ARMY MIL-C-51177 B-1974 COUPLING CANISTER ABC-M1《ABC-M1型耦合霰弹》.pdf

上传人:ideacase155 文档编号:441785 上传时间:2018-11-15 格式:PDF 页数:6 大小:216.83KB
下载 相关 举报
ARMY MIL-C-51177 B-1974 COUPLING CANISTER ABC-M1《ABC-M1型耦合霰弹》.pdf_第1页
第1页 / 共6页
ARMY MIL-C-51177 B-1974 COUPLING CANISTER ABC-M1《ABC-M1型耦合霰弹》.pdf_第2页
第2页 / 共6页
ARMY MIL-C-51177 B-1974 COUPLING CANISTER ABC-M1《ABC-M1型耦合霰弹》.pdf_第3页
第3页 / 共6页
ARMY MIL-C-51177 B-1974 COUPLING CANISTER ABC-M1《ABC-M1型耦合霰弹》.pdf_第4页
第4页 / 共6页
ARMY MIL-C-51177 B-1974 COUPLING CANISTER ABC-M1《ABC-M1型耦合霰弹》.pdf_第5页
第5页 / 共6页
亲,该文档总共6页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1 Materials and components. 3.1.1 Ma,terials, All materials cited on Drawing D5-1-271 and on the subsidiary drawings shall conform to the specifications listed thereon, or to the specific characterist

2、ics set forth on the drawings. 3.1.2 Components. All components of the coupling shall conform to the specifications and drawings listed on Drawing D5-1-271 and subsidiary drawings. 3.2 Manufacture and assembly. The coupling shall be manufactured and assembled as specified on Drawing D5-1-271. 3.3 Wo

3、rkmanship, The coupling shall be free from abraded surfaces, burred or bent metal sections or foreign matter (dirt, oily or viscous material. ) 4 QUALITY ASSURANCE PROVISIONS 4 ,l Responsibility for inspection. 4.1.1 Suppliers responsibility. Unless otherwise specified in the con- tract or purchase

4、order, the supplier is responsible for the performance of all inspection requirements as specified herein. fied in the contract ox order, the supplier may use his own or any other facilities suitable for the performance of the inspection requirements speci- fied herein, unless disapproved by the Gov

5、ernment. The Government reserves the right to perform any of the inspections set forht in the specification where such inspections are deemed necessary to assure supplies and services conform to specified requirements. 4.1.2 Objective evidence I The supplier shall provide objective evidence acceptab

6、le to the contracting officer that the requirements of 3.1 and section 5 for which specific inspection has not been provided in this specification have been satisfied. Except as otherwise speci- 4.2 Quality conformance inspection. 4.2.1 Lottinq. A lot shall consist of the couplings produced by one m

7、anufacturer, at one plant, from the same materials, under essentially the same manufacturing conditions. 4.2.2 Sampling, Sampling shall be conducted in accordance with MIL-STD- 105, For minor defects level S-1 shall be used. 4.2.3 Inspection procedures Sample couplings shall be examined in accordanc

8、e with the classification of defects and MIL-STD-105, 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-C-SLL77B 42 9997706 0234625 7 p 4.2.3.1 Classification of defects, (a) Coupling, Canister, ABC-Mi. (Dwa. D5-1-271). Categories Defects Critic

9、al : None defined Major: AQL 0.65 percent defective 101 102 Workmanship (see 3.3) Cap-coupling surfaces not flush within O. 02 Minor : AQL 4 .O percent defective - 201 3.250 dimension 202 17/32 dimension 203 7/8 dimension 204 3/16 dimension 205 30 angle 206 3-1/8 dimension 207 3-27 /64 dimen s ion (

10、b) Connector (Dwg. C5-1-272). Categories Defect s Critical : None defined Major : AC& O. 65 percent defect ive 101 102 103 i04 105 i06 107 i08 109 110 111 112 113 Connector inside diameter incorrect Connector outside diameter Connector 0.865 dimension Connector O. 492 length Connector 53 agie Connec

11、tor 45 angle Connector 6 angle Connector 0.211 dimension Connector O. 080 dimension Connector O. 422 dimension Connector 0.187 dimension Connector 0.110 dimension Connector 0.109 dimension 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C -5 ll

12、77B ( EA ) 4.2.3.1 Classification $of defects (continued). (c) Connector (Dwg. D5-1-274). Categories Defects Critical : None defined Major: AQL 0.65 percent defective 101 Connector O .765 dimension 102 Connector 0,723 diameter 103 Connector machine finish 5. PREPMTION FOR DELImY 5.1 Packaping, packi

13、ng and marking, interplant shipment (see 6.3). The couplings shall be packaged and packed to afford adequate protection from the supplier to the first receiving activity for immediate use. Shipping containers shall comply with.the rules and regdations applicable to the mode of transportation, or ord

14、er, marking shall conform to FED-STD-123. In addition to any marking required by the contract 5.2 Repair part. When this item is procured for storage and issue as a repair part, preservation, packaging, packing and marking shall be as specified on the repair part packaging data sheet which is identi

15、fied by the National stock number for the repair part, 6. NOTES 6.1 Intended use. The coupling is intended to be used to couple the MiOA1 canister to the hose of chemical-biological items. 6.2 Ordering data. Procurement documents should specify the following: (a) (b) The title, number and date of th

16、is specification. The color of the rubber cap. 6.3 Interplant Shipments. Packaging, for supplies and materials which will not enter the military supply system. Typical interplant shipments are shipments from a vendor to a subcontractor or a prime contractor, or from a subcontractor to a prime contra

17、ctor, or from a vendor or contractor to a military arsenal or plant. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-WIL-C-SLL77B 42 W 9497706 0234627 2 W -* -? 6.4 International interest. Certain provisions of this specification are the subject of

18、 international standardization agreement QSTAG 216. When amendment, revision, or cancellation of this specification is pro- posed which will affect or violate the international agreement concerned, the preparing activity will take appropriate reconcilliation action through international ctandaridzat

19、ion channels including departmental stmdaridzation offices, if required. 6.5 Figure 1. Figure 1 is a miniature reproduction of assembly drawing and is attached for information only. Custodian : Preparing activity : Am - EA Project No. 4240-A643 QU.S. GOVERNMENT PRINTING OFFICE: 1974-603111/2815 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- L I i i .i i 5. L s . i c r - . ! Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf
  • BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf
  • BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf
  • BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf
  • BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf
  • BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf
  • BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf
  • BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf
  • BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ARMY

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1