ARMY MIL-C-71090 (3)-1995 CANISTER SMOKE ASSEMBLY FOR PROJECTILE PRACTICE 155MM M804E1《M804E1型155MM催泪霰弹射弹实践装配》.pdf

上传人:amazingpat195 文档编号:442252 上传时间:2018-11-15 格式:PDF 页数:6 大小:199.67KB
下载 相关 举报
ARMY MIL-C-71090 (3)-1995 CANISTER SMOKE ASSEMBLY FOR PROJECTILE PRACTICE 155MM M804E1《M804E1型155MM催泪霰弹射弹实践装配》.pdf_第1页
第1页 / 共6页
ARMY MIL-C-71090 (3)-1995 CANISTER SMOKE ASSEMBLY FOR PROJECTILE PRACTICE 155MM M804E1《M804E1型155MM催泪霰弹射弹实践装配》.pdf_第2页
第2页 / 共6页
ARMY MIL-C-71090 (3)-1995 CANISTER SMOKE ASSEMBLY FOR PROJECTILE PRACTICE 155MM M804E1《M804E1型155MM催泪霰弹射弹实践装配》.pdf_第3页
第3页 / 共6页
ARMY MIL-C-71090 (3)-1995 CANISTER SMOKE ASSEMBLY FOR PROJECTILE PRACTICE 155MM M804E1《M804E1型155MM催泪霰弹射弹实践装配》.pdf_第4页
第4页 / 共6页
ARMY MIL-C-71090 (3)-1995 CANISTER SMOKE ASSEMBLY FOR PROJECTILE PRACTICE 155MM M804E1《M804E1型155MM催泪霰弹射弹实践装配》.pdf_第5页
第5页 / 共6页
亲,该文档总共6页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、MIL-C-71090 (3) m 9999706 2002607 969 -1 MIL-C-71090 (AR) AMENDMENT 3 O9 May 1995 SUPERSEDING AMENDMENT 2 29 September 1994 MILITARY SPECIFICATION CANISTER SMOKE, ASSEMBLY FOR PROJECTILE, PRACTICE, 155MM, M804E1 This amendment forms a part of Military Specification L MIL-C-71090 (AR), dated 15 Novem

2、ber 1991, and is approved for use by the U.S. Army Armaments, Research, Development and Engineering Center and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 Title: Change, “M804E1“ to “M804Al“ PAGE 2 2.1.1 STANDARDS, MILITARY Delete : “MIL-STD-1218 - ACS C

3、hemicals“ 2.2 Non-government publications, ASTM Delete : “ASTM D2905 - Statement on Number of Specimens Required to Determine the Average Quality of Textile“ PAGE 3 3.3 Deiete in its entirety and substitute the following: “3.3 Smoke canister seal. The smoke canister assembly shall withstand a vacuum

4、 of 6.0 +/- 1.0 inches of mercury for a minimum period of 30 seconds without leakage.“ ABC NIA 1 of 6 FSC 1320 DISTR3UTION STATEMENT A. Approved for public release; distribution Is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-C-7109

5、0 (3) 9999906 2002608 8T5 e MIL-C-71090 (AR) AMENDMENT 3 3.7 Add the following: “3.7 Pr ovins ground. The smoke canister, when assembled into a projectile, fuzed, and tested as specified, shall upon ground impact functioning produce a smoke signature visible across 4000 meters of level terrain.“ 3.8

6、 Add the following: “3.8 Smoke mix process control. The process for weighing, mixing and dispensing the smoke mix and constituents thereof shall be established, and qualified by the first article proving ground test. Once qualified, changes to the equipment or procedures shall require prior approval

7、 of the contracting officer. Re-qualification shall also be required if in the opinion of the Government procuring activity, maintenance or repair to the mixing or dispensing mechanism effects process control parameters. The following process controls are mandatory: a. Weigh and check weigh each con

8、stituent prior to addition to blender. The check weigh shall be a different device by a different operator or inspector. b. Minimum mixing time shall be that used to mix the first article (qualification) batch(s) . c. Mixing speed shall be within plus or minus 10% of that used to mix the first artic

9、le (qualification) batch(s).“ PAGE 4 4.3.1, Line 6 Under “Quantity“ delete 20“ and substitute “25“ 4.3.2.1, Line 2, Delete “composition and“ PAGE 5 Delete “TABLE I“ and substitute the following included “TABLE I.“ PAGE 8 * 4.4.2.1 Change “Major defect, 101, Thickness, 0-1, L II, 3.2, Gage“ To: “Mino

10、r defect, 203, Thickness, 0-1, L IV, 3.2, Gage“ PAGE 11 4.4.2.4 Delete Major Defects 101 and 102 in their entirety and substitute: “101 Smoke canister seal Note 3, 3.3, 4.5.3 102 Mix process incorrect Note 1, 3.8, Visual“ 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without

11、 license from IHS-,-,-d rl N m Nrl N N N dLn d d d dd d d e Nb N N N mm m m m 44 O0 II Lno N rl O I I rl rl O O ln . Ln Ln I . . u) ci U o) ici a, a k -0 dW m u) u) ci ci u U o) o) (u (u aj aj a a Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C

12、-71090 (3) 9999906 2002610 453 MIL-C-71090 (AR) AMENDMENT 3 Add Note 3: “3. Sampling in accordance with 4.4.3.3.“ Delete 4.4.3.1, 4.4.3.1.1, 4.4.3.1.2, 4.4.3.1.2.1, 4.4.3.1.2.2 in their entirety and substitute: “4.4.3.1 Mixing process control. Prior to dispensing each batch (see 6.8) of smoke mix, t

13、he following process control checks shall be made: a. Check records of weigh and check weigh of all constituents. b. Check mixing time, minimum. c. Check mixing speed record for entire minimum time. d. Examine weighing and mixing area for evidence of spilled constituents in excess of 1% of batch wei

14、ght. (Do not include dispensing area.) If mixing time or speed are not as required, re-mix the batch for the required minimum time at the required speed. If the weigh and check weigh was not accomplished for any constituent, or if spilled constituents are in evidence, the batch shall be rejected . I

15、 PAGE 14 Delete 4.4.3.1.2.3 in its entirety. 4.4.3.3 Add the following: “4.4.3.3 Smoke canister seal. A sample of 8 smoke canister assemblies shall be taken, for leakage testing, produced from each seaming machine, from each eight (8) hour shift or fraction of a shift from machines in use. The rando

16、mly selected smoke canister assemblies to be used as samples and all smoke canister assemblies they represent, shall be identified for each machine and shift until all tests and examinations of 4.4.3.3 are complete. Component parts selected for assembly into leak test samples shall be loaded with in

17、ert composition and marked as inert prior to seaming. The leak test samples shall not be returned to the inspection lot.“ 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ _ MIL-C-71070 (3) 9999906 2002611 37T E3 MIL-C-71090 (AR) AMENDMENT 3 Delete

18、 4.5.1, 4.5.1.1 and 4.5.1.1.1 in their entirety and substitute: “4.5.1 Proving CI round. The sample smoke canister assemblies shall be assembled into M804A1, 155MM, projectiles and tested at a Government proving ground in accordance with the applicable acceptance test procedure. Projectiles shall be

19、 fuzed with an M739 series PD fuze set “PD“. The projectiles shall be fired in a M185 or M199 Series cannon using a M119A1, Zone 8 charge. Chamber pressures will be based on copper pressure gages. The projectiles and propelling charges shall be uniformly temperature conditioned to 21 degrees Celsius

20、 (70 degrees F) plus or minus 1 degree Celsius (2 degrees F) for a minimum of 24 hours prior to testing. Adequate photographic and instrumental coverage shall be provided to assure compliance with requirements. Range and deflections shall be recorded for informational purposes only. An observer shal

21、l be stationed 4000 2 200 meters from the edge of the impact area to record presence of smoke signature. The test shall be conducted on level terrain and the wind velocity shall not exceed 15 knots at the time of testing.“ PAGE 17 Delete 4.5.1.1.2 and 4.5.1.1.3 in their entirety. PAGE 18 4.5.3 Delet

22、e in its entirety and substitute the following: “4.5.3 Smoke canister seal. Place inert smoke canister assembly in fixture and close lid. Start vacuum. Lower canister into water. After gage shows 6.0 +/-1“ of mercury, observe canister for a minimum of 30 seconds. Raise the canister out of the water.

23、 Release vacuum. Raise the lid, remove the canister, and dry off. Set aside the canister for scrap. If the canister is a reject, then identify the seaming machine that produced the reject, and reject all canisters produced by that seaming machine since the last acceptable leak test sample. II PAGE 1

24、9 Delete 6.2 d., 6.2 e. and 6.2 f. in their entirety. 6.3, Lines 3 and 4, Delete “Commander, U.S. Army Armament, Munitions and Chemical Command, ATTN: SMCAR-QAR-I(D), Picatinny Arsenal NJ 07806-5000.“ and substitute “Commander, U.S. Army ARDEC, ATTN: AMSTA-AR-QAA-R, Picatinny Arsenal, NJ 07806-5000.

25、 l. * 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-71090 (AR) AMENDMENT 3 PAGE 20 6.6, Line 6: * Delete: “PMCAR-CCH-P and SMCAR-QAR-Q(D)“ and Substitute: “AMSTA-AR-FSA-M and AMSTA-AR-QAA-R“ * 6.9, Line 4 : Delete, “SMCAR-QAR-Q(D) I and sub

26、stitute “ AMSTA -AR - QAA - RI 6.10 Delete in its entirety. PAGE 21 6.12 Delete : “Air Pressure test“ Substitute: “Smoke canister seal“ The margins of this amendment are marked with an asterisk or vertical line to indicate where changes (additions, modifications, corrections, deletions) from the pre

27、vious amendment were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment. Custodian: Army - AR Preparing activity: Army - AR (Project 1320-0012) 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1