ARMY MIL-C-63308 B (1)-1982 CORE FOR PROJECTILE 105MM APFSDS M774《M774型105MM核心弹丸脱壳》.pdf

上传人:花仙子 文档编号:442036 上传时间:2018-11-15 格式:PDF 页数:16 大小:560.82KB
下载 相关 举报
ARMY MIL-C-63308 B (1)-1982 CORE FOR PROJECTILE 105MM APFSDS M774《M774型105MM核心弹丸脱壳》.pdf_第1页
第1页 / 共16页
ARMY MIL-C-63308 B (1)-1982 CORE FOR PROJECTILE 105MM APFSDS M774《M774型105MM核心弹丸脱壳》.pdf_第2页
第2页 / 共16页
ARMY MIL-C-63308 B (1)-1982 CORE FOR PROJECTILE 105MM APFSDS M774《M774型105MM核心弹丸脱壳》.pdf_第3页
第3页 / 共16页
ARMY MIL-C-63308 B (1)-1982 CORE FOR PROJECTILE 105MM APFSDS M774《M774型105MM核心弹丸脱壳》.pdf_第4页
第4页 / 共16页
ARMY MIL-C-63308 B (1)-1982 CORE FOR PROJECTILE 105MM APFSDS M774《M774型105MM核心弹丸脱壳》.pdf_第5页
第5页 / 共16页
亲,该文档总共16页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、c - MIL-C-b330B (2) 23 I 7779706 03q7835 MILITARY SPECIFICATION s- 37-19 MIL-C-63308B (AR) AMENDMENT 1 10 November 1982 CORE, FOR PROJECTILE, 105MM, APFSDS, M774 This Amendment forms a part of Military Specification MIL-C-63308B (AR), dated 12 April 1982, and is approved for use by the US Army Armam

2、ent Research and Development Command, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 3 2.2, Other publications: Add reference to American Society for Testing Materials (ASTM) as follows: “ASTM E-29 Standard Recommended Practice for Indicating Which Places

3、 of Figures are to be Considered Significant in Specified Limiting Values“ PAGE 4 3.4: Delete in entirety and substitute: “3.4 (U) Identification number. Bar/core identification -r- shall be in accrd-ith the following criteria. 3.4.1 (U) Initial production. For the first 5000 cores - - manufactured

4、by a contractor, or as directed by the contracting officer, each bar/core shall be identified by a serial number consisting of, as a minimum, two alpha characters, a four digit melt or casting number, a one digit ingot or billet number, a one digit bar number identification and a two digit heat trea

5、tment batch number. The identification number shall be in accordance with the following sequence (for codes see 3.4.3): 01xxxx-wv-YY . FSC 1315 1 of 16 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-b330B (1) 13 77777Ob 03Li73b b I MIL-C-63308

6、B (AR) AMENDMENT 1 3.4.2 (U) Production identification. After completion of the first 5000 cores by a contractor, or as directed by the contracting officer, each bar/core shall be identified by a serial number consisting of, as a minimum, two alpha Characters I a four digit melt or casting number, a

7、 one digit heat treatment (aging batch) number and an optional three digit sequential core number . The identification number shall be in accordance with the following sequence (for codes see 3.4.3) : - - 01xxxx-Y-zzz 3.4.3 (U) Alpna and numerical characters. The alpha characters shall be assigned b

8、y-the contracting officer. The numerical characters shall be assigned by the contractor. 3.4.3.1 (U) Alpha characters. The alpha characters are identified as below: O = manufacturers code 1 = itein/procuring agency code. 3.4.3.2 (U) Numerical characters. The numerical characters are identified as be

9、low: W = ingot or billet number V = bar number for a specific ingot or billet XXXX = sequential melt/casting lot number (0001-9999) Y or YY = neat treatment/aging batch number (1, or 01, shall be used unless the melt is aged in more tnan one batch, i.e., use numbers 2-9, or 02-99, when melts are spl

10、it up and aged at different times or when melts are resolutionized and subsequently reaged.) zzz = sequential core number (001-999) .II PAGE 5 Add: 3.8.1 as follows: “3.8.1 (U) Cleaning aqents. Cleaning agents to be used shall be submisa for approval (see 6.5) and listed in the applicable process co

11、ntrol document (Pa) upon initial submission and whenever a change in cleaning agents is to be implemented .“ 2 (3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-b3308B (1) 13 W 7779706 03Li7837 8 MIL-C-63308B (AR) AMENDMENT 1 Add: 3.9 as follo

12、ws: “3.9 (U) Process control document. This document shall include descriptions of specified production processes 8 procedur es and equi pent (including i n-pr ocess inspection equipment) used to manufacture and inspect the production material as stipulated in the contract. The descriptions shall id

13、entify, as a minimum, the complete sequence of operations and schematic line layouts, basic fabrication processes (i .e . casting , for ginq 8 extrusion 8 machining 8 etc.) I fabrication equipment (i.e., type, model no., dies jigs, fixtures, etc.) 8 controls associated with fabrication processes (i.

14、e., times, temperatures, feeds, speeds, pressures, etc.) 8 associated processes (i.e. 8 heat treatment, stress relieving, plating, etc.) 8 controls on these associated processes (i .e . 8 equipment descriptions # times, temperatures, etc.) in-process inspections, gages and setups utilized and applic

15、able in-process inspection procedures . Process control documents shall be submitted in accordance witn DI-P-1604 (see 6.5.1). All initial and revised process control documents shall be submitted to DRDAR-QAT-A for review and disposition (see 6.5) .“ Add: 3.10 as follows: “3.10 (U) Eddy current insp

16、ection. Each core shall be inspected in accordance with paragraph 4.5.6. Calibration shall be performed using an approved-standard manufactured in accordance with drawing 9280323. The flat cylindrical sections shall be calibrated using a 0.010 inch deep by 0.100 inch long by 0.005 inch wide circumfe

17、rential slot and the grooves shall be calibrated using a 0.010 inch deep by 0.060 incn long by 0.005 inch wide circumferential slot. No core shall contain discontinuities which generate eddy current indications exceeding below. Core Area In3ected Last five grooves - All grooves except the last five

18、the reject criteria listed Reject Criteria in Percent of C ai i br a ti on S t andar d Response - Greater than or equal to 53 percent Greater tnan or equal to 80 percent 3 c :. :. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-C-633086 (1) 13 7

19、777706 0347838 T a MIL-63308B (AR) AMENDMENT 1 Reject Criteria in Percent of Calibration Standard - Core Area Inspected - First one inch of rear Greater than or -eaual Res pons e -r flat cylindrical section to 50 percent Rear f 1 at cy1 indr i cal Greater than or equal section except for the to 75 p

20、ercent“ first one inch and front flat cylindrical section 1 PAGE 7 Table I, under Bars (after heat treatment and before final machining), for Ultimate tensile strength, Elongation, and Yield Strength: Delete (b)“ and substitute II (b after the word equipnent“ add Iland procedur es . “ 4.5.1: Delete

21、in its entirety and substitute: “4.5.1 (U) Longitudinal hardness. The test shall be performed in accordance with ASTM E-18 using a cylindron anvil and the appropriate penetrator for the Rockwell C scale. Hardness readings shall be taken at three separate locations along the length of each bar; 1.0 +

22、 0.5 inch(2.54 + 1.27cm) from each end and + 0.5 inch (1.27cm) from the center. One reading shall be taken at each location and shall be oriented approximately 120 from one another . Readings shall be corrected in accordance with ASTM E-18. These readings shall then be rounded to the nearest integer

23、 in accordance with ASTM E-29. If any reading fails to meet the applicable drawing requirement, a retest shall be performed within 0.25 inch longitudinally frm the original measurement. No more than one retest is allowed at any one location. Failure to meet tne applicable drawing requirement at any

24、location, after any required retest, shall be criteria for rejection of the bar.“ 4.5.2.1: Delete in entirety and substi tute: “4.5.2.1 (U) Chemical composition of the ingot. Chemical composition, with respect to titanium and carbon content, shall be determined by analysis of one specimen from both

25、the top and bottom of every ingot (or front and rear OC extruded or rolled rod). All other required chernical properties shall be determined by analysis of one specimen from bOtn the top and bottom of one randomly chosen ingot from each melt. When reduced testing criteria is approved by the contract

26、ing officer, chemical composition, with respect to titanium and carbon content, shall be determined by analysis of one specimen from both the top ana bottom of three randomly cnosen ingots (or front and rear of extruded or rolled rod) from each melt. All other required chemical 6 Provided by IHSNot

27、for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-63308B (1) 13 3779706 0347841 T 6 MILK-63308B (AR) AMENDMENT 1 properties shall be determined by analysis of one specimen from the top of one randomly chosen ingot from each melt (see 4.5.2.1.1.1, 4.5.2.1.2.1 and 4.

28、5.2.1.3) . Failure of any specimen to meet the applicable drawing requirement, witn the exception of titanium and carbon content, shall be cause for rejection of the entire melt. Acceptance criteria for titanium and carbon content are described in paragrapns 4.5.2.1.1 and 4.5.2.1.2 respectively .II

29、PAGE 15 Add: 4.5.2.1.1.1 as follows: “4.5.2.1.1.1 ( testing criteria j. in accordance with ) Titanium content of the ingot (reduced Specimens shall be selected and tested the applicable drawing requirement for titanium content (0.69-0.79 percent) shall be criteria for testing the top and bottom of a

30、ll remaining ingots in that melt for titanium. In addition the ingot(s) which failed shall be subject to retest or rejection. A retest shall be permitted whenever the results of any specimen is in a range of either 0.64-0.68 percent or 0.80-0.84 percent titanium. The ingot shall be rejected and no r

31、etest permitted whenever the results of any specimen is less than 0.64 percent or greater than 0.84 percent titanium content. Failure beyond stated retest limits of one or more specimens from all three ingots initally tested shall be cause for rejection of the entire melt and retests shall not be pe

32、rmitted. A retest shail consist of testing two additional samples from eacn location which failed in the original test. If one or more retest specimens fails to meet the applicable requirement (0.69-0.79 percent), then the ingot in question shall be rejected. Failure of three or more ingots or rods

33、from the same melt, after retest (when applicable), shall be criteria for rejection of the entire melt. Retest provisions are applicable to all ingots tested,“ 7- 4.5.2.1. Failure of any specimen to meet - 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IH

34、S-,-,-MIL-C-b330B (1) 13 777770b 03q7842 1 MIL-C-63308B (AR) AMENDMENT 1 I Add: 4.5.2.1.2.1 as follows: “4.5. 2.1.2.1 (U testin9 cri teriai. w .- in accordance with ) Carbon content of the ingots (reduced Specimens shallbe selected and tested 4.5.2.1. Failure of any specimen to meet the applicable d

35、rawing requirement shall be criteria for testing of the top and bottom of all remaining ingots in that melt for carbon content. In addition, the ingot(s) which failed shall be subject to retest. A retest shall consist of two additional specimens being selected from the same location as the original

36、failure, except that the ingot or rod may first be cropped to remove non-conforming material at the contractors discretion. Any additional cropping for the purpose of a retest shall result in the scrapping of any material between the location of the original and retest specimens. Failure of one or m

37、ore of the retest specimens to ineet the applicable rawing requirement shall be criteria for rejection of that particular ingot or rod. Failure of three or more ingots or rods from the same melt, after retest (wnen applicable), shall be criteria for rejection of the entire melt. Retest provisions ar

38、e applicable to all ingots tested .I Add: 4.5.2.1.3 as follows: “4.5.2.1.3 (U) Reduced testing. criteria for trace elements. - When reduced testing is approved for tne trace elements (e, i, Cu, Si) 8 specimens shall be selected and tested in accordance with 4.5.2.1. If all test values are less than

39、90 percent of the drawing requirements then the melt lot is considered acceptable for the trace elements. If the test value for any trace element is equal to or greater than 90 percent of the drawing requirement(s) tnen chemical analysis for the trace element (s) which fall (s) within this range sha

40、ll be performed on the bottom of that same ingot. If any test value exceeds the drawing requirement (s) after retest, if applicable, then tnis shall be cause for rejection of tile entire melt lot. NO retest is permitted if any initial test value exceeds the drawing requirement (s) .“ 8 E Provided by

41、 IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-63308B (AR) AMENDMENT 1 4.5.2.2, last sentence: Delete in its entirety. PAGE 16 4.5.3: Delete in its entirety and substitute: “4.5.3 (U) Ultimate tensile strength, elongation and yield strength. Test specime

42、ns shall be selected in accordance with Figure 1, prepared in accordance with Fiqure 2 and tested in accordance witn ASTM E-8. shall be 0.045 inch (0.114cm) per minute to 0.055 inch (0.140cm) per minute. (See 6.11)“ Machine crosshead speed 4.5.4: Delete in its entirety and substitute: “4.5.4 (U) Har

43、dness profile. Test specimens shall be selected in accordance with Figure 1 and tested in accordance with ASTM E-18. Readings shall be taken at the center and on four (4) lines radiating approximately 900 . apart from the center. All readings shall be corrected in accordance with ASTM E-18 and shall

44、 then be rounded to the nearest integer in accordance witn ASTM E-29. The center reading shall be taken within a 0.0625 inch (0.1588cm) radius of tne center. Two readings shall be taken approximately 1800 apart and approximately 0.125 inch (0.318cm) from the circumferential edge of the specimen. Ano

45、ther two readings shall be taken at approximately mid-radius of the specimen. Each of these two readings shall be taken approximately 180 from each other and approximately 900 from the previous two readings. (See 6 . 11) “ 4.5.5, last sentence: Delete in its entirety. 4.5.5.1, last sentence: Delete

46、in its entirety. PAGE 18 4.5.6.3: Delete in its entirety and substitute: “4.5.6.3 (U) Personnel qualification and certification. Personnel performing tne eddy current inspection test in accordance- with paragraph 4.5.6 shall meet the qualification and certification requirements defined in MIL-STD-41

47、0 as detailed in the following paragraphs. 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- - flIL-C-b3308B (I) 23 m 777770b 0347844 5 m MIL-C-63308B (AR) AMENDMENT 1 4.5.6.3.1 (U) Set up and calibration. Level II. 4.5.6.3.2 (U) Operator. Level I.

48、4.5.6.3.3 (U) Certification procedures. The contractor shall prepare and submit for approval, in accordance with data item description number DI-S-3628 and the DD Form 1423, the detailed procedures for qualification and certification of personnel performing the nondestructive testing procedures requ

49、ired nerein.“ PAGE 19 4.5.7.1: -. Third sentence: Delete in its entirety. Fourth sentence: Delete in its entirety. Sixth sentence: Deete in its entirety. Seventn sentence: Delete in its entirety. 4.5.7.2: Delete in its entirety and substitute: “4.5.7.2 (U) Personnel qualification and certification. Personnel performing the ultrasonic inspection test in accordance with paragrapn 4.5.7 shall

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1