ARMY MIL-C-70474 (3)-1990 CHARGE PROPELLING M205 PAPER PREFORM PROCESS PARTS AND CONTAINER ASSEMBLY《M205型装药推进 纸张预制加工零件的集装箱装配》.pdf

上传人:registerpick115 文档编号:442127 上传时间:2018-11-15 格式:PDF 页数:3 大小:83.11KB
下载 相关 举报
ARMY MIL-C-70474 (3)-1990 CHARGE PROPELLING M205 PAPER PREFORM PROCESS PARTS AND CONTAINER ASSEMBLY《M205型装药推进 纸张预制加工零件的集装箱装配》.pdf_第1页
第1页 / 共3页
ARMY MIL-C-70474 (3)-1990 CHARGE PROPELLING M205 PAPER PREFORM PROCESS PARTS AND CONTAINER ASSEMBLY《M205型装药推进 纸张预制加工零件的集装箱装配》.pdf_第2页
第2页 / 共3页
ARMY MIL-C-70474 (3)-1990 CHARGE PROPELLING M205 PAPER PREFORM PROCESS PARTS AND CONTAINER ASSEMBLY《M205型装药推进 纸张预制加工零件的集装箱装配》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、c MIL-C-70474 (3) 13 = 777770b 0433363 2 - (INCH-POUND MIL-C-70474 (AR) AMENDMENT 3 5 March 1990 SUPERSEDING AMENDMENT 2 22 October 1988 MILITARY SPECIFICATION CHARGE, PROPELLING, k4205, PAPER PREFORM PROCESS PARTS AND CONTAINER ASSEMBLY This Amendment forms a part of Military Specification MIL-C-70

2、474 (AR), dated 8 June 1984, and is approved for use within the U.S. Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 1.1, Add the following sentence: “The M205 container assembly can be used for the propelli

3、ng charge on the Cartridge, 81MM, HE M821 and M889.I PAGE 4 * 3.8, Delete in its entirety. 3.13.1, Delete in its entirety and substitute: “3.13.1 Container parts and assemblies. The container parts and assemblies shall be free of dirt, grease, cracks, splits, cuts, tears, rips, holes, soft spots, se

4、am separations or foreign materials.“ PAGE 5 * 4.3.1, under Quantity column: Delete “398“ and substitute ii350.11 PAGE 7 * Table I: Delete Transportation-vibration test. 1 of 3 AMSC N/A c FSC I3l5 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot fo

5、r ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-70474 (AR) Amendment 3 PAGE 8 4.4.2, After the second sentence add the following: “These conditioning requirements apply to container assembly sample inspections (paragraph 4.4.2.5) that require gaging.“ PAGE 9 4.4.2.

6、21 Special A under Inspection Method, Delete: “(4.5.9)“ and substitute I (4.5.7) I. PAGE 10 4.4.2.31 Special A under Inspection Method, Delete: “(4.5.9)“ and substitute “(4.5.7)“. PAGE 11 4.4.2.41 Delete: Majors 101 and 102. PAGE 12 c 4.4.2.5 I Major 101 I under AQL column Delete: “100%11 and substi

7、tute “0.25%.“ 4.4.2.5, Add the following: Major “112 Incomplete bond betweem container top and bottom AQL Reg. Para. Ref. Para. O. 40% 3.2 Visual“ PAGE 15 4.4.3.31 Delete in its entirety. PAGE 19 4.5.2, Add the following sentence: “Test is considered destructive and samples should be removed from lo

8、t.“ 2 E Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-70474 (AR) Amendment 3 PAGE 20 4.5.3.1, Table 2, Delete: “M204“ and substitute “M205. I 4.5.3.2, Table 3, Delete: “M204“ and substitute “M205.“ PAGE 21 k 4.5.5: Delete in its entirety. NOT

9、E: The margins of this amendment are marked with an asterisk to indicate where changes (additions, modifications, corrections, deletions) from the previous amendment were made. This was done as a convenience only and the government assumes no liability whatsoever for any inaccuracies in these notati

10、ons. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Custodian: Army-AR c Y 3 Preparing activity: Army-AR (Project 1315-AC1 8) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1