ARMY MIL-C-48881 B (3)-1992 CHARGE PROPELLING M205 LOADING ASSEMBLING AND PACKING《M205型装药推进器的装卸 组装和包装》.pdf

上传人:feelhesitate105 文档编号:441671 上传时间:2018-11-15 格式:PDF 页数:3 大小:101.58KB
下载 相关 举报
ARMY MIL-C-48881 B (3)-1992 CHARGE PROPELLING M205 LOADING ASSEMBLING AND PACKING《M205型装药推进器的装卸 组装和包装》.pdf_第1页
第1页 / 共3页
ARMY MIL-C-48881 B (3)-1992 CHARGE PROPELLING M205 LOADING ASSEMBLING AND PACKING《M205型装药推进器的装卸 组装和包装》.pdf_第2页
第2页 / 共3页
ARMY MIL-C-48881 B (3)-1992 CHARGE PROPELLING M205 LOADING ASSEMBLING AND PACKING《M205型装药推进器的装卸 组装和包装》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、MIL-C-41B (3) 13 9997906 1211027 102 = INCH-POUND I MIL-C-4 8881B (AR) AMENDMENT 3 - 25 September 1992 SUPERSEDING AMENDMENT 2 19 July 1985 MILITARY SPECIFICATION CHARGE, PROPELLING, M205 LOADING, ASSEMBLING, AND PACKING This amendment forms a part of MIL-C-48881B (AR), dated 11 March 1983, and is a

2、pproved for use by the U.S. Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 2 * 2.1.2, Delete: “9378773 - Container Assembly“ Under Drawings: Change title to drawing 9313721 as follows: “Packing and Marking fo

3、r Box, Fiberboard, Outer for Charge, Propelling or Container Assembly.“ O PAGE 3 3.6.1, Delete in its entirety and substitute: “3.6.1 Propelling charge. The propelling charge shall be free of dirt, grease, cracks, Sprits, cuts, tears, rips, holes, soft spots, seam separations or foreign material.“ P

4、AGE 7 4.4.2.1, Crit.ica1 2: Delete reference to Note (b). 1 of 3 AMSC N/A FSC 1315 DISTRIBUTICI. STATEMENT A. Approved for public re! ease; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48881B Amendment 3 4.4.2.1, u

5、nder Critical category, Delete Critical 3 and substitute the following: Para. Ref. Critical - AQL Reg. Para. - It 3 Container assembly 100% 3.2 Visual (4.5.5) or seal between top, bottom and closure damaged or unbonded to the extent that propellant can escape Major 103: Delete reference to Note (b).

6、 Under Major category Delete “Major 105“ and substitute the following: - Major - AQL Reg. Para. - Para. Ref. 105 Container assembly 100% 3.2 Visual (4.5.5) I or seal between top, bottom and closure damaged or unbonded but not to the extent that propellant can escape Notes: Delete Note (b) in it.s en

7、t.irety. PAGE 8 * 4.4.2.2, Title block - Delet-e “Packing and Marking for Box, Fiberboard, Outer for Charge, Propelling, M205 or Container Assembly“ and substitute: “Packing and Marking for Box, Fiberboard, Outer for Charge, Propelling or Container Assembly“ PAGE 11 * 4.5.1.2, Delete in its entirety

8、 and substitute the following: “4.5.1.2 Automated method. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I. MIL-C-48881B Amendment 3 4.5.1.2.1 Method 1. The contractor may elect to perform this operation with automated equipment. The automated equ

9、ipment shall weigh the container and place this weight in memory and then weigh the propellant before loading. After loading, the total weight of the container/propellant combination shall be weighted to verify complete loading by subtracting the increment weight (from memory) from the total loaded

10、propellant weight. 4.5.1.2.2 Method 2. The empty increments shall be sorted into discreet weight groupc with a minimum group range of 0.6 grains to minimize container weight variance. After the empty increments are sorted, they will be loaded by groups. The automated equipment shall weigh and check

11、wejgh the propellant before loading. After loading, the total weight of the container and propellant combination shall be weighed to verify complete loading by subtracting the increment group weight from the total weight to obtain the loaded propellant weight.“ PAGE 13 6.4: Delete in it.s entirety.

12、6.6: Delete in its entirety. NOTE: The margins of this amendment are marked with an asterisk to indicate where changes (additions, modifications, corrections, deletions) from the previous amendment were made. This was done as a convenience only and the Government assumes no liability whatsoever for

13、any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the margjrial notations and relationship to the last previous amendment. Custodian: Army-A R 3 P re par i ng ac t. i v i t y : Army-AR (Project 1315-AEll) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1