ARMY MIL-C-46921-1963 CHARGE PROPELLING DUMMY M3 FOR CARTRIDGE TRAINING 105MM M14《M14型105MM训练弹药筒的M3型装药推进模型》.pdf

上传人:outsidejudge265 文档编号:441530 上传时间:2018-11-15 格式:PDF 页数:5 大小:418.24KB
下载 相关 举报
ARMY MIL-C-46921-1963 CHARGE PROPELLING DUMMY M3 FOR CARTRIDGE TRAINING 105MM M14《M14型105MM训练弹药筒的M3型装药推进模型》.pdf_第1页
第1页 / 共5页
ARMY MIL-C-46921-1963 CHARGE PROPELLING DUMMY M3 FOR CARTRIDGE TRAINING 105MM M14《M14型105MM训练弹药筒的M3型装药推进模型》.pdf_第2页
第2页 / 共5页
ARMY MIL-C-46921-1963 CHARGE PROPELLING DUMMY M3 FOR CARTRIDGE TRAINING 105MM M14《M14型105MM训练弹药筒的M3型装药推进模型》.pdf_第3页
第3页 / 共5页
ARMY MIL-C-46921-1963 CHARGE PROPELLING DUMMY M3 FOR CARTRIDGE TRAINING 105MM M14《M14型105MM训练弹药筒的M3型装药推进模型》.pdf_第4页
第4页 / 共5页
ARMY MIL-C-46921-1963 CHARGE PROPELLING DUMMY M3 FOR CARTRIDGE TRAINING 105MM M14《M14型105MM训练弹药筒的M3型装药推进模型》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-G46921 (MU) 12 FEBRUARY 1963 MILITARY SPECIFICAILION CHARGE, PROPELLING DUMMY, M3 FOR CARTRIDGE TRAINING: 105MM, M14 1. SCOPE 1.1 This specification covers one type of propelling charge for 105BIM, M14 desig- nated as the M3 Dummy Propelling Charge. 2. APPLICABLE DOCUMENTS 2.1 The following docu

2、ments of the issue in effect on date of invitation for bids, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-2550 - Ammunition and Spe- cial Weapons; Gen- eral Specification for. MIGP-10025 - Packaging and Mark- for Domestic Ship- ment of Inert Am- mun

3、ition Compon- ents. MIL-1-45208 - Inspection Require- ments, General Specification for. MIL145607 “Inspection Equip- ment, Supply and Maintenance of. STANDARDS MILITARY . and Tables for In- spection :by Attri- butes. MIL-STD-109 - Quality Assurance Terms and Defini- tions. DRAWINGS ORDNANCE CORPS 88

4、65039 -Charge, Propelling, Dummy : 106MM, M3 for Cartridge Training: 105MM, M14. 8865041 -Increment Loading AssembIy. PUBLICATIONS ORDNANCE CORPS ORD-M608-ll-Procedures and Tables for Continu- ous Sampling by Attributes. IEL-8872533 - Index of Inspection Equipment Lists (Copies of specifications, st

5、andards, drawings and publications required by contractors in connection with spe+c procurement functions should be ob- tained from the procuring activity or as directed by the contracting officer.) 3. REQUIREMENTS MICSTD-105 - Sampling Procedures 3.1 Material. Materials shall be in accord- Licensed

6、 by Information Handling Services“ MIL-C-4672L L3 9 9777706 0314658 0 -_ _ MIL-“4921 (MU) ance with applicable drawings and specifica- tions. 3.2 Propelling charge. The charge shall comply with all requirements specified on Drawing (dwg.) 8865039 and with all re- quirements specified in applicable s

7、pecifica- tions. -. 3.3 Workmanship, The charges shall be free from dirt, grease, rust and other fox- eign material. .4. QUALITY ASSURANCE PROVISIONS 4.1 General quality assurance provisions. The supplier is responsible for the perform- ance of all inspection requirements specified herein. Except as

8、 otherwise specified, the supplier may utilize his own or any other inspection facilities and services acceptable to the Government. Inspection records of the examinations and tests shall be kept com- pkte and available to the Government as specified in the contract or order. The Gov- ernment reserv

9、es the right to perform any of the inspections set forth in the specifict verifimtio% Using the contractors written quality assurance proce- dure, this detail specification, the applicable drawingy and other contractual documents as a guide, the Government inspector shall verify at unscheduled inter

10、vals all quality assurance operations performed by the con- tractor. Verification will be in accordance with MIL-1-45208 and will be performed to the extent necessary to assure compliance with the contractual requirements. Severity of Government inspection af individual char- acteristics will be dir

11、ectly related to the serioasness of the classification assigned. In 2 / . I Licensed by Information Handling Servicesno instance will a characteristic classified “critical” be accepted solely on the basis of the contractors records. 4.2 Inspection provisions. 4.2.1 Lot .formation. A lot shall consis

12、t of charges produced by one manufacturer in one unchanged process, in accordance with the same drawing, same drawing revision, same specification, and same specification revision. Drawing, specification, and process changes not affecting safety, performance or fit, as determined :by the Government

13、shall not necessitate changing the lot num- ber. 4.2.2 Examination. Sampling plans and Categoriea Defeats Critical: None defined Major: None defined Minor : AQL 2.60 percent - MILC-46921 (MU) procedures for the following classifications of dafects shall be in accordance with MIL- STD-105 except that

14、 inspection for critical defects, when listed, shall be 100 percent. Continuous sampling plans in accordance with Handbook ORD-M608-11 may ,be used if approved by the procuring activity. Also, at the option of the procuring activity, AQLs and sampling plans may be applied to the individual character

15、istics listed using an AQL of 0.25 percent for each major defeot and an AQL of 1.40 percent for each minor defect, Equipment necessary for the performance of the inspections listed shall be in accordance with 4.2.4. 4.2.2.1 Body increment (see dwg. 8865040 covering a detail of 8865039). Method of C

16、mandatory and non-mandatory. When an IEL references mandatory Ordnance designs, the contractor shall comply with, and use these designs accordingly. The contractor may, however, in connection with non- mandatory designs and with the approval of the Government, design alternate in- spection equipment

17、 to facilitate his oper- ations, Such contractor prepared designs must be approved by the Government prior .- i” - Licensed by Information Handling ServicesMIL.C-4-6921 (MU,) to fabrication or procuring of the equip- CDCF - Contractor design responsibili- ment. Designs shall be submitted for ap- ty

18、on contractor format prova1 as specified in 6.3.7. OD -Ordnance design, cification control drawings depict the device for use. in outline, descriptive, diagrammatic, or CE - Commercial equipment. pictorial form only and specify the required performance or other characteristics. Con- tractors must pr

19、epare drawings of their designs in support of specification control .6.3.3 Specificatiotz control drawings. Spe- ODMU- Ordnance design, mandatory SCD - Specification control drawing. 6.3.6 Use of standard measuring equp- ment. If the contractor desires to use stand- drawings me IEL Ode indicate ard

20、measuring equipment in lieu .of govela- vhether draengs must be detailed* These ment or designed diagram- prepared must be P- matic sketch= or Other descriptio- of the proved by the to the use of such equipment shall be submitted for fabrication or procuring of the equipment. appyoval as specified 6

21、.3.7. Commercial equipment meeting the require- ment of specification control drawings may be approved if described in sufficient detail to permit identification and evaluation by the Government. Designs shall be submitted for approval as specified in 6.3.7, 6.3.4 Cofimmevcid ifems. Commercial item

22、inspection equipment is equipment that has a universal application for a specific func- tion, It is comprised of items commonly used by industry and government. Contractors are not required to furnish drawings of com- mercial item inspection equipment but a list; of such equipment must be approved b

23、y the Government. Lists shall be submitted for ap- proval to the inspection element of the agency administering the contract. 6.3.5 IEL codes. The inspection equipment referenced in paragraphs 6.3.1, 6.3.2, 6.3.3 and 6.3.4 will be designated in the IEL by the following codes : 6.3.7 Smbmisb of contr

24、actor designs. Designs and the fact that the Government may have formulated, furnished, or in any may supplied the said drawings, specifications, or other data is not to be regarded by implication or otherwise as in any manner licensing the holder or any other person or corporation, or conveying any

25、 rights or permission to manufacture, use, or -sell any patented invention that may in any way be rerated thereto. CDOF - Contractors design responsi- cnstodian: bility on Ofanance format ; Preparing activity: ORDM-608-12. Army-MU Army-MU Project No. 131L“299 f? U. S. GOVERNMENT PRINTING OFFICES 661061-1963“(1454) Licensed by Information Handling Services

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1