ARMY MIL-B-62098-1968 BULLDOZER EARTH MOVING TANK MOUNTING M8A3《坦克安装M8A3土方推土机》.pdf

上传人:rimleave225 文档编号:441016 上传时间:2018-11-15 格式:PDF 页数:8 大小:422.74KB
下载 相关 举报
ARMY MIL-B-62098-1968 BULLDOZER EARTH MOVING TANK MOUNTING M8A3《坦克安装M8A3土方推土机》.pdf_第1页
第1页 / 共8页
ARMY MIL-B-62098-1968 BULLDOZER EARTH MOVING TANK MOUNTING M8A3《坦克安装M8A3土方推土机》.pdf_第2页
第2页 / 共8页
ARMY MIL-B-62098-1968 BULLDOZER EARTH MOVING TANK MOUNTING M8A3《坦克安装M8A3土方推土机》.pdf_第3页
第3页 / 共8页
ARMY MIL-B-62098-1968 BULLDOZER EARTH MOVING TANK MOUNTING M8A3《坦克安装M8A3土方推土机》.pdf_第4页
第4页 / 共8页
ARMY MIL-B-62098-1968 BULLDOZER EARTH MOVING TANK MOUNTING M8A3《坦克安装M8A3土方推土机》.pdf_第5页
第5页 / 共8页
亲,该文档总共8页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-B-62078 777770b 1736778 777 = Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-b2098 = 0b 173b779 805 = pirckaging:-dpsokiiag 8736736 - ploking Data Sheet for willdozer ICit iQ3, iraii w. (Copies of spedficationr, 8-, drrwingr, uril priblicr

2、tiw req?lll%d by mppllers in connection with speclfic prociwri#nt functians should be obtdne from the promring retirity or II recte by the contracting officer.) 3.3.1 Qualified prochicts. With respect to aU. assemblies and cariponsnt P- reqairing Pact cati- or dmrlag. llsted on the $pL citad in 3.$,

3、 and necessary in the con- struction of this vehicle, the castrsctOr shall be responsible for tising only those product8 wch Sre QPL in the referenced specification or which have been approved for inclusion on such lists. Nmtufacturers inspection records SU specifically st mch CQ- ponent(s), LUIW of

4、 aupper(s) (as listed on the QFZ or ia the approval letter), rnd number and elate of te QPL fror which the selection was maace. The bi;illdozer, when wing oil speclfiad herein, cgp3ekly asscirble, utd inirtaed on the tank shall met the perforrance iwlpirament8 mi- fled herein, and .Biu. operate arti

5、sfactorily thmu&hou2 rU mnges of operation in the ambient temperature of minu8 to plu U5 F. -tic clutch switch when in uie oa position to prove pouisr for operation of the SC P4P. . AU controls shdl operate in the raise, lacihr, thmu&mut thc 1chll range of travel. The hydmuc aystm shaU hold the mold

6、- boud at any heit within crparrting mnge, and allow the moldboard to float rt ground laral. shaU operate in reslponse to the control8 banmrrd p-88- erd to PiSm 8- hOld the cutting 3*5*3 Miade to not leas than 9 inches below groimd level. at the 8peed# Usted in table 1. 3.5.4 Rate of lift. The Wdrua

7、lic systea &ail raise and louer the ioldBoar The spacified rater shall be accompli8h.d after ths hydramliC SYatSi hrs b- Stabilhed with Sn mad PmSSUra Of lo00 psi. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-8-62078 9999706 L73b78L 463 = 3.

8、6.1 Paint . Prqpurrtiaa for trea-t and painting .hrll be in accordance dthW.* Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-b2098 m 999990b 1736782 3TT W KLB-&O(AT) by the procuring activity, the contractor d proride an8 maintain an rffec- 4.

9、1.1 on tract ors qudity control system. Uniem3 otharwise specifid tire Qality Contml System acceptable ta the ocrparaiuit cdng the supplies undarr the contract. A current written 8cscripton of the system shal be sub- mitted to the coatracting officer prior to Initiation of prouction. wa con- tractor

10、 wlu. not be restricted to the Inspaction station or to the method of Xnsgection listed proviilnd th8t .II sqizi*alent control is included in the appro- rrid quality control procedure. The contractor SU notify the twQnnszt of aud obtain approvll for any change to the Written procedure that right aff

11、ect the degree or control required by this opecification or other applicable documents referenced therein. 4.1.2 prrtra SiPd c ta. E, -ts aad assablies shall be inspected in accordancse rawinga listed on applicable EPL 8736736 ami k8fier Idst Of hppaw Qt&.lty Aeanirsnce m81onS (e) 8736736. 4.1.3 Gov

12、erment verification. All quality asinuxncc operations perfmued by the contractor will b e subject to Government Mflcatiw at un6chednled inter- vais. verification will coasist of (o) sumeiirnce of the operation to mer- adne that practicer, methoda, aurb procedares of the nitten inspection pian are pr

13、oper* applied, d (b) Oavenreat prodact inspection to measure Qudity of prdkict offered for atcaptrnce. Deviation frai the prcrcribe or agreed-apan proceuree, or lastanees of poor practices wich might have au efect ppon the ty of the pFoduct, vlll iiariatey be cdlad to the attention of the con- tract

14、or. Ww of the contractor to pmtly correct eficiencies dscoverd ahail be eutase for 8wpension of acceptance untll corrective action ha8 been made or umtil conionirirce of product to prescribed critaria hu been demomtrated. 4.2 Prep muction urd first production lnmpection. 4.2.1 Prep roductioa irupe c

15、tion. To &termine comomence to 3.1 a pre- rrrodirction birlldo ser kit *em furni she shall be mumtad to asoertsh kit ionioxmmce with the requiraiants of this speuiiication. tion of th. bulldozer kit shdll be periorwd at the location specflied by the proeariag wtivty (me 6.e). uiy of the raqarircasnt

16、s specifled hemin shall be cause for refmal of the Govern- ment kt eoaftlcf a reteat until uorrectlve re11erms e&nfactozy to the Goverment instiltlom ami *e- mure of the prapmdnctlan iodai to ccqply with h,n b- klr-0 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without lice

17、nse from IHS-,-,-6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-le II. Cluaiiicrtion of Defect8 4.4.1 Hydranio operating system teat. Po eteniine conformme to 3.5 sn8 3.5.1s taa U dozer kit selectea shall be mounted on a vehicle. The kit wing apak

18、fied oil ehdl be opemW throughout dl rangas of operationo, and cecke for system operating pressure, arnd hydraulic pamp flow rate, at the emglne operatin$ rpQd lpecifld. 4.4.1.1 tic clutch check. To determine confoxmance to 3.5.1.1 witk the control panel -tia switch “on“ the iOrairxlic pmrp shall actuate. 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1