 1 of 2 1305 AMSC NIA DISTRIBUTION STATEMENT A. Approved for public release; distribution is

5、unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-50378 (AR) AMENDMENT 1 PAGE 5 6.4 Add new paragraph: “6.4 approval. designs to Commander, ARDEC Attn: AMSMC-QAF-I, Picatinny Arsenal, N.J. 07806-5000. contractor contract number, item d

6、escription, and whether dimensional inspection or test.“ Submission of inspection equipment designsfor The contractor shall submit inspection equipment The letter of submittal shall state: Custodian Army-AR Preparing activity: (Project - 1305-AC83) Army-AR 2 I -. i; Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1