ARMY MIL-C-3972 B-1972 CARTRIDGE 60MM ILLUMINATING M83A3 WITH FUZE TIME M65A1 LOADING ASSEMBLING AND PACKING《M65A1型60MM有M83A3型引信照明弹的装卸 组装及包装》.pdf

上传人:cleanass300 文档编号:441332 上传时间:2018-11-15 格式:PDF 页数:18 大小:760.72KB
下载 相关 举报
ARMY MIL-C-3972 B-1972 CARTRIDGE 60MM ILLUMINATING M83A3 WITH FUZE TIME M65A1 LOADING ASSEMBLING AND PACKING《M65A1型60MM有M83A3型引信照明弹的装卸 组装及包装》.pdf_第1页
第1页 / 共18页
ARMY MIL-C-3972 B-1972 CARTRIDGE 60MM ILLUMINATING M83A3 WITH FUZE TIME M65A1 LOADING ASSEMBLING AND PACKING《M65A1型60MM有M83A3型引信照明弹的装卸 组装及包装》.pdf_第2页
第2页 / 共18页
ARMY MIL-C-3972 B-1972 CARTRIDGE 60MM ILLUMINATING M83A3 WITH FUZE TIME M65A1 LOADING ASSEMBLING AND PACKING《M65A1型60MM有M83A3型引信照明弹的装卸 组装及包装》.pdf_第3页
第3页 / 共18页
ARMY MIL-C-3972 B-1972 CARTRIDGE 60MM ILLUMINATING M83A3 WITH FUZE TIME M65A1 LOADING ASSEMBLING AND PACKING《M65A1型60MM有M83A3型引信照明弹的装卸 组装及包装》.pdf_第4页
第4页 / 共18页
ARMY MIL-C-3972 B-1972 CARTRIDGE 60MM ILLUMINATING M83A3 WITH FUZE TIME M65A1 LOADING ASSEMBLING AND PACKING《M65A1型60MM有M83A3型引信照明弹的装卸 组装及包装》.pdf_第5页
第5页 / 共18页
亲,该文档总共18页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-C-3972B (MU) 22 :Jay i972 ! SUPERSEDING 26 April i965 MIL-C-3972A (w) MILITARY SPECIFICATION CARTRIDGE, OMM, ILLUMINATING, M83A3 WITH FUZE, TIME, M65A1 LOADING, ASSEMBLING AND PACKING 1. SCOPE 1.1 This specification covers the loading, assembling and packing for one type of illuminating cartridg

2、e designated as M83A3 for use with 60MM Mortars. 2. APPLICABLE DOCUMENTS SPECIFICATIONS MILITARY MIL-A-2550 - MIL-1-45607 - MIL-P-60316 - 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposals form a part of this specification to the extent specifi

3、ed herein. i Ammunition and Special Weapons; General Specification for Inspection Equipment, Supply and Maintenance of Primer, Percussion, M32, Loading, Assembling and Packing STANDARDS MILITARY MIL-STD-105 - MIL-STD-109 - MIL-STD-414 - MIL-STD-1168- MIL-STD-12 35- Sampling Procedures and Tables for

4、 Inspection by Attributes (ABC-STD-105). Quality Assurance Terms and Definitions. Sampling Procedures and Tables for Inspection by Variables for Percent Defective. Lot Numbering of Ammunition Single and Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes. I FSC: 1310 I

5、4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-L -_ - - . -._ -._-_ MIL-C-3772B 13 7799706 0272132 1 MIL-C-3972B (MU) .- DRAWINGS ORDNANCE CORPS 9207516 - Cartridge, 60MM, Illuminating,-M83A3, 9242065 - Container, Ammunition, Fiber, PA44, for with

6、 Fuze, Time, M65A1. Cartridge, OMM, Illuminating, M83A3, in Jungle Wrap. 9233395 - Application of Inner-Wrapper on Container, Ammunition, Fiber, for Cartridge, OMM, in Jungle Wrap 9242066 - Box, Packing, Ammunition, for Cartridge, OMM, Illuminating, M83A3, with Fuze, Time, M65A1 in Fiber Container P

7、A44, in Jungle Wrap. PUBLICATIONS ORDNANCE CORPS ET-9207516 - Equipment Tabulation (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting

8、officer). 3. REQUIREMENTS 3.1 Materials.-Materials and parts shall be in accordance with applicable specifications and drawings. 3.2 Cartridges,-The cartridge shall comply with all requirements specified on Drawing (dwg.) 9207516 and with all requirements specified in applicable specifications. 3.3

9、Proving Ground Test,-The cartridge shall comply with the following requirements when tested as specified in 4.4.2. 3.3.1 Failure to Fire.-The cartridge shall not fail to fire. 3.3.2 Fuze Ballistic Functioning and Uniformity of Burning Time.-The cartridge assemblies, during ballistic testing, shall f

10、unction and cause separation of the body tube assembly and tail cone and shall comply with the burning time in Table I when tested in accordance with 4.4.2. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-3772B 13 W 9999906 0272133 3 = MIL-C-

11、3972B (MU) TABLE I Charge Increment Quadrant Elevation Burning Time (Seconds) ( Degrees ) 2 4 68O 45 1/4O 11.78 - 13.28 12.00 - 13.50 3.3.3 Burning of Illuminant.-The illuminant shall ignite and provide effective illumination (See 6.6) for not less than 32 seconds, in the base of the mortar or withi

12、n 200 yards horizontal range of the mortar. 3.3.4 Security of Parts.-There shall be no metal parts failure 3.3.5 Horizontal Range.-No cartridge shall have a horizontal range less than 80 percent (%) of the average horizontal range. 3.4 Workmanship 1 3.4.1 General.-All processing and assembly operati

13、ons of the cartridge shall be correctly performed in a thorough, workmanlike manner. Parts shall be free of chips, dirt, grease, sharp edges, cracks, rust and foreign matter. The cleaning method used shall not be injurious to any part, nor shall the parts be contaminated by the cleaning agent. Exter

14、ior surface coatings shall be continuous, except for a few light scratches not exposing base material. All required markings shall be neat and sharply defined. I 3.4.2 Painting and Marking.-The painting and marking shall be restored by the assembling contractor on any component furnished to him pain

15、ted and marked, when such painting and markings have been marred or obliterated. I 3.5 First Article Sample.-This specification makes provisions for first article ballistic inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 4

16、. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection.-Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or order, the supplier may

17、 use his own or any other facilities 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. MIL-C-39728 13 979990b 0292334 5 suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The overnmen

18、t reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to Standard MIL-STD-109 to define terms used herein. The provisions of Specifi

19、cation MIL-A-2550 shall apply. 4.1.1 Submission of Product.-At the time each completed lot of items deliverable under the contract is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the information prov

20、ided is correct and applicable to the product being submitted: a. A statement that the lot complies with all of the quality assurance provisions specified in this specification, b. Drawing and specification number and date, together with an identification and date of changes thereto. c. A statement

21、that all material purchased by the contractor meets requirements, when such material is controlled by Government or commercial specifications referenced in any of the contractual documents, and that certificates of conformance are on file and available for review. d. Number of items in the lot. e. D

22、ate submitted. The certificate shall be signed by a responsible agent of the certifying organization, The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certif

23、icates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.2 First Article Ballistic Testing 4.2.1 Submission of Ballistic Assemblies.-The contractor shall submit a first article ballistic sample as designated by the conttracting off

24、icer for determination of conformance to drawing and specification requirements. After the fuze and projectile first article samples have been accepted, the first artiele ballistic sample shall be tested and shall consist of the following: 4 Provided by IHSNot for ResaleNo reproduction or networking

25、 permitted without license from IHS-,-,- MIL-C-3972B 13 999990b 0292135 7 MIL-C-3972B (MU) a. Twenty-five painted complete rounds assembled with inert loaded illuminant loading assemblies (suggeste filler: sand and laminac) and inert fuzes. b. Thirty completely loaded complete rounds fuzed, painted

26、and marked. 4.2.2 Metal Parts Security .-Twenty-five (25) of the cartridge metal parts shall be tested as shown in the phases in Table II. All of the cartridges shall be inert loaded to service weight and will be fired from a weapon for which the round is standard, The propellant charge will be adju

27、sted to obtain between 109% and 117% of the upper pressure limit of the pro- pellant. Dwnmy or inert fuzes shall be used on all metal parts security and recovery test rounds, TABLE II Mortar Elevation Initial Production Phas e (Degrees ) Sample Se curit y 45 1/4 10 Re c ove r y Optional 15 Recovery.

28、-Rounds fired for recovery which satisfy the requirements of 3.3.4 are to determine quality of ammunition produced. shall be made after recovery for evidence of body or tail cone deformation, dishing or breakup of the projectile other than by impact. If the proving ground determines that deformation

29、, dishing or breakup of the cartridge has resulted, the results of the test shall be referred. projectile and fuze specification first article tests, as well as the cartridge metal part security test, the cartridge functioning tests shall be performed. inspected for conformance to any or all of the

30、requirements of this specification and any or all of the requirements of the. applicable drawings at the contractors plant prior to submission to the proving ground for testing. Half of the sample projectiles shall be fired at the Charge 2 zone while the remaining half will be fired at the Charge. 4

31、 zone. Cartridge fuze function time shall be eval- uated in accordance with MIL-STD-414, Section By Table B3, AQL 2.5%. Examination 4.2.3 Cartridge Functioning.-After completion of the The thirty loaded cartridges shall be Provided by IHSNot for ResaleNo reproduction or networking permitted without

32、license from IHS-,-,-4.24 Recovery.-The proving ground shall make the necessary arrangements to recover all of the rounds fired for recovery during the metal parts security test and any or all malfunctioning parachute and illuminant assemblies which may occur during the cartridge functioning test, A

33、rrangements for the recovery of malfunctions shall be for the first article samples only, unless directed by the procuring activity. 4.2.5 Rejection.-If any internal part, inert or loaded, or external metal parts or assemblies fail to comply with my or all of the applicable requirements, the first a

34、rticle sample shall be rejected. If during the metal part security or recovery test any cartridge fails to comply with the requirement of 3.3.4, the first article sample shall be rejected. In addition, if during the cartridge functioning test any loaded cartridge fails to comply with the requirement

35、s of 3.3, 3.3.1, 3.3.2, 3.3.3, 3.3.4 and 3.3.5, the first article cartridge functioning sample shall be rejected. The Government reserves the right to terminate its inspection and testing upon any failure in the first article sample to comply with any of the stated requirements. In the event of reje

36、ction, the Government reserves the right to require the contractor to take corrective action and submit a new first article sample or portion thereof. Until a complete first article sample is accepted, the contractor is in no way authorized by the Government to initiate regular production unless oth

37、erwise directed by the contracting officer. 4.3 Quality Conformance Inspection 4.3.1 Lot Formation.-The term “inspection lot“, as used in this specification, is defined as an essentially homogeneous collection of units of product from which a representative sample is drawn and inspected to determine

38、 conformance with applicable requirements. The sample selected shall represent only that quantity of units from which the sample was drawn and shall not be construed to represent any prior or subsequent quantities presented for Inspection. considered to exist provided the inspection lot has been pro

39、duced by one manufacturer, in one unchanged process, using the same materials and methods, in accordance with the same drawings, same drawing revisions, same specifications and same specification revisions, and complies with the provisions for submission of product as specified in Standard MIL-STD-1

40、05. Changes to the Homogeneity shall be 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-39728 13 m 777770b 0242137 O MIL-C-3972B (MU) process, specifications or drawings, not affecting safety, per- formance, interchangeability or storage, as

41、determined by the Government, shall not be deemed to alter the homogeneity of an inspection lot. All material submitted for inspection in accordance with this specification shall comply with the homogeneity criteria specified herein, regardless of the type of sampling procedure which is being applie

42、d to determine conformance with requirements. Lot numbering, as rlequired, shall be in accordance with MIL-STD-1168. Each lot shall contain: a. Loaded projectiles of one lot interfix number from one manufacturer, b. Loaded ignition cartridges of one lot interfix number from one manufacturer. c. Fin

43、assemblies of one lot interfix number from one manufacturer. d. Loaded primers of one lot interfix number from one manufacturer. e. Propellant increments made from not more than one lot f. Loaded fuzes from not more than two serial lots of one of propellant from one manufacturer. lot interfix from o

44、ne manufacturer. 4.3.2 Examination.-The examinations listed in the following subparagraphs shall be performed on inspection lots (See 4.3.1) of the components or assemblies designated in the applicable paragraph headings. Inspection for Critical Defects (and Major Defects, when so specified) shall b

45、e 100 percent. Sampling plans for Major and Minor Defects shall be in accordance with MIL-STD-105 except that continuous sampling plans in accordance with MIL-STD-1235 may be used if approved by the Government, the AQLs designated herein to the groups of Major and Minor Defects listed, the contracto

46、r may elect to apply AQLs to individual defects using an AQL of 0.40 percent for each Major Defect and an AQL of 0.65 percent for each Minor Defect. When this method is elected, it shall be applied to all of the Major and Minor Defects listed in the applicable subparagraph of this section, except wh

47、ere 100 percent inspection is specified, and be docu- mented as part of the contractors inspection system. Equipment necessary for the performance of the inspections listed shall be in accordance with 4.3.4. Instead of applying 7 Provided by IHSNot for ResaleNo reproduction or networking permitted w

48、ithout license from IHS-,-,-_ - MIL-C-37728 33 7777306 0272338 2 MIL-C-3972B (MU) 4.3.2.1 Projectile, Prior to Assembly of Fuze and Pin (See dwg. 9207517, covering a detail of dwg. 9207516). Cate gories Defects Method of Code No. Inspection (See 6.2) Critical : None defined. Major: AQL 0.40 percent

49、Minor : None defined. 4.3.2.2 101. Foreign matter in fuze well. . Visual O1001 Cartridge, After Assembly of Fuze and Fin (See dwg. 9207516 1. Categories De f ect s Critical: None defined. Method of Inspect ion Code No. Ma j or : AQL 0.40 percent 101. Fuze or fin fails to withstand assembly 102. Fuze or fin stake missing Minor : AQL 0.65 percent /disassembly torque (See 4.4.1) . Test 02001 or mislocated. .V isual 02002

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1