1、Military MIL-STD- 105 MIL-STD-109 MIL-STD-636 MIL-STD-644 -4.- MIL-c-B(MU) - 5 July 1973 SUPERSEDING MIL-C-46937A( MU) i5 May 1964 MILITARY SPECIFICATION CARTRIDGE, CALIBER .45, BLANK, M9 1. SCOPE 1.1 This specification covers a cartridge intended for saluting and training purposes. 2. APPLICABLE DO
2、f3“TS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFT CATI ONS Military MIL-I-45607 - Inspection Equipment, Acquisition, Main- tenance and Disposition Of STANDARDS MIL
3、-STD-1168 DRAWINGS Munitions Command ci0523085 Il7553728 - Sampling Procedures and Tables for Ihspection - Quality Assurance Terms and Definitions - Visual Inspection Standards for Small Arms Ammunition Through Caliber .5O - Visual inspection Standards and Inspection Procedures for Inspection of Pac
4、kaging, Packing and Marking of Small Arms Ammunition by Attributes - Lot Numbering of Ammunition - Cartridge, Caliber .45, Blank, Mg - Packing Cartons; Box, Ammunition, Mai; Box, Wire- bound FSC 1305 THIS DOCUMENT CONTAINS 7 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted
5、 without license from IHS-,-,-MIL-c-46937B(m) ,. 2.1 (Contd) . PUBLICATIONS AMCR 715-505, Vol. 5 - Ammunition Ballistic Acceptance Test Methods; Volume 3, Test Procedures -. fox Cal: .45 Cartridges ( Copies of specifications, standards, drawings and publications required by suppliers in connection w
6、ith specific procurement functions should be obtained fram the procuring activity or as directed by the contracting officer . ) 3. REQUIREMENTS 3.1 General.-The cartridges shall comply with the requirements specified on drawing 10523085, referenced specifications and the following: 3.2 perforations
7、of 0.1 inch or greater in diameter in a paper screen placed i5 feet from the muzzle of the gun. 3.3 Function and casualty.-The cartridge shall function without 3.4 Workmanship.-The cartridge shall comply with the applicable Screen perforation.-The cartridge, when fired, shall not cause . casualty. d
8、rawing and shall be free of folds, deep draw scratches, scaly metal, corrosion, discoloration, dirt; oil and smears of lacquer. 4. QUALITY ASSUFWJCE PROVISIONS contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. specified in
9、 the contract or order, the supplier may use his own or any .other facilities suitable for the performance of the inspectionrequirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where su
10、ch inspections are deeped necessary to assure supplies and services conform to prescribed requirements. 4.1 Responsibility for inspection.-Unless otnerwise specified in the Bcept as otherwise 4.1.1 Quality assurance terms and definitions .-Reference shall be made O.M MIL-STD-109 for definition of qu
11、ality assurance terms.- 4.2 First article sample. 2 -/ I- i .: ! L -i .! . I. . ,) , r Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-4b9378 13 7797906 0334774 5 = . a sample shall be submitted in shall consist of 1000 blank cartridges. The sa
12、mple shall be manufactured using the same materials, equipment, processes and procedures as will be used in regular production. All parts and materials including packaging and packing shall be the same as used for.regular production and shall - be obtained from the same source of supply. I 4.2.1.1 E
13、xamination and test.-After inspection and provisional acceptance at source, the sample shall be inspected for all requirements of the drawings and specifications at a government laboratory or such other facility specified in the contract. 4.2 . 1.2 Initial production sample failure . -Failure of the
14、 sample to comply with reauirements of the drawings and specifications shall result in sample disappr6val. sample shall be based upon results of initial tests only, and no second sample shall be permitted on that initial production sample. Determination as to accepiability of any initial production
15、4.3 inspection provisions. 4.3.1 - Lot. 4.3.1.1 Submission of product.-The product shall be submitted in accordance with MIL-STD-105. 4.3.1.2 Lot identification.-Each lot of munition shall be identified as to type, caliber and model, as well as with a lot number in accordance with MIL-STD-1168. Each
16、 lot shall be further identified by a Federal Stock Number assigned by the procuring activity. 4.3.2 Examination.-Ex Splits, through head 2 Complete rupture O Detached metal 2/ O Failure to extract 20 Misfire 6 Only splits extending through the mouth taper more than from mouth shall be penalized. 7
17、1 1 . . 52 18 4 1 1 52 14 .23 inches 2/ Any particle of metal which becomes separated from the case between the mouth and the juncture of the mouth taper and the case shall be classified as detached met& 3/ All failures to extract attributable to the ammunition, with the exception of complete ruptur
18、e, observed in all tests shalL be included. 4.3.4 Packaging, packing and marking inspection.-During or immediately Occurrence of a dummy or line throwing cartridge shall be classed prior to the packaging operation, 100 per cent examination of the cartridges shall be performed to ascertain that the c
19、artridge type conforms to the drawing. as a major defect. be classed as a critical defect. All nonconforming cartridges shall be rejected, accordance with WL-STD-644 as applicable to the drawing. contract, the contractor shall supply and maintain inspection equipment in accordance with the applicabl
20、e requirements of MIL-1-45607. Occurrence of any type other than those listed shall Inspection for packaging, packing and marking shall be in Inspection equipment.-Except as otherwise provided for by the 4.3.5 4.4 Test methods and procedures. . .- 6 I I i Provided by IHSNot for ResaleNo reproduction
21、 or networking permitted without license from IHS-,-,-TIL-C-i.Ib937B 13 W 9799706 03l111798 2 m T . *- a MIL-C-46937B( MU) 4.4.1 Screen perforation.-The test shall beconducted in accordance with AMCR Tl5-505, Volume 5. the quantity of cartridges specified in Table II shall be fired single shot in ea
22、ch pistol. Two pistols shall be used and one half of 4.43 Defect penalty.-In any ballistic test, except function and casualty, in which the occurrence of a firing defect prevents the obtaining of a reliable result for the characteristic being testea, an additional shot shall be fired. sample.shal1 b
23、e penalized for such defects in accordance with Table III. That particular test shall not be penalized, but the acceptance 5. PREPARATION FOR DELIVERY 5.1 Packing.-Level A - The cartridges shall be packed in accordance 5.2 Marking and labeling.-Packing boxes shall be marked and labeled with Drawing
24、D7553728 (Worldwide shipment) or as required by the contract. in accordance with the applicable drawing cited in 5.1. 6. NOTES 6.1 Ordering data.-Invitation for bids, request for proposal, contracts or orders will specify the following: 6.1.1 Title., number and date of this specification. 6.1.2 Prov
25、ision for the supply, maintenance and disposition of mandatory ballistic test equipment, 6.1.3 Provision for the submission of acceptance inspection reports containing final inspection results for each lot of ammunition presented to the Government. 6.2 Hazard notice.-The cartridge described herein a
26、nd certain of its components are flammable and/or explosive and consequently present hazards in manufacture, handling, storage and shipment. The contractor should recognize these hazards and take appropriate measures to guard and protect against fire, explosion, adverse environment, corrosive atmosphere, rougk, handling and elec%rically induced incidents. Custodian: Amy - MU Preparing Activity : Am - MU(FA) Project No. 1305-A738 7 E Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-