1、MIL-C-14880B (3) 12 I 9979906 - 0474478 b + TCH-POUNDI - MIL-C-14 8 8 OB (AR) AMENDMENT .3 03 JULY 1991 SUPERSEDING AMENDMENT 2 19 DECEMBER 1988 MILITARY SPECIFICATION COMPONENT ASSEMBLY: 10559479, TRANSMITTER This amendment Eorms a part of Military Specification MIL- C-l4880B(AF) , dated 30 June 19
2、81, and is approved for use by the U,S. Army Armament, Munitions, and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 2 * 2.1, Drawings, under Inspection Equipment, Add (REF) following each Inspection Equipment drawing number. PAGE 5 3.3.
3、4, line 5, delete “1.9 f 0.4 milliseconds (msec) See (4.6.2.4) II and substitute “1.9 k O. 04 milliseconds (msec) , See (4 .6.2.4 ) II 3.4.1: Line 4, delete “40 f 4 gravity units (9)“ and substitute “20 f 3 gravity units (9)“ Line 6, delete “100.00 f 10.0 g for a duration of 1.5 1: 0.2 msec“ and sub
4、stitute “40 f 4 g for a duration of 10 $: 1.0 msec“ 3.4.3, add: “The PFN voltage limitation of 3.3.2 shall apply only at ambient temperature (60F - 90F) .II PAGE 11 * Delete paragraph 4.6.1 in its entirety and substitute: “4.6.1 Test euuiDment. The test equipment in Table IX may be used where specif
5、ied to perform the required test If alternate test equipment is to be used, the contractor shall submit inspection equipment designs for review and approval to: US Army AMCCOM, ATTN: AMSMC-QAF-I (D), Picatinny Arsenal, NJ 07806-5000. AMSC N/A Distribution Statement A. is unlimited. 1 OF 2 FSC 1240 A
6、pproved for public release; distribution Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PAGE 12 Custodian: Army - AR I 4.6.3.1.1, line 4, delete “shall be 40 .t. 4 g“ and substitute “shall be 20 k 3 g“ 4.6.3.1.2, lines 4 and 5, delete “100.0 1: 10.0
7、 g with a time duration of 1.5 k 0.2 msec“ and substitute.Il40 k 4 g with a time duration of 10 f 1.0 msec“ substitute “performance tests of table II, except item 102,Il 4.6.3.3, line 3, delete “performance tests of table IIgv and 4.6.3.4, line 4 delete performance tests of table II“ and substitute
8、“performance tests of table II, except item 102,Iv 4.6.3.5, line 1, delete IIWith power and loads of table I applied“ and substitute “With no power applied“ NOTE: The margins of this amendment are marked with an asterisk or vertical lines to indicate where changes (additions, modifications, correcti
9、ons, deletions) from the previous amendment were made. This was done as a convenience only, and the Government assumes no liability whatsoever for any inaccuracies in these notations, Bidders and contractors are cautioned to evaluate the requirements of this document based on. the entire content irrespective of the marginal notations and relationship to the last previous amendment. Preparing Activity: Army - AR (Project 1240-A961) 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-