ARMY MIL-C-10113 C (1)-1986 COVER OUTLET VALVE (FOR C15 OUTLET VALVE)《排气阀套(用于C15型插座阀)》.pdf

上传人:inwarn120 文档编号:441080 上传时间:2018-11-15 格式:PDF 页数:2 大小:73.57KB
下载 相关 举报
ARMY MIL-C-10113 C (1)-1986 COVER OUTLET VALVE (FOR C15 OUTLET VALVE)《排气阀套(用于C15型插座阀)》.pdf_第1页
第1页 / 共2页
ARMY MIL-C-10113 C (1)-1986 COVER OUTLET VALVE (FOR C15 OUTLET VALVE)《排气阀套(用于C15型插座阀)》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-C-l0113C( EA) AMENDMENT 1 18 July 1986 MILITARY SPECIFICATION COVER, OUTLET VALVE (FOR ci5 OUTLET VALVE) This amendment forms a part of MIL-C-l0113C(EA), dated 16 September 1974, and is approved for use within the Chemical Research, Development and Engineering Center, Department of the Army and

2、is available for use by all Departments and Agencies of the Department of Defense. PAGE 2 Replace paragraph 3.2.2 “Test Slabs“ with the following: “3.2.2 Test slabs and equivalent cure. Test slabs shall be molded from stock representative of the formulation used for preproduction sample and from eac

3、h sublot during regular production of outlet valve covers in accordance with ASTM D 3182. The slabs shall have a cure equivalent to that of regular produc- tion outlet valve covers. Equivalent cure is established when physical proper- ties are in conformance with table I at a given cure time and tem

4、perature and that the percent free sulfur of the slab and the part are equivalent. Objec- tive evidence shall be submitted in accordance with 4.1.2.3. and cure temperature are established, they may not change during production.“ Once cure time PAGE 4 Add the following new paragraph 4.1.2.3: “4.1.2.3

5、 Equivalent cure. After date of award of contract, and prior to submission of preproduction, and without additional cost to the Government, the - contractor shal/,submit the information listed below which will constitute evi- dence for establishing equivalent cure for a given formulation at optimal

6、cure time and cure temperature for each mold used in the contract. The information relating to the cure may be classified as “compaw confidential“ and this infor- mation will be so treated by the Government. (a) Different combinations of cure time and temperature for slabs and parts, approaching and

7、 surpassing optimum cure shall be furnished. (b) Percent free sulfur for slabs and parts shall be furnished for each time/temperature combinations. FSC 4240 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 1 of 2 Provided by IHSNot for ResaleNo reproduction or networ

8、king permitted without license from IHS-,-,-MIL-C-3OLL3C (3) 42 = 797770b 0233537 3 MIL-C-l0113C( Ex) AMENDMEW 1 (c) All pwsical property data from table I shall be generated for slabs and shall be furnished for each time/temperature combinations. In addition, any physical property data from table I

9、 which can be generated for outlet valve covers shall be furnished for each time/temperature combination. (d) Any other information and data which substantiates the equivalency of cure at the established cure time and cure temperature,“ Custodian: *-EA Preparing activity: Army - EA Project No. 4240-A852 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1